期刊文献+
共找到290篇文章
< 1 2 15 >
每页显示 20 50 100
Experimental study on the influences of cutter geometry and material on scraper wear during shield TBM tunnelling in abrasive sandy ground
1
作者 Shaohui Tang Xiaoping Zhang +3 位作者 Quansheng Liu Qi Zhang Xinfang Li Haojie Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第2期410-425,共16页
When shield TBM tunnelling in abrasive sandy ground,the rational design of cutter parameters is critical to reduce tool wear and improve tunnelling efficiency.However,the influence mechanism of cutter parameters on sc... When shield TBM tunnelling in abrasive sandy ground,the rational design of cutter parameters is critical to reduce tool wear and improve tunnelling efficiency.However,the influence mechanism of cutter parameters on scraper wear remains unclear due to the lack of a reliable test method.Geometry and material optimisation are often based on subjective experience,which is unfavourable for improving scraper geological adaptability.In the present study,the newly developed WHU-SAT soil abrasion test was used to evaluate the variation in scraper wear with cutter geometry,material and hardness.The influence mechanism of cutter parameters on scraper wear has been revealed according to the scratch characteristics of the scraper surface.Cutter geometry and material parameters have been optimised to reduce scraper wear.The results indicate that the variation in scraper wear with cutter geometry is related to the cutting resistance,frictional resistance and stress distribution.An appropriate increase in the front angle(or back angle)reduces the cutting resistance(or frictional resistance),while an excessive increase in the front angle(or back angle)reduces the edge angle and causes stress concentration.The optimal front angle,back angle and edge angle for quartz sand samples areα=25°,β=10°andγ=55°,respectively.The wear resistance of the modelled scrapers made of different metal materials is related to the chemical elements and microstructure.The wear resistances of the modelled scrapers made of 45#,06Cr19Ni10,42CrMo4 and 40CrNiMoA are 0.569,0.661,0.691 and 0.728 times those made of WC-Co,respectively.When the alloy hardness is less than 47 HRC(or greater than 58 HRC),scraper wear decreases slowly with increasing alloy hardness as the scratch depth of the particle asperity on the metal surface stabilizes at a high(or low)level.However,when the alloy hardness is between 47 HRC and 58 HRC,scraper wear decreases rapidly with increasing alloy hardness as the scratch depth transitions from high to low levels.The sensitive hardness interval and recommended hardness interval for quartz sand are[47,58]and[58,62],respectively.The present study provides a reference for optimising scraper parameters and improving cutterhead adaptability in abrasive sandy ground tunnelling. 展开更多
关键词 shield tbm Scraper wear Cutter shape Metal material Alloy hardness
下载PDF
TBM豆砾石回填灌浆层性能与密实度对支护效果的影响
2
作者 杨风威 金俊超 杨凡杰 《人民黄河》 CAS 北大核心 2024年第1期139-145,共7页
双护盾TBM采用预制管片、回填豆砾石和灌浆的方式进行支护施工,豆砾石回填灌浆层的性能和密实度是影响TBM隧洞工作性能的重要指标。以西北某双护盾TBM施工的引水隧洞为工程依托,基于室内试验研究了不同部位豆砾石回填灌浆层的力学性能,... 双护盾TBM采用预制管片、回填豆砾石和灌浆的方式进行支护施工,豆砾石回填灌浆层的性能和密实度是影响TBM隧洞工作性能的重要指标。以西北某双护盾TBM施工的引水隧洞为工程依托,基于室内试验研究了不同部位豆砾石回填灌浆层的力学性能,并通过数值模拟分析了豆砾石回填灌浆层性能与密实度对支护效果的影响。结果表明:受灌浆密实度不均匀的影响,豆砾石灌浆体的弹性模量和单轴抗压强度存在较大差异;在衬砌与豆砾石不存在脱空状态的条件下,豆砾石回填灌浆层参数取值不同对衬砌受力分布规律影响不大,但衬砌各个部位的应力有所变化;衬砌与豆砾石脱空部位受力状态与不脱空时存在显著差异,在脱空部位管片出现了较为明显的受力情况,部分区域应力超过衬砌混凝土的抗拉强度设计值,衬砌混凝土可能出现裂缝。在隧洞施工中应重点关注衬砌与豆砾石之间结合是否紧密,加强豆砾石回填、灌浆的质量监督。 展开更多
关键词 双护盾tbm 隧洞施工 豆砾石回填灌浆 管片衬砌 灌浆层密实度 支护效果
下载PDF
护盾式TBM抱盾现象的形成机制与预测
3
作者 玉博 郑玮 刘进 《水利水电工程设计》 2024年第2期23-27,共5页
主要针对护盾式TBM法施工隧洞掘进过程中发生的“洞抱盾”问题进行研究,分析了围岩变形等因素造成TBM抱盾的成生机制,提出了预测方法与风险评估思路,用于前期勘察设计阶段的TBM抱盾卡机预测和评价。
关键词 护盾式tbm 抱盾 围岩大变形 风险分析
下载PDF
影响双护盾TBM掘进效率的地质因素及对策研究
4
作者 杨继华 魏建鹏 +2 位作者 王志强 杨风威 齐三红 《人民长江》 北大核心 2024年第6期188-193,210,共7页
针对地质因素影响TBM掘进效率的问题,以兰州市水源地建设工程输水隧洞双护盾TBM施工为背景,采用现场调查、数据统计的方法,分析了岩石单轴抗压强度、岩体完整性、岩石石英含量、地应力、地下水等对TBM施工的影响,并针对各种地质因素提出... 针对地质因素影响TBM掘进效率的问题,以兰州市水源地建设工程输水隧洞双护盾TBM施工为背景,采用现场调查、数据统计的方法,分析了岩石单轴抗压强度、岩体完整性、岩石石英含量、地应力、地下水等对TBM施工的影响,并针对各种地质因素提出了TBM施工对策。结果表明:①当岩石单轴抗压强度R_(c)在50~80 MPa时,TBM施工速度最高,日进尺可达30 m以上;当R_(c)低于50 MPa时,施工速度随强度的降低而降低;当R_(c)大于80 MPa时,TBM施工速度随R_(c)的增加而降低。②当岩体完整性系数K_(v)在0.40~0.60时,施工速度最高;当K_(v)大于0.60时,施工速度随着K_(v)的增加而降低;当K_(v)小于0.4时,施工速度随着K_(v)的降低而降低。③岩石的石英含量越低,地应力水平越低,地下水越少,对TBM施工越为有利。研究结果可为类似工程的TBM地质适宜性评价及施工方法提供参考。 展开更多
关键词 输水隧洞 双护盾tbm 施工效率 地质因素 兰州市水源地建设工程
下载PDF
软岩中TBM停机状态下岩机相互作用规律研究
5
作者 司才龙 侯亚鹏 刘高 《人民长江》 北大核心 2024年第2期164-170,共7页
在软岩环境下使用TBM施工时,遇卡机等事故处理和设备检修更换常需TBM停机,预留变形量和停机时间是TBM安全运行的关键。依托白龙江引水工程六盘山泥岩隧洞,根据实际地质条件、隧道结构和TBM施工流程,采用数值计算的方法研究了TBM停机状... 在软岩环境下使用TBM施工时,遇卡机等事故处理和设备检修更换常需TBM停机,预留变形量和停机时间是TBM安全运行的关键。依托白龙江引水工程六盘山泥岩隧洞,根据实际地质条件、隧道结构和TBM施工流程,采用数值计算的方法研究了TBM停机状态下围岩的变形特征及其与护盾的相互作用,并分析了合理的预留变形量和停机时间。结果表明:①该工程砂质泥岩为极软岩,流变性显著且服从Cvisc和Burgers模型,预留足够的变形量和快速掘进可保证TBM安全通过;②在停机期间,围岩变形具有显著时空效应,变形先快后慢,垂直位移大于水平位移,护盾后部围岩位移大于前部;③岩机相互作用的时空效应表现为,自下而上、由后至前,相继经历无接触-局部接触-完全接触-强烈挤压的过程;④预留变形为10 cm时的TBM安全停机时间不宜超过7 d。研究成果对认识软岩中TBM停机期间岩机相互作用具有理论参考意义。 展开更多
关键词 软岩 tbm 停机时间 流变 岩机相互作用 Cvisc模型 六盘山隧洞
下载PDF
特长引水隧道小断面双护盾TBM快速施工技术
6
作者 胡天然 《路基工程》 2024年第2期191-194,共4页
依托南亚某国特长引水隧道工程,对影响小断面双护盾TBM施工进度的地质条件、资源组织、技术方案、环境等因素进行分析,通过科学的管理理念和多种技术措施,以及适宜的制度建设和精细化的过程控制,提升掘进效率,TBM施工进度屡次实现重大... 依托南亚某国特长引水隧道工程,对影响小断面双护盾TBM施工进度的地质条件、资源组织、技术方案、环境等因素进行分析,通过科学的管理理念和多种技术措施,以及适宜的制度建设和精细化的过程控制,提升掘进效率,TBM施工进度屡次实现重大突破。 展开更多
关键词 复杂条件 双护盾tbm 超前预报 五步注浆 快速掘进 风险管控 经济性
下载PDF
双护盾TBM穿越断层卡机分析及脱困工艺应用
7
作者 李进平 《山西水利科技》 2024年第1期10-12,19,共4页
TBM对不良地质围岩适应能力较差,遇到断层带处可能出现卡机情况,TBM的卡机处理费时、费工,成为制约TBM快速掘进的主要因素之一。对东山供水工程施工十一标双护盾TBM穿越F14断层时的卡机过程、地质条件、原因、脱困对策和工艺、脱困后的... TBM对不良地质围岩适应能力较差,遇到断层带处可能出现卡机情况,TBM的卡机处理费时、费工,成为制约TBM快速掘进的主要因素之一。对东山供水工程施工十一标双护盾TBM穿越F14断层时的卡机过程、地质条件、原因、脱困对策和工艺、脱困后的措施进行了详细地介绍和总结,可为类似工程提供参考。 展开更多
关键词 东山供水 双护盾tbm 脱困工艺、脱困措施
下载PDF
双模(EPB/TBM)盾构模式转换技术工程实践
8
作者 张强 高志勇 吕晨熙 《江苏建筑》 2024年第1期82-85,共4页
双模盾构机为地质起伏变化较大的盾构隧道工程而设计,通过对平衡模式的切换来适应不同地质环境下盾构的高效施工掘进。深惠城际平湖站至凤岗站区间因具有前段、后段为上软下硬地质,中段为全断面岩层地质的特点而采用EPB/TBM双模盾构施工... 双模盾构机为地质起伏变化较大的盾构隧道工程而设计,通过对平衡模式的切换来适应不同地质环境下盾构的高效施工掘进。深惠城际平湖站至凤岗站区间因具有前段、后段为上软下硬地质,中段为全断面岩层地质的特点而采用EPB/TBM双模盾构施工,其间,需要切换模式4次。文章就盾构机模式切换的方法进行系统的阐述。 展开更多
关键词 双模盾构机 EPB/tbm 模式转换施工技术
下载PDF
双盾敞开式TBM适应性与工程应用对比分析 被引量:2
9
作者 杜立杰 张正 +4 位作者 李青蔚 张卫东 杜传奇 刘家驿 杨亚磊 《隧道建设(中英文)》 CSCD 北大核心 2023年第6期921-928,共8页
为分析验证新型双盾敞开式TBM与传统主梁敞开式TBM的优缺点,以北江引水工程和那邦电站工程2个采用不同敞开式TBM机型的工程为例,首先,从主机结构、支护设备布置、施工优缺点等方面进行理论对比分析;然后,从掘进时间利用率、施工速度、... 为分析验证新型双盾敞开式TBM与传统主梁敞开式TBM的优缺点,以北江引水工程和那邦电站工程2个采用不同敞开式TBM机型的工程为例,首先,从主机结构、支护设备布置、施工优缺点等方面进行理论对比分析;然后,从掘进时间利用率、施工速度、地质适应性等方面进行工程应用效果对比。结果表明:1)双盾敞开式TBM在完整或较完整的Ⅱ类和Ⅲ类围岩条件下的施工速度与主梁敞开式TBM基本相当;2)在Ⅳ类和Ⅴ类围岩或断层破碎带条件下,双盾敞开式TBM的施工速度和适应性较差。建议完整或较完整围岩占比大、断层破碎围岩占比很小的小直径隧洞工程以及小转弯半径隧洞工程的施工,可选用新型双盾敞开式TBM。 展开更多
关键词 双盾敞开式tbm 主梁敞开式tbm 掘进性能 适应性
下载PDF
EPB/TBM双模盾构复合地层掘进参数及适应性研究
10
作者 何川 黄兴 +3 位作者 陈凡 宋天田 毋晨 王士民 《铁道工程学报》 EI CSCD 北大核心 2023年第3期96-103,共8页
研究目的:为探究EPB/TBM双模盾构在复合地层中的掘进适应性,本文基于深圳地铁12号线怀德站—福永站及13号线留仙洞站—中间风井区间的EPB/TBM双模盾构施工案例,对比分析不同掘进模式下的掘进参数和能源消耗情况的变化规律,以期为类似工... 研究目的:为探究EPB/TBM双模盾构在复合地层中的掘进适应性,本文基于深圳地铁12号线怀德站—福永站及13号线留仙洞站—中间风井区间的EPB/TBM双模盾构施工案例,对比分析不同掘进模式下的掘进参数和能源消耗情况的变化规律,以期为类似工程提供参考。研究结论:(1)双模盾构在软土地层采用EPB模式保证掌子面稳定,硬岩地层采用TBM模式规避掘进速度低及刀具磨损等风险;(2)掘进参数变化规律在软土段EPB模式下表现为“低转速、高扭矩、高推力”,硬岩段TBM模式表现为“高转速、低扭矩、低推力”;(3)微风化岩层TBM模式的推进速度较EPB模式在中风化岩层提升了38%,有效掘进时长占比提升约106.7%;(4)双模盾构能源消耗较软土地层EPB模式并未明显增加;(5)本文研究可为双模盾构在复合地层中的掘进适应性提供参考。 展开更多
关键词 EPB/tbm双模盾构 统计分析 复合地层 掘进参数 盾构耗能
下载PDF
Examining the effect of adverse geological conditions on jamming of a single shielded TBM in Uluabat tunnel using numerical modeling 被引量:9
11
作者 Rohola Hasanpour Jürgen Schmitt +1 位作者 Yilmaz Ozcelik Jamal Rostami 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2017年第6期1112-1122,共11页
Severe shield jamming events have been reported during excavation of Uluabat tunnel through adverse geological conditions, which resulted in several stoppages at advancing a single shielded tunnel boring machine(TBM).... Severe shield jamming events have been reported during excavation of Uluabat tunnel through adverse geological conditions, which resulted in several stoppages at advancing a single shielded tunnel boring machine(TBM). To study the jamming mechanism, three-dimensional(3D) simulation of the machine and surrounding ground was implemented using the finite difference code FLAC3D. Numerical analyses were performed for three sections along the tunnel with a higher risk for entrapment due to the combination of overburden and geological conditions. The computational results including longitudinal displacement contours and ground pressure profiles around the shield allow a better understanding of ground behavior within the excavation. Furthermore, they allow realistically assessing the impact of adverse geological conditions on shield jamming. The calculated thrust forces, which are required to move the machine forward, are in good agreement with field observations and measurements. It also proves that the numerical analysis can effectively be used for evaluating the effect of adverse geological environment on TBM entrapments and can be applied to prediction of loads on the shield and preestimating of the required thrust force during excavation through adverse ground conditions. 展开更多
关键词 Single shielded tunnel boring machine(tbm) Numerical modeling shield jamming Squeezing ground Uluabat tunnel
下载PDF
高地应力软岩隧道TBM适应性分析及应对方法研究 被引量:2
12
作者 黄金光 李志军 +1 位作者 陈桥 郑小鹏 《水利与建筑工程学报》 2023年第1期138-145,共8页
TBM在高地应力条件下的工程软岩隧道地层中掘进存在较大的卡机风险,国内外采用定量化指标判定TBM适应性的方法缺乏;为提高TBM在高地应力软岩隧道适应性判定的准确性,更有针对性的制定卡机风险应对方案;通过引入护盾摩阻力等定量化指标,... TBM在高地应力条件下的工程软岩隧道地层中掘进存在较大的卡机风险,国内外采用定量化指标判定TBM适应性的方法缺乏;为提高TBM在高地应力软岩隧道适应性判定的准确性,更有针对性的制定卡机风险应对方案;通过引入护盾摩阻力等定量化指标,建立以护盾摩阻力与TBM极限推力间的关系为护盾受力判据,对TBM掘进适应性进行分级,以此判断TBM卡机风险大小,提前采取预处理措施来减轻卡机风险。结果表明:不同级别围岩变形对护盾产生的摩阻力大小对TBM正常掘进影响较大,通过定量计算护盾摩阻力,并与TBM推力进行对比,能够提高TBM适应性判定准确性;隧道工程软岩地段围岩地应力与岩石强度是影响TBM掘进的关键因素,围岩对护盾产生的摩阻力与地应力大小成正比,与岩石单轴抗压强度高低成反比。得到的结果为制定卡机风险应对方案提供了理论依据,可为类似工程施工提供参考。 展开更多
关键词 高地应力软岩 敞开式tbm 卡机 护盾摩阻力 适应性
下载PDF
基于围岩分类HC评分的双护盾TBM施工速度预测模型
13
作者 杨继华 闫长斌 《长江科学院院报》 CSCD 北大核心 2023年第6期126-132,共7页
针对双护盾TBM施工速度预测问题,以兰州市水源地建设工程输水隧洞双护盾TBM施工为背景,采用现场实测数据统计分析的方法,基于《水利水电工程地质勘察规范》(GB 50487—2008)的围岩分类HC评分值,研究了TBM净掘进速度、TBM利用率与围岩分... 针对双护盾TBM施工速度预测问题,以兰州市水源地建设工程输水隧洞双护盾TBM施工为背景,采用现场实测数据统计分析的方法,基于《水利水电工程地质勘察规范》(GB 50487—2008)的围岩分类HC评分值,研究了TBM净掘进速度、TBM利用率与围岩分类HC评分值的相关性,进而建立了双护盾TBM施工速度预测模型。结果表明:①TBM净掘进速度与HC值呈二次函数关系,相关性系数为0.84,随着HC值的降低,TBM净掘进速度呈现增加的趋势;②TBM利用率与围岩HC值呈二次函数关系,相关性系数为0.82,TBM利用率随着HC值的增加有先增大后减少的趋势;③围岩的HC值为41~46时,TBM的施工速度达到最高,日进尺可达到45 m以上,当HC值<41时,TBM施工速度随着HC值的降低而降低,当HC值>46时,TBM施工速度随着HC值的增加而降低;④预测施工速度与实际施工速度吻合较好,平均误差为5.2%,最大误差<10%,说明预测模型可靠,可用于双护盾TBM施工速度预测。 展开更多
关键词 双护盾tbm 围岩分类HC评分 利用率 净掘进速度 施工速度 预测模型
下载PDF
Preliminary Shielding Analysis for HCCB TBM Transport
14
作者 缪鹏 赵奉超 +2 位作者 曹启祥 张国书 冯开明 《Plasma Science and Technology》 SCIE EI CAS CSCD 2015年第9期781-786,共6页
A preliminary shielding analysis on the transport of the Chinese helium cooled ceramic breeder test blanket module(HCCB TBM) from France back to China after being irradiated in ITER is presented in this contribution... A preliminary shielding analysis on the transport of the Chinese helium cooled ceramic breeder test blanket module(HCCB TBM) from France back to China after being irradiated in ITER is presented in this contribution.Emphasis was placed on irradiation safety during transport.The dose rate calculated by MCNP/4C for the conceptual package design satisfies the relevant dose limits from IAEA that the dose rate 3 m away from the surface of the package containing low specific activity III materials should be less than 10 mSv/h.The change with location and the time evolution of dose rates after shutdown have also been studied.This will be helpful for devising the detailed transport plan of HCCB TBM back to China in the near future. 展开更多
关键词 HCCB tbm shieldING MCNP TRANSPORT
下载PDF
双护盾TBM施工关键技术 被引量:2
15
作者 宋卿 《科学技术创新》 2023年第27期117-120,共4页
兰州市水源地建设工程为国内首条应用TBM掘进、预制管片衬砌的有压输水隧洞,其中第3标段采用国产首台双护盾TBM,开挖直径5.49 m,采用平行四边形预制管片进行衬砌。在掘进施工中,该设备创造了最高日进尺61.57 m、月进尺1251.8 m的掘进纪... 兰州市水源地建设工程为国内首条应用TBM掘进、预制管片衬砌的有压输水隧洞,其中第3标段采用国产首台双护盾TBM,开挖直径5.49 m,采用平行四边形预制管片进行衬砌。在掘进施工中,该设备创造了最高日进尺61.57 m、月进尺1251.8 m的掘进纪录,仅用两年时间完成了长13.456 km隧洞掘进施工。本研究系统阐述了TBM在狭窄场地条件下的组装滑行及掘进、洞内拆卸等关键技术。 展开更多
关键词 国产首台双护盾tbm 有压输水隧洞 平行四边形管片 狭窄场地 组装期试掘进 掘进
下载PDF
复杂地质条件下超大直径隧道TBM选型及应用 被引量:2
16
作者 岑道勇 王海军 熊阳阳 《施工技术(中英文)》 CAS 2023年第5期97-102,共6页
格鲁吉亚KK公路隧道采用超大直径单护盾TBM进行开挖,地质情况复杂、埋深大、工期紧,存在突泥涌水、反坡掘进距离长、穿越断层破碎带易卡机等问题。为保障隧道安全、快速施工,有效应对工程重难点和施工风险,在考虑隧道工程地质条件、围... 格鲁吉亚KK公路隧道采用超大直径单护盾TBM进行开挖,地质情况复杂、埋深大、工期紧,存在突泥涌水、反坡掘进距离长、穿越断层破碎带易卡机等问题。为保障隧道安全、快速施工,有效应对工程重难点和施工风险,在考虑隧道工程地质条件、围岩岩性、潜在地质风险、各类型TBM特点的基础上,综合分析3种类型TBM的优缺点及权重得分,以确定较合理的TBM类型,并在此基础上,从TBM可靠性、快速掘进、涌水涌泥等方面着手,分析解决这些风险对TBM设备的要求,实施过程中成功穿越多条断层破碎带,月均进度达到400m的指标,实现快速掘进。 展开更多
关键词 公路隧道 tbm 盾构 断层破碎带 涌水涌泥
下载PDF
双护盾TBM破碎带施工地表沉降规律分析
17
作者 周光宏 王旭春 +2 位作者 张志强 孙宏图 孙宝杰 《北方交通》 2023年第8期77-81,共5页
为了探究双护盾TBM在破碎带地层掘进对地表沉降及周围环境的影响,确保TBM的安全顺利施工,降低发生地面塌陷等灾害的风险,依托青岛地铁4号线某双护盾TBM区间,采用FLAC3D软件建立了破碎带地层开挖模型,并结合现场实测地表沉降数据,分析了... 为了探究双护盾TBM在破碎带地层掘进对地表沉降及周围环境的影响,确保TBM的安全顺利施工,降低发生地面塌陷等灾害的风险,依托青岛地铁4号线某双护盾TBM区间,采用FLAC3D软件建立了破碎带地层开挖模型,并结合现场实测地表沉降数据,分析了双护盾TBM穿越断层破碎带不同稳定状态围岩段的地表变形。研究表明:断层破碎带围岩稳定区段的实测沉降数据与模拟结果基本一致,沉降槽近似呈正态高斯分布,沉降影响范围为4倍洞径;围岩失稳区段的实测沉降值与沉降速率远大于模拟值,沉降影响范围为5倍洞径;洞周失稳区段的沉降主要发生在管片拼装完成且未进行豆砾石回填注浆阶段;掌子面失稳造成的出渣量超限致使地面沉降增大,出渣量越大则地面沉降越大。 展开更多
关键词 双护盾tbm 断层破碎带 数值模拟 地表沉降 围岩失稳
下载PDF
双护盾TBM换步过程中盾尾上扬故障分析及解决方案 被引量:1
18
作者 李维浩 《自动化应用》 2023年第15期119-121,124,共4页
双护盾TBM是一种典型的敞开式硬岩掘进机,具有隧道开挖、渣土输出、管片拼装支护、管片背面豆砾石回填及注浆等功能,可一次性安全、高速地完成隧道施工,能大大缩短隧道施工工期。本文以用于山西中部引黄工程中的双护盾TBM为研究对象,该... 双护盾TBM是一种典型的敞开式硬岩掘进机,具有隧道开挖、渣土输出、管片拼装支护、管片背面豆砾石回填及注浆等功能,可一次性安全、高速地完成隧道施工,能大大缩短隧道施工工期。本文以用于山西中部引黄工程中的双护盾TBM为研究对象,该设备在工程施工过程中出现TBM换步过程中盾尾上扬,致使已拼好的管片发生错台,严重影响管片拼装质量,影响施工进度的故障,详细分析了原因,并圆满解决这一故障,期望能给类似TBM设备故障提供借鉴及启发,达到优化系统设计的目的。 展开更多
关键词 双护盾tbm 盾尾 换步 液控单向阀
下载PDF
基于协同学的双模盾构TBM-EPB施工复合系统协同性评价模型研究
19
作者 师启蒙 雷军 +2 位作者 邝利军 张树光 于广明 《北方交通》 2023年第9期73-76,80,共5页
以深圳地铁13号线双模盾构施工问题分析为基础,引入协同学理论,建立双模盾构施工子系统协同的序参量方程,应用熵权法计算各序参量的权重值,寻找影响双模盾构施工体系效率和效益提高的主导因素,构建双模盾构施工复合系统协同模型,并应用... 以深圳地铁13号线双模盾构施工问题分析为基础,引入协同学理论,建立双模盾构施工子系统协同的序参量方程,应用熵权法计算各序参量的权重值,寻找影响双模盾构施工体系效率和效益提高的主导因素,构建双模盾构施工复合系统协同模型,并应用协同度对此模型进行评价。结果表明:双模盾构施工过程中,盾构机子系统、围岩子系统与环境子系统之间未出现不协同的情况,这说明双模盾构施工技术与深圳地区的复合地层具有较强的适应性。但是由于EPB模式段地层较软弱,围岩变形与地表沉降较大,协调度相对于TBM模式段较低。应用协同学理论,建立双模盾构施工复合系统协同评价模型,可得出某一区间段盾构机、围岩与周围环境之间协同水平的综合测度,为施工过程相互作用状况的空间比较和发展趋势提供参考。 展开更多
关键词 双模盾构(tbm-EPB) 协同学理论 施工复合系统 评价模型
下载PDF
双护盾TBM在杭州输水通道中的应用与实践
20
作者 张晓良 邢渔斌 +3 位作者 闫梦阳 王国旗 方勇 王宏 《科技通报》 2023年第8期88-93,99,共7页
为解决双护盾全断面岩石掘进机(tunnel boring machine,TBM)在输水通道施工中遇到的穿越构筑物、断层破碎带以及硬岩地层中掘进等施工难题,本文以杭州某输水通道工程为例,研究双护盾TBM在硬岩地层中掘进、穿越构筑物及断层破碎带等施工... 为解决双护盾全断面岩石掘进机(tunnel boring machine,TBM)在输水通道施工中遇到的穿越构筑物、断层破碎带以及硬岩地层中掘进等施工难题,本文以杭州某输水通道工程为例,研究双护盾TBM在硬岩地层中掘进、穿越构筑物及断层破碎带等施工技术。提出了基于双护盾TBM研发、刀盘优化和掘进参数控制的双护盾TBM硬岩掘进技术。通过超前地质预报提前探测前方围岩情况、完善施工排水系统、合理控制TBM掘进参数的双护盾TBM穿越断层破碎带施工技术和通过采取注浆加固、刀盘扩挖、控制掘进参数的双护盾TBM下穿构筑物关键技术,保证了华东地区首台双护盾TBM的顺利施工。 展开更多
关键词 双护盾tbm 穿越 硬岩 断层破碎带 构筑物
下载PDF
上一页 1 2 15 下一页 到第
使用帮助 返回顶部