The effects of vacuum assistance on the microstructure and mechanical properties of high-pressure die cast AZ91 D alloy at different slow shot speeds were evaluated. Plate-shaped castings of AZ91 D alloy were carried ...The effects of vacuum assistance on the microstructure and mechanical properties of high-pressure die cast AZ91 D alloy at different slow shot speeds were evaluated. Plate-shaped castings of AZ91 D alloy were carried out on a TOYO BD-350V5 cold chamber die casting machine incorporated with a self-improved TOYO vacuum system. It was found that the vacuum pressure in the die cavity at the beginning of mold filling increases with the increase of slow shot speed, following a cubic polynomial curve, resulting in a decline in the porosity-reduction ability of vacuum assistance with the increase of slow shot speed. The externally solidified crystal(ESC) contents in conventional and vacuum die castings behave similar against the slow shot speed. The tensile properties of vacuum die castings were strongly influenced by the ESC content at relative low slow shot speeds. With the increase of slow shot speed, the influence of the gas porosity level in vacuum die castings would get prominent.展开更多
Two multi-step (two-step and three-step) slow shot speeds were used in the vacuum die casting process of AZ91D magnesium alloy. The vacuum pressure variation in the die cavity before mold filling was monitored by us...Two multi-step (two-step and three-step) slow shot speeds were used in the vacuum die casting process of AZ91D magnesium alloy. The vacuum pressure variation in the die cavity before mold filling was monitored by using a pressure sensor. The microstructures of the produced castings were analyzed with optical microscope and image analysis software. The experimental results demonstrate that, the vacuum pressure in the die cavity at the beginning of mold filling is significantly reduced by using three-step slow shot speed, resulting in a low gas porosity level in the produced castings. At an appropriate multi-step slow shot speed, the dwell time of the liquid metal in the shot sleeve before mold filling can be reduced and the flow of the liquid metal in the shot sleeve at the later stage of the slow shot process can be restrained, which cause a low externally solidified crystal content in the produced castings.展开更多
In this paper, a double-buffer traffic shaper was investigated to adjust video frame rate inflow into the TCP sender-buffer of a multimedia application source across a slow-speed link. In order to guarantee QoS across...In this paper, a double-buffer traffic shaper was investigated to adjust video frame rate inflow into the TCP sender-buffer of a multimedia application source across a slow-speed link. In order to guarantee QoS across a slow-speed link (i.e. 1 MBPS), the double-buffer traffic shaper was developed. In this paper, the buffer size dynamics of double-buffer was investigated. The arrival and departure of frames were modeled as a stochastic process. The transition matrix for the process was generated and the stationary probability computed. A simulation program was written in Matlab 7.0 to monitor the buffer fullness of the second buffer when a 3600 seconds H.263 encoder trace data was used as test data. In the second buffer, it was discovered that over 90% of the play-time, the buffer occupancy was upper bounded at 300 frames per second and utilization maintained below 30%.展开更多
基金Project(2012ZX04012011)supported by the National Science and Technology Major Project of the Ministry of Science and Technology of ChinaProject(2011BAE22B02)supported by the National Key Technologies R&D Program of ChinaProject(51275269)supported by the National Natural Science Foundation of China
文摘The effects of vacuum assistance on the microstructure and mechanical properties of high-pressure die cast AZ91 D alloy at different slow shot speeds were evaluated. Plate-shaped castings of AZ91 D alloy were carried out on a TOYO BD-350V5 cold chamber die casting machine incorporated with a self-improved TOYO vacuum system. It was found that the vacuum pressure in the die cavity at the beginning of mold filling increases with the increase of slow shot speed, following a cubic polynomial curve, resulting in a decline in the porosity-reduction ability of vacuum assistance with the increase of slow shot speed. The externally solidified crystal(ESC) contents in conventional and vacuum die castings behave similar against the slow shot speed. The tensile properties of vacuum die castings were strongly influenced by the ESC content at relative low slow shot speeds. With the increase of slow shot speed, the influence of the gas porosity level in vacuum die castings would get prominent.
基金Project(51275269)supported by the National Natural Science Foundation of ChinaProject(20121087918)supported by the Independent Research Program,China+1 种基金Project(2012ZX04012011)supported by the National Science and Technology Major Project of the Ministry of Science and Technology of ChinaProject(2013M540936)supported by Postdoctoral Science Foundation of China
文摘Two multi-step (two-step and three-step) slow shot speeds were used in the vacuum die casting process of AZ91D magnesium alloy. The vacuum pressure variation in the die cavity before mold filling was monitored by using a pressure sensor. The microstructures of the produced castings were analyzed with optical microscope and image analysis software. The experimental results demonstrate that, the vacuum pressure in the die cavity at the beginning of mold filling is significantly reduced by using three-step slow shot speed, resulting in a low gas porosity level in the produced castings. At an appropriate multi-step slow shot speed, the dwell time of the liquid metal in the shot sleeve before mold filling can be reduced and the flow of the liquid metal in the shot sleeve at the later stage of the slow shot process can be restrained, which cause a low externally solidified crystal content in the produced castings.
文摘In this paper, a double-buffer traffic shaper was investigated to adjust video frame rate inflow into the TCP sender-buffer of a multimedia application source across a slow-speed link. In order to guarantee QoS across a slow-speed link (i.e. 1 MBPS), the double-buffer traffic shaper was developed. In this paper, the buffer size dynamics of double-buffer was investigated. The arrival and departure of frames were modeled as a stochastic process. The transition matrix for the process was generated and the stationary probability computed. A simulation program was written in Matlab 7.0 to monitor the buffer fullness of the second buffer when a 3600 seconds H.263 encoder trace data was used as test data. In the second buffer, it was discovered that over 90% of the play-time, the buffer occupancy was upper bounded at 300 frames per second and utilization maintained below 30%.