期刊文献+
共找到1,823篇文章
< 1 2 92 >
每页显示 20 50 100
Optimal Operation for Baoying Pumping Station in East Route Project of South-to-North Water Transfer 被引量:7
1
作者 FENG Xiaoli QIU Baoyun +2 位作者 CAO Haihong WEI Qianglin TENG Haibo 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2009年第1期78-83,共6页
Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjus... Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day. The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%-31.27%. Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%-5.79% by the schemes of adjusting blade angles when pumping certain discharge. 展开更多
关键词 south-to-north water transfer Baoying pumping station optimal operation adjusting blade angle time-varying electrical price
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
2
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water transfer Project
下载PDF
Research on Expansive Soils Encountered in Middle Route Project of South-to-north Water Transfer Canal 被引量:2
3
作者 GONG Bi-weiSenior Engineer, Yangtze River Scientific Research Institute, Changjiang Water Resources Commission, Wuhan, 430010, China ZHOU Xiao-wenSenior Engineer, Yangtze River Scientific Research Institute, Changjiang Water Resources Commission, Wuhan, 430010, China BAO Chen-gangProfessor-Senior Engineer, Yangtze River Scientific Research Institute, Changjiang Water Resources Commission, Wuhan, 430010, China 《人民长江》 北大核心 2002年第S1期36-39,共4页
The main canal of the Middle Route Project of South-to-North Water Transfer totals more than 1 240 km in length. In Henan Province and Hebei Province, there will be a section of more than 120 km passing through an exp... The main canal of the Middle Route Project of South-to-North Water Transfer totals more than 1 240 km in length. In Henan Province and Hebei Province, there will be a section of more than 120 km passing through an expansive soils area. Expansive soils is a special kind of tenacious clay, which swells when meeting with water and shrinks when losing water. With complicated mechanical properties, it changes with the variation of water content. As a result, expansive soils become the key object of study on unsaturated soils mechanics for the project. From the status of study on unsaturated soils at home and abroad, this paper covers an analysis on stability analysis method of expansive soils slope, determination of expansive soils strength, rational design of canal slope ratio and support, and forecast of landslide for the Middle Route Project of South-to-North Water Transfer. 展开更多
关键词 Unsaturated SOILS expansive SOILS Suction the south-to-north water transfer CANAL
下载PDF
Evolution trend of the water quality in Dongping Lake after South-North Water Transfer Project in China 被引量:2
4
作者 HU Zun-fang KANG Feng-xin +4 位作者 ZOU An-de YU Lin-song LI Yang TIAN Tong-liang KANG Gui-ling 《Journal of Groundwater Science and Engineering》 2019年第4期333-339,共7页
To investigate the evolution trend of water quality in Dongping Lake after South-North Water Transfer Project operation as well as to ensure the safe usage of the water receiving areas, water samples were collected an... To investigate the evolution trend of water quality in Dongping Lake after South-North Water Transfer Project operation as well as to ensure the safe usage of the water receiving areas, water samples were collected and determined before and after water delivery in different hydrological seasons. Then, comprehensive pollution index method, comprehensive nutrition state index method and health risk assessment model were utilized to evaluate the quality, nutrition, and health risk of Dongping Lake water. Results showed that the quality of Dongping Lake water still met level Ⅲ (light pollution) no matter before or after water delivery. The nutrition state was improved from light eutropher before water delivery to mesotropher after water delivery. The health risk level was reduced from high-medium before water delivery to medium level after water delivery. In summary, the operation of the eastern route of South-North Water Transfer Project is beneficial for water environment improvement of Dongping Lake. 展开更多
关键词 south-north water transfer Project Dongping LAKe water quality NUTRITION Health risk
下载PDF
Forecasting Loss of Ecosystem Service Value Using a BP Network: A Case Study of the Impact of the South-to-north Water Transfer Project on the Ecological Environmental in Xiangfan, Hubei Province, China 被引量:1
5
作者 YUN-FENG CHEN, JING-XUAN ZHOU, JIE XIAO, AND YAN-PING LIEnvironmental Science and Engineering College, Huazhong University of Science and Technology, Wuhan 430074, Hubei, China 《Biomedical and Environmental Sciences》 SCIE CAS CSCD 2003年第4期379-391,共13页
Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific... Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific countermeasures. Methods A three-layer BP network was built to simulate topology and process of the eco-economy system of Xiangfan. Historical data of ecological environmental factors and socio-economic factors as inputs, and corresponding historical data of ecosystem service value (ESV) and GDP as target outputs, were presented to train and test the network. When predicted input data after 2001 were presented to trained network as generalization sets, ESVs and GDPs of 2002, 2003, 2004... till 2050 were simulated as output in succession. Results Up to 2050, the area would have suffered an accumulative total ESV loss of RMB 104.9 billion, which accounted for 37.36% of the present ESV. The coinstantaneous GDP would change asynchronously with ESV, it would go through an up-to-down process and finally lose RMB89.3 billion, which accounted for 18.71% of 2001. Conclusions The simulation indicates that ESV loss means damage to the capability of socio-economic sustainable development, and suggests that artificial neural networks (ANNs) provide a feasible and effective method and have an important potential in ESV modeling. 展开更多
关键词 Artificial neural network BP ecosystem service value south-to-north water transfer Project
下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
6
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 the Western Route of south-to-north water transfer Project rock mechanics issues classification of surrounding rocks stability of surrounding rocks excavation-induced damage lining design
下载PDF
Eco-environmental benefit assessment of China's South-North Water Transfer Scheme——the middle route project
7
作者 DUANGuang-ming ZHAOJing-zhu LIUGuo-hua KEBing XIAOHan WUGang DENGHong-bing 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第2期308-315,共8页
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ... This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors. 展开更多
关键词 China's south-north water transfer Scheme(SNWT) the middle route project of south-north water transfer(MRPSNWT) assessment ecosystem services monetary indices
下载PDF
Asynchronism-synchronism of regional precipitation in South-to-North Water Transfer planned areas
8
作者 ZHENG Hong-xing, LIU Chang-ming (Institute of Geographic Sciences and Natural Resources Research, CAS, Beijing 100101, China) 《Journal of Geographical Sciences》 SCIE CSCD 2001年第2期161-169,共9页
This paper proposes a method on analyzing the asynchronism-synchronism of precipitation of different hydrological regions regarding the S-to-N water transfer areas of eastern China. The general process of the analysis... This paper proposes a method on analyzing the asynchronism-synchronism of precipitation of different hydrological regions regarding the S-to-N water transfer areas of eastern China. The general process of the analysis includes three steps. Firstly, we created the rainfall series of the region concerned by calculating the regional average rainfall of the stations in the area with the help of the classical Thiessen Polygon method. Secondly, the standards of assessment indices for wetness or dryness are set according to Gamma distribution function with a certain probability P 37.5% or 62.5% given respectively. Finally, the frequency of nine combinations are counted as the quantitative feature of asynchronism and synchronism in three time scales, that is the yearly, seasonal and monthly scales. The asynchronism-synchronism of two region pairs has been estimated. The results show that the frequency of precipitation asynchronism in 1957–1998 is larger than the synchronism frequency for both the North China-middle and lower Yangtze River pair and for the North China-upper Hanjiang River pair. As for the synchronism phenomena, the frequency of Nd?Sd is rather low. As the combinations that are suitable for water transfers are Nd?Sw, Nn?Sw, Nd?Sn and Nn?Sn, the total frequency of these combinations for North China-middle and lower Yangtze River is 40% on an annual basis, but only 28% in spring when water shortages are most likely to occur. The total frequency of these combinations for North China-upper Hanjiang River is about 24% on an annual basis, but 35% in spring and winter. It should be noted that if future precipitation patterns are similar to that of the period 1957–1998, it is very important to change the natural character of asynchronism-synchronism by enhancing the capability of hydro-projects regulation and improving management of the water transfer project. 展开更多
关键词 synchronous frequency asynchronous frequency south-to-north water transfer
下载PDF
Price Analysis of Water Supply for South-to-North Water Transfer Project
9
作者 QIU Zhong enProfessor, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China Tan Chang liSenior Engineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China ZHU Qin Engineer, Design Institute, Chan 《人民长江》 北大核心 2001年第S1期29-32,共4页
The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from ... The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions. 展开更多
关键词 PRICe of water supply water PRICe estimation FUND RAISING schemes water transfer cost Middle-Route Project of south-to-north water transfer
下载PDF
LONG AND DEEP DIVERSION TUNNELS OF 1^(ST) STAGE PROJECT IN WEST ROUTE OF SOUTH-NORTH WATER TRANSFER PROJECT
10
作者 Shen Fengsheng,Liu Xin (Reconnaissance,Planning,Design and Research Institute,Yellow River Construction Commission, Ministry of Water Resources, Zhengzhou 450003 China) 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第9期1527-1532,共6页
West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze... West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze River to the upper reaches of the Yellow River. It is to be constructed in 3 stages, of which the 1st stage project includes delivering 4 billion m3 of water by gravity from two tributaries of Yalong River and three tributaries of Dadu River. The project consists of 5 dams,7 tunnels and a channel in series,with the dam height of 63~123 m and water transfer length of 260.3 km,of which the tunnels measure 244.1 km. The special climatic,environmental and geologic conditions make the project much more complicated in construction,especially 3 tunnels with the length longer than 50 km each create challenges to the technical requirements of engineering survey,design and construction. 展开更多
关键词 南水北调工程 西线工程 引水隧洞 TBM
下载PDF
南水北调中线工程水源地南阳推进EOD模式的路径研究
11
作者 牛亚丽 吴梦 李玉英 《环境保护与循环经济》 2024年第10期39-43,共5页
近年来,生态环境导向的开发(EOD)模式受到广泛关注。南阳作为南水北调中线工程核心水源地,也是渠首所在地,推进EOD模式有助于其将“绿水青山”转变为“金山银山”,能够为生态环境治理与产业协同发展提供有力支撑,同时促进共同富裕。农... 近年来,生态环境导向的开发(EOD)模式受到广泛关注。南阳作为南水北调中线工程核心水源地,也是渠首所在地,推进EOD模式有助于其将“绿水青山”转变为“金山银山”,能够为生态环境治理与产业协同发展提供有力支撑,同时促进共同富裕。农产品资源丰富但竞争力不强、生态产品价值实现周期长、保水质任务艰巨制约着其推进EOD模式。基于此,建议采用“授权—建设—运营”(ABO)模式进行运营,从打造特色名片、构建农产品平台服务体系以及加强合作等方面着手推进。 展开更多
关键词 生态环境导向 开发模式 南水北调中线工程水源地
下载PDF
The variation of DOM during long distance water transport by the China South to North Water Diversion Scheme and impact on drinking water treatment 被引量:1
12
作者 Hankun Yang Yujuan Li +6 位作者 Hongyu Liu Nigel J.D.Graham Xue Wu Jiawei Hou Mengjie Liu Wenyu Wang Wenzheng Yu 《Frontiers of Environmental Science & Engineering》 SCIE EI CSCD 2024年第5期85-100,共16页
In this study,samples were taken from three locations,upstream to downstream,along the central route project of the China South to North Water Diversion(SNWD)scheme in summer and winter.These were used to reveal the v... In this study,samples were taken from three locations,upstream to downstream,along the central route project of the China South to North Water Diversion(SNWD)scheme in summer and winter.These were used to reveal the variations of dissolved organic matter(DOM)during the water transfer process,and the effects of these variations on drinking water treatment and disinfection by-products formation potential(DBPs-FP).The results showed that polysaccharides accumulate in summer and reduce in winter with flow distance,which has an important effect on the overall properties of DOM,as well as on the performance of coagulation,ultrafiltration,and the formation of DBPs.Humic substances,and their hydrophilic content,also increased in summer and decreased in winter with flow distance.In contrast,the concentration of small organic substances(MW≤1000 Da)increased in both summer and winter with flow distance,which affected both nanofiltration(NF)membrane fouling and DBPs-FP.The results provide a useful case study of spatial and temporal changes in raw water DOM during long distance water transfer and their impact on the treatment and quality of drinking water from the SNWD. 展开更多
关键词 Long-distance water transfer The China south to north water Diversion Scheme COAGULATION Membrane filtration Disinfection by-products
原文传递
WATER QUALITY MODELING AND POLLUTION CONTROL FOR THE EASTERN ROUTE OF SOUTH TO NORTH WATER TRANSFER PROJECT IN CHINA 被引量:17
13
作者 WANG Chao WANG Yan-ying WANG Pei-fang 《Journal of Hydrodynamics》 SCIE EI CSCD 2006年第3期253-261,共9页
South to North Water Transfer Project in China is the largest project over centuries to solve the water shortage problem in vast areas of northern China. It comprises of three routes: the eastern, central and western... South to North Water Transfer Project in China is the largest project over centuries to solve the water shortage problem in vast areas of northern China. It comprises of three routes: the eastern, central and western route and this study mainly focused on the eastern route. As water quality is the key factor for the eastern route, this paper examined the main factors influencing water quality of the main route south of the Yellow River, by investigating the point source, non-point source (diffusive source) and internal source pollutions along the main eastern route and in its drainage basins, and assessing the Current water quality in the waterways. According to the complicated and combined systems of rivers and lakes in this route, one-dimensional water quantity and quality model for rivers and two-dimensional model for lakes were developed to simulate the hydrodynamic and pollutant transport processes. The numerical method and model algorithm were described. The values of model parameters were estimated by using field-monitoring data along the main route and the inverse modeling technique. Established models were employed to predict the degradations of CODMn and NH4^+-N in the main stream, under the conditions of current pollution loads and different hydrologic conditions. Schemes were present for controlling total quantities of pollutants from point source and non-point source along the main route to secure water quality for the eastern route. 展开更多
关键词 south to north water transfer eastern RouteProject water quality pollution loads pollution control
原文传递
MODELING OF WATER DYNAMICS AND POLLUTANT SPREADING IN THE LUOMAHU RESERVOIR FOR WATER TRANSFER FORM SOUTH TO NORTH OF CHINA 被引量:3
14
作者 Wang Chao College of Water Resources and Environment, Hohai University, Nanjing 210098, China 《Journal of Hydrodynamics》 SCIE EI CSCD 2001年第4期14-23,共10页
Water quality is the key problem of the East-Line Project of Water Transfer from South to North China. In this paper, the principles of a 1D and 2D-integrated mathematical model for describing the dynamics of water in... Water quality is the key problem of the East-Line Project of Water Transfer from South to North China. In this paper, the principles of a 1D and 2D-integrated mathematical model for describing the dynamics of water in a flow-through river, canals and lakes was worked out. The numerical method and model algorithm were developed. The efficiency of the model was estimated by applying it to studying water dynamics in the Luomahu reservoir and simulating the spreading process of a polluted water mass and the evolution of the concentration. The results of calculations are used to assess water environmental quality and to manage water resource in the Luomahu reservoir and the Jinghang-Canal for the Project of Water Transfer from South to North China. 展开更多
关键词 mathematical model integral stream function water quality water transfer from south to north Project
原文传递
Simulation of Transport Channel in China's Middle Route South-to-North Water Transfer Project 被引量:3
15
作者 方神光 魏加华 +1 位作者 吴保生 尚毅梓 《Tsinghua Science and Technology》 SCIE EI CAS 2009年第3期367-377,共11页
The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate t... The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate the effect of many transfer structures on the water levels in the main channel. Various gate operating and control methods were analyzed to study the response to disturbances produced by varying the flow rates through the Tianjin outlet. The results show that when the inflow at the head changes in the same way as the sum of the flow rates through all the outlets, the transition time and the fluctuation of the water levels using the timed gate operation method are less than when using the simultaneous gate operation method, but the variations of the gate openings and flow rates through each control gate are much larger. The flow disturbances produced by the Tianjin outlet can be rectified within several channel sections and the transition time can be greatly shortened by allowing the water levels immediately upstream of the control gates to vary within proscribed ranges, rather than being held constant. 展开更多
关键词 Middle Route south-to-north water transfer Project unsteady flow open channel control system SIMULATION
原文传递
2-D NUMERICAL SIMULATION OF FLOODING EFFECTS CAUSED BY SOUTH-TO-NORTH WATER TRANSFER PROJECT 被引量:1
16
作者 SUN Dong-po XUE Hai +2 位作者 WANG Peng-tao LU Rui-li LIAO Xiao- long 《Journal of Hydrodynamics》 SCIE EI CSCD 2008年第5期662-667,共6页
Since the General Channel designed for the South-to-North Water Transfer Project in China has to cross many rivers and streams flowing from west to east, there are potentially serious effects additional flooding on th... Since the General Channel designed for the South-to-North Water Transfer Project in China has to cross many rivers and streams flowing from west to east, there are potentially serious effects additional flooding on the western side of the project alignment. Therefore, a 2-D numerical model for forecasting basin flood disasters was established and verified using historical flood data. The model was applied to researching the interaction between the proposed Project and flooding events for 5 streams in the Anyang River reach as a representative case study. Simulated results indicate that the model could correctly forecast the flood, submerged area and depths, and water surface elevations along the left side of the channel. The discharge capacity and location of hydraulic structures in the transfer canal alignment were analyzed. Then adjustments to the dimensions and positioning of proposed hydraulic structures were recommended at intersections, especially the addition of a channel to transfer flood water from one stream to another, which can effectively limit the sluice and protect the Anyang City from flooding. 展开更多
关键词 south-to-north water transfer Project 2-D numerical simulation interpenetrating flood field diffiuent canal
原文传递
MIKE21水动力学模型在洪泽湖水位模拟中的应用 被引量:30
17
作者 梁云 殷峻暹 +1 位作者 祝雪萍 黄晓敏 《水电能源科学》 北大核心 2013年第1期135-137,99,共4页
洪泽湖作为淮河流域最大的平原水库和南水北调东线工程的重要调蓄水库,确保其优良的水质和稳定的水位至关重要。根据洪泽湖的地形和水文条件,利用MIKE21水动力学模型,模拟了洪泽湖的水位变化过程。结果表明,MIKE21模型能较好地模拟洪泽... 洪泽湖作为淮河流域最大的平原水库和南水北调东线工程的重要调蓄水库,确保其优良的水质和稳定的水位至关重要。根据洪泽湖的地形和水文条件,利用MIKE21水动力学模型,模拟了洪泽湖的水位变化过程。结果表明,MIKE21模型能较好地模拟洪泽湖水位过程,模拟误差均在可接受范围内,且模拟精度可满足计算要求。 展开更多
关键词 MIKe21水动力学模型 南水北调东线工程 模拟水位 洪泽湖
下载PDF
Tennant法计算标准的修正及其应用 被引量:49
18
作者 门宝辉 刘昌明 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2008年第3期479-482,共4页
为了使Tennant法更适合计算南水北调西线河道内生态需水量,对其计算标准进行了修正.采用实地调查的方法,发现南水北调西线一期工程调水区气温较低,引水河流中鱼类洄游及水生生物的活动期主要集中在7-8月份,而且每年的12月到翌年3月河道... 为了使Tennant法更适合计算南水北调西线河道内生态需水量,对其计算标准进行了修正.采用实地调查的方法,发现南水北调西线一期工程调水区气温较低,引水河流中鱼类洄游及水生生物的活动期主要集中在7-8月份,而且每年的12月到翌年3月河道均处于冰冻期,所以将Tennant法的用水期修正为7-8月,并将修正后的Tennant法应用于南水北调西线调水区引水枢纽下游的朱倭、朱巴、绰斯甲和足木足4站河道内生态需水量的计算.结果表明修正后的Tennant法计算的生态需水量约占多年平均的25%,可见Ten-nant法对栖息地描述的是否准确直接影响到计算结果. 展开更多
关键词 南水北调西线一期工程 生态需水量 可调水量 TeNNANT法
下载PDF
基于ArcEngine网络模型的水资源优化配置系统开发 被引量:3
19
作者 董贵明 束龙仓 +1 位作者 陈南祥 田娟 《计算机工程与应用》 CSCD 北大核心 2007年第35期198-201,共4页
把ESRI公司的ArcEngine(ArcGIS Engine)组件库中的网络模型应用到水资源优化配置系统开发过程中。重点介绍了ArcEngine网络模型的体系结构、关键技术、开发步骤。以ArcEngine网络模型在南水北调中线河南受水区水资源优化配置系统开发中... 把ESRI公司的ArcEngine(ArcGIS Engine)组件库中的网络模型应用到水资源优化配置系统开发过程中。重点介绍了ArcEngine网络模型的体系结构、关键技术、开发步骤。以ArcEngine网络模型在南水北调中线河南受水区水资源优化配置系统开发中的应用为例,对具体功能的实现做出了分析。开发实例表明,ArcEngine网络模型在水资源优化配置系统开发中充分发挥了GIS的空间分析功能,实现了系统中GIS模型和专业模型的耦合。 展开更多
关键词 ARCGIS engine GIS 网络模型 水资源优化配置 系统开发 南水北调
下载PDF
基于二维Gumbel分布的长距离输水系统水文风险评估 被引量:5
20
作者 冯平 王仲珏 田为民 《灾害学》 CSCD 2008年第1期23-26,共4页
在现行的水文风险组合计算中,往往需要对非正态分布的水文变量进行正态化处理,这必然引起畸变,从而影响分析计算结果的准确性。针对这一问题,在以往的研究基础上,根据Ditlevsen界限,进一步建立了基于二维Gumbel分布的长距离输水系统的... 在现行的水文风险组合计算中,往往需要对非正态分布的水文变量进行正态化处理,这必然引起畸变,从而影响分析计算结果的准确性。针对这一问题,在以往的研究基础上,根据Ditlevsen界限,进一步建立了基于二维Gumbel分布的长距离输水系统的综合水文风险评估模型,从而巧妙地解决了串联系统风险计算中如何建立n维联合概率分布函数的难题。并以南水北调中线工程河北省段的21条主要河流为例,分析了采用Gumbel联合分布来研究降雨量或洪水的联合分布特征的可行性,进行了实际水文概率的组合计算,结果表明南水北调中线工程河北省北段的综合防洪风险是3.1%,其防洪安全是有保证的。 展开更多
关键词 Gumbel分布 联合概率分布 串联系统 风险 南水北调中线工程
下载PDF
上一页 1 2 92 下一页 到第
使用帮助 返回顶部