The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This stu...The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects.展开更多
The high-speed railway construction involves multiple professional fields,such as railway design,construction,and supervision.This paper architects the"BIM+"project refined management platform,designs the pl...The high-speed railway construction involves multiple professional fields,such as railway design,construction,and supervision.This paper architects the"BIM+"project refined management platform,designs the platform's logical architecture,physical architecture,and solves several key technology difficulties.This"BIM+"platform has been applied on the Jingxiong Bridge Project and achieved all-round,whole-process and multi-management of high-speed railway engineering construction.It significantly improves the level of construction management,and plays a role in promoting the development of high-speed railway construction informatization.展开更多
Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide ...Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for each tug, a particle swarm-based translation control method is presented for non-power immersed tunnel element. A sort of linear weighted logarithmic function is exploited to avoid weak subgoals. In simulation, the particle swarm-based control method is evaluated and compared with traditional empirical method in the case of the HZMB project. Simulation results show that the presented method delivers performance improvement in terms of the enhanced surplus towing force.展开更多
The paper analyzes existing state of innovation system in the field of public infrastructure construction in China and elaborates on the duty and role of owner in establishment of a technical innovation system with en...The paper analyzes existing state of innovation system in the field of public infrastructure construction in China and elaborates on the duty and role of owner in establishment of a technical innovation system with enterprise as the main body following the process of production-education-research.This paper also claims that the key project construction is an important resource to enhance national capability of innovation and accordingly puts forward an effective approach to cultivate the core competitiveness of leading enterprises on the basis of practice in the Sutong Bridge project.展开更多
Land bridge transportation means transportation from one seaport to another by railway across continents instead of by ocean ship. At present, there are two common routes for using land bridge transportation in the wo...Land bridge transportation means transportation from one seaport to another by railway across continents instead of by ocean ship. At present, there are two common routes for using land bridge transportation in the world. One is Asia-America-Europe land bridge, the other is Europe-Asia land bridge.Eurasia land bridge has obvious advantages over Asia-America-Europe land bridge due to its shorter distance, shorter transportation time and special freight rate. China started Eurasia land bridge transportation business in 1980. It mainly used the mode of railway-railway combined transportation. The comparison between using Eurasia land bridge and using shipping transportation from China to Northern and Western Europe shows that Euraria land bridge transportation can save time and get foreign exchange in time, and commodity turnover will be speeded up. According to the port layout and railway network structure, China’s land bridge transportation projects are proposed. They are Suifenhe project, Dalian展开更多
In order to study the seismic performance of typical approach bridge for port project, the seismic vulnerability model was created. 100 of the earthquake motion records are selected from the database of Pacific Earthq...In order to study the seismic performance of typical approach bridge for port project, the seismic vulnerability model was created. 100 of the earthquake motion records are selected from the database of Pacific Earthquake Research Centre, In order to obtain the maximum responses of structure dynamic response, the model was calculated by using non-linear time history analysis. Then reliability analysis method was used to generate the fragility curves of bridge components. And compared two kinds of bearing made differences to structure' s vulnerability. Researches show that bearing is easy to breakdown with earthquake action. Isolation bearing has good effect, and significantly reduces failure probability, fmaUy the fragility curves obtained can be used to evaluate the seismic performance of continuous beam bridge for port project, and provide the basis for seismic design of bridges for port project.展开更多
随着信息技术的快速发展,建筑信息模型(Building Information Modeling,BIM)在建筑行业中的应用日益广泛。本论文针对路桥项目的特殊性,以解决实际问题为目标,探讨了BIM在路桥项目管理与协调中的应用[1]。通过对实际项目的案例研究,提...随着信息技术的快速发展,建筑信息模型(Building Information Modeling,BIM)在建筑行业中的应用日益广泛。本论文针对路桥项目的特殊性,以解决实际问题为目标,探讨了BIM在路桥项目管理与协调中的应用[1]。通过对实际项目的案例研究,提出了一套基于BIM的路桥项目管理与协调的方法和工具,以优化项目的生命周期管理和提高项目的整体效率。本研究为路桥项目的实际应用提供了有益的参考和指导。展开更多
文摘The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects.
基金supported by China State Railway Group Co.,Ltd.Science and Technology Research and Development Plan(K2021G025).
文摘The high-speed railway construction involves multiple professional fields,such as railway design,construction,and supervision.This paper architects the"BIM+"project refined management platform,designs the platform's logical architecture,physical architecture,and solves several key technology difficulties.This"BIM+"platform has been applied on the Jingxiong Bridge Project and achieved all-round,whole-process and multi-management of high-speed railway engineering construction.It significantly improves the level of construction management,and plays a role in promoting the development of high-speed railway construction informatization.
基金financially supported by the Ministry of Education of Humanities and Social Science Project(Grant Nos.15YJC630145 and 15YJC630059)the Natural Science Foundation of Shanghai Science and Technology Committee(Grant No.15ZR1420200)
文摘Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for each tug, a particle swarm-based translation control method is presented for non-power immersed tunnel element. A sort of linear weighted logarithmic function is exploited to avoid weak subgoals. In simulation, the particle swarm-based control method is evaluated and compared with traditional empirical method in the case of the HZMB project. Simulation results show that the presented method delivers performance improvement in terms of the enhanced surplus towing force.
基金National Science and Technology Support Program(No.2006BAG04B06)
文摘The paper analyzes existing state of innovation system in the field of public infrastructure construction in China and elaborates on the duty and role of owner in establishment of a technical innovation system with enterprise as the main body following the process of production-education-research.This paper also claims that the key project construction is an important resource to enhance national capability of innovation and accordingly puts forward an effective approach to cultivate the core competitiveness of leading enterprises on the basis of practice in the Sutong Bridge project.
文摘Land bridge transportation means transportation from one seaport to another by railway across continents instead of by ocean ship. At present, there are two common routes for using land bridge transportation in the world. One is Asia-America-Europe land bridge, the other is Europe-Asia land bridge.Eurasia land bridge has obvious advantages over Asia-America-Europe land bridge due to its shorter distance, shorter transportation time and special freight rate. China started Eurasia land bridge transportation business in 1980. It mainly used the mode of railway-railway combined transportation. The comparison between using Eurasia land bridge and using shipping transportation from China to Northern and Western Europe shows that Euraria land bridge transportation can save time and get foreign exchange in time, and commodity turnover will be speeded up. According to the port layout and railway network structure, China’s land bridge transportation projects are proposed. They are Suifenhe project, Dalian
文摘In order to study the seismic performance of typical approach bridge for port project, the seismic vulnerability model was created. 100 of the earthquake motion records are selected from the database of Pacific Earthquake Research Centre, In order to obtain the maximum responses of structure dynamic response, the model was calculated by using non-linear time history analysis. Then reliability analysis method was used to generate the fragility curves of bridge components. And compared two kinds of bearing made differences to structure' s vulnerability. Researches show that bearing is easy to breakdown with earthquake action. Isolation bearing has good effect, and significantly reduces failure probability, fmaUy the fragility curves obtained can be used to evaluate the seismic performance of continuous beam bridge for port project, and provide the basis for seismic design of bridges for port project.
文摘随着信息技术的快速发展,建筑信息模型(Building Information Modeling,BIM)在建筑行业中的应用日益广泛。本论文针对路桥项目的特殊性,以解决实际问题为目标,探讨了BIM在路桥项目管理与协调中的应用[1]。通过对实际项目的案例研究,提出了一套基于BIM的路桥项目管理与协调的方法和工具,以优化项目的生命周期管理和提高项目的整体效率。本研究为路桥项目的实际应用提供了有益的参考和指导。