The Administrative Board of theLianyungang Development Zone isan executive administrative organimplementing unified leadership andmanagement over the development zone onbehalf of the Lianyungang People’sgovernment. A...The Administrative Board of theLianyungang Development Zone isan executive administrative organimplementing unified leadership andmanagement over the development zone onbehalf of the Lianyungang People’sgovernment. According to the State’s lawsand regulations, the administrative board isresponsible for construction planning for thedevelopment zone, the execution of economicdevelopment programmes, the approval ofinvestment projects worth RMB30 millionor less, land use and building design, boostingpublic welfare in education, culture andsanitation, public security in the zone, andprotecting the legal rights of the展开更多
This paper studies the administrative service standards system construction and application in Tai'An, China's first administrative service standardization demonstration city, proposes a new way for local government...This paper studies the administrative service standards system construction and application in Tai'An, China's first administrative service standardization demonstration city, proposes a new way for local government to strengthen self-improvement and elevate the public satisfacton level, and provides important technical support for service-oriented governmental administration mode explorations.展开更多
1.Major foreign-relatedadministrative organizations: The Foreign-related Office of the HebeiProvincial People’s GovernmentThe Merchants Company of Hebei ProvinceAddress:Weiming Street No.10,Shijiazhuang,Hebei,ChinaTe...1.Major foreign-relatedadministrative organizations: The Foreign-related Office of the HebeiProvincial People’s GovernmentThe Merchants Company of Hebei ProvinceAddress:Weiming Street No.10,Shijiazhuang,Hebei,ChinaTel:7042603 7042605 7092417Fax:(86)311-7042602展开更多
The vulnerability of reinforced concrete(RC)building systems to progressive collapse has turned out to be a challenging trouble for professional structural engineers so as to prevent total failure on account of ...The vulnerability of reinforced concrete(RC)building systems to progressive collapse has turned out to be a challenging trouble for professional structural engineers so as to prevent total failure on account of nearby damage.The goal of this paper is to enhance the knowledge of such buildings’behavior underneath several scenarios of misplaced columns at different floor stages,and their capacity for progressive collapse.The homes had been analyzed following the guidelines for progressive collapse evaluation and design organized by means of the general services administration guidelines(GSA).The progressive collapse of a ten story structure subjected to a simplest gravity load is taken into consideration and the column has been eliminated at one place and the spread damage is evaluated.The progressive collapse study has been carried out by way of removing the column at a diagnosed crucial locations(at corner,middle and at interior)as in line with GSA guidelines.Static analysis is done using analysis program ETABS.For each case,the consequences were taken in terms of demand capacity ratio(DCR)at critical section,and as a result the structure has been assessed for it’s susceptible to progressive collapse.The availability of shear wall is made on the component wherein collapse occurred and DCR values are mentioned.After imparting the shear wall to the structure,the progressive collapse of the structure because of accidental load may be controlled in order that the GSA guidelines recommended DCR value would be within the range.展开更多
文摘The Administrative Board of theLianyungang Development Zone isan executive administrative organimplementing unified leadership andmanagement over the development zone onbehalf of the Lianyungang People’sgovernment. According to the State’s lawsand regulations, the administrative board isresponsible for construction planning for thedevelopment zone, the execution of economicdevelopment programmes, the approval ofinvestment projects worth RMB30 millionor less, land use and building design, boostingpublic welfare in education, culture andsanitation, public security in the zone, andprotecting the legal rights of the
文摘This paper studies the administrative service standards system construction and application in Tai'An, China's first administrative service standardization demonstration city, proposes a new way for local government to strengthen self-improvement and elevate the public satisfacton level, and provides important technical support for service-oriented governmental administration mode explorations.
文摘1.Major foreign-relatedadministrative organizations: The Foreign-related Office of the HebeiProvincial People’s GovernmentThe Merchants Company of Hebei ProvinceAddress:Weiming Street No.10,Shijiazhuang,Hebei,ChinaTel:7042603 7042605 7092417Fax:(86)311-7042602
文摘The vulnerability of reinforced concrete(RC)building systems to progressive collapse has turned out to be a challenging trouble for professional structural engineers so as to prevent total failure on account of nearby damage.The goal of this paper is to enhance the knowledge of such buildings’behavior underneath several scenarios of misplaced columns at different floor stages,and their capacity for progressive collapse.The homes had been analyzed following the guidelines for progressive collapse evaluation and design organized by means of the general services administration guidelines(GSA).The progressive collapse of a ten story structure subjected to a simplest gravity load is taken into consideration and the column has been eliminated at one place and the spread damage is evaluated.The progressive collapse study has been carried out by way of removing the column at a diagnosed crucial locations(at corner,middle and at interior)as in line with GSA guidelines.Static analysis is done using analysis program ETABS.For each case,the consequences were taken in terms of demand capacity ratio(DCR)at critical section,and as a result the structure has been assessed for it’s susceptible to progressive collapse.The availability of shear wall is made on the component wherein collapse occurred and DCR values are mentioned.After imparting the shear wall to the structure,the progressive collapse of the structure because of accidental load may be controlled in order that the GSA guidelines recommended DCR value would be within the range.