The Fourth Plenary Session of the 17th Central Committee of the Communist Party of China (CPC) closed in Beijing on September 18, with pledges to expand intra-Party democracy and resolutely fight corruption. A total o... The Fourth Plenary Session of the 17th Central Committee of the Communist Party of China (CPC) closed in Beijing on September 18, with pledges to expand intra-Party democracy and resolutely fight corruption. A total of 194 full members and 163 alternate members of the committee, the Party’s top decision-making body, attended the four-day plenum, which was presided over by its Political Bureau. Hu Jintao, General Secretary of the CPC Central Committee, delivered a work report at the meeting. 展开更多
关键词 CPC Outlines self-building Priorities
原文传递
Analysis of Causes of Delay in Middle and High Income Self-Build Housing Projects (SBHPs) in Wa, Ghana
2
作者 Samuel Owusu Afram Anthony Bangdome-Dery +1 位作者 Genevieve Ekua Eghan Titus Ebenezer Kwofie 《Journal of Building Construction and Planning Research》 2015年第4期171-179,共9页
Self-build housing projects (SBHPs) among middle and high income developers are faced with many challenges that cause delay in the delivery time of the house(s). The focus of this paper is to analyse the factors that ... Self-build housing projects (SBHPs) among middle and high income developers are faced with many challenges that cause delay in the delivery time of the house(s). The focus of this paper is to analyse the factors that cause delay in SBHPs in order to identify the critical delay factors. Review of literature and expert input revealed 20 variables which were used in a structured questionnaire for data collection from owners, consultants and builders in Wa Municipality. Reliability test, t-test analysis and mean ranking were used in the data analysis. The results revealed that “Delay in obtaining permit from Local Authorities” was the first delay factor followed by “Poor site management and supervision”. The delay factor ranked least was “Inadequate cost estimation and related details” from consultants. The paper recommends that Government agencies that regulate physical development should intensify public education, particularly on responsibilities and obligations, especially among self-builders. The paper recommends further study into labour-related issues as well as communication and information management among participants and its impact on self-build project success. 展开更多
关键词 DELAYS self-build HOUSING PROJECTS Ghana
下载PDF
居民自建:规划之外的地方实践与地方智慧--以陕西省汉阴老城的更新与发展为例
3
作者 Zhao Xu Zhang Wenjia Yin Jie 《China City Planning Review》 CSCD 2020年第4期47-55,共9页
This paper focuses on the phenomenon of residents’self-build structures in the old city of Hanyin County since the 1980 s,and draws the following conclusions:firstly,regarding the local policies formed in the process... This paper focuses on the phenomenon of residents’self-build structures in the old city of Hanyin County since the 1980 s,and draws the following conclusions:firstly,regarding the local policies formed in the process of local practice beyond planning,i.e.,"neighbors’consent,""cooperative building,"and"building setback at no charge;"secondly,that the legal interpretation of neighboring relations is the legal basis for the rationalization of the policy beyond planning;thirdly,the local government’s selective use of planning tools and its cooperation with residents reflects the local wisdom,which helps to promote urban renewal at a lower cost. 展开更多
关键词 residents’self-build beyond planning local policy urban renewal Hanyin County
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部