期刊文献+
共找到1,834篇文章
< 1 2 92 >
每页显示 20 50 100
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
1
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water transfer Project
下载PDF
Optimal Operation for Baoying Pumping Station in East Route Project of South-to-North Water Transfer 被引量:7
2
作者 FENG Xiaoli QIU Baoyun +2 位作者 CAO Haihong WEI Qianglin TENG Haibo 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2009年第1期78-83,共6页
Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjus... Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day. The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%-31.27%. Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%-5.79% by the schemes of adjusting blade angles when pumping certain discharge. 展开更多
关键词 south-to-north water transfer Baoying pumping station optimal operation adjusting blade angle time-varying electrical price
下载PDF
Research on Expansive Soils Encountered in Middle Route Project of South-to-north Water Transfer Canal 被引量:2
3
作者 GONG Bi-weiSenior Engineer, Yangtze River Scientific Research Institute, Changjiang Water Resources Commission, Wuhan, 430010, China ZHOU Xiao-wenSenior Engineer, Yangtze River Scientific Research Institute, Changjiang Water Resources Commission, Wuhan, 430010, China BAO Chen-gangProfessor-Senior Engineer, Yangtze River Scientific Research Institute, Changjiang Water Resources Commission, Wuhan, 430010, China 《人民长江》 北大核心 2002年第S1期36-39,共4页
The main canal of the Middle Route Project of South-to-North Water Transfer totals more than 1 240 km in length. In Henan Province and Hebei Province, there will be a section of more than 120 km passing through an exp... The main canal of the Middle Route Project of South-to-North Water Transfer totals more than 1 240 km in length. In Henan Province and Hebei Province, there will be a section of more than 120 km passing through an expansive soils area. Expansive soils is a special kind of tenacious clay, which swells when meeting with water and shrinks when losing water. With complicated mechanical properties, it changes with the variation of water content. As a result, expansive soils become the key object of study on unsaturated soils mechanics for the project. From the status of study on unsaturated soils at home and abroad, this paper covers an analysis on stability analysis method of expansive soils slope, determination of expansive soils strength, rational design of canal slope ratio and support, and forecast of landslide for the Middle Route Project of South-to-North Water Transfer. 展开更多
关键词 Unsaturated SOILS Expansive SOILS Suction the south-to-north water transfer CANAL
下载PDF
Forecasting Loss of Ecosystem Service Value Using a BP Network: A Case Study of the Impact of the South-to-north Water Transfer Project on the Ecological Environmental in Xiangfan, Hubei Province, China 被引量:1
4
作者 YUN-FENG CHEN, JING-XUAN ZHOU, JIE XIAO, AND YAN-PING LIEnvironmental Science and Engineering College, Huazhong University of Science and Technology, Wuhan 430074, Hubei, China 《Biomedical and Environmental Sciences》 SCIE CAS CSCD 2003年第4期379-391,共13页
Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific... Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific countermeasures. Methods A three-layer BP network was built to simulate topology and process of the eco-economy system of Xiangfan. Historical data of ecological environmental factors and socio-economic factors as inputs, and corresponding historical data of ecosystem service value (ESV) and GDP as target outputs, were presented to train and test the network. When predicted input data after 2001 were presented to trained network as generalization sets, ESVs and GDPs of 2002, 2003, 2004... till 2050 were simulated as output in succession. Results Up to 2050, the area would have suffered an accumulative total ESV loss of RMB 104.9 billion, which accounted for 37.36% of the present ESV. The coinstantaneous GDP would change asynchronously with ESV, it would go through an up-to-down process and finally lose RMB89.3 billion, which accounted for 18.71% of 2001. Conclusions The simulation indicates that ESV loss means damage to the capability of socio-economic sustainable development, and suggests that artificial neural networks (ANNs) provide a feasible and effective method and have an important potential in ESV modeling. 展开更多
关键词 Artificial neural network BP Ecosystem service value south-to-north water transfer Project
下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
5
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 the Western Route of south-to-north water transfer Project rock mechanics issues classification of surrounding rocks stability of surrounding rocks excavation-induced damage lining design
下载PDF
Price Analysis of Water Supply for South-to-North Water Transfer Project
6
作者 QIU Zhong enProfessor, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China Tan Chang liSenior Engineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China ZHU Qin Engineer, Design Institute, Chan 《人民长江》 北大核心 2001年第S1期29-32,共4页
The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from ... The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions. 展开更多
关键词 PRICE of water supply water PRICE estimation FUND RAISING schemes water transfer cost Middle-Route Project of south-to-north water transfer
下载PDF
Asynchronism-synchronism of regional precipitation in South-to-North Water Transfer planned areas
7
作者 ZHENG Hong-xing, LIU Chang-ming (Institute of Geographic Sciences and Natural Resources Research, CAS, Beijing 100101, China) 《Journal of Geographical Sciences》 SCIE CSCD 2001年第2期161-169,共9页
This paper proposes a method on analyzing the asynchronism-synchronism of precipitation of different hydrological regions regarding the S-to-N water transfer areas of eastern China. The general process of the analysis... This paper proposes a method on analyzing the asynchronism-synchronism of precipitation of different hydrological regions regarding the S-to-N water transfer areas of eastern China. The general process of the analysis includes three steps. Firstly, we created the rainfall series of the region concerned by calculating the regional average rainfall of the stations in the area with the help of the classical Thiessen Polygon method. Secondly, the standards of assessment indices for wetness or dryness are set according to Gamma distribution function with a certain probability P 37.5% or 62.5% given respectively. Finally, the frequency of nine combinations are counted as the quantitative feature of asynchronism and synchronism in three time scales, that is the yearly, seasonal and monthly scales. The asynchronism-synchronism of two region pairs has been estimated. The results show that the frequency of precipitation asynchronism in 1957–1998 is larger than the synchronism frequency for both the North China-middle and lower Yangtze River pair and for the North China-upper Hanjiang River pair. As for the synchronism phenomena, the frequency of Nd?Sd is rather low. As the combinations that are suitable for water transfers are Nd?Sw, Nn?Sw, Nd?Sn and Nn?Sn, the total frequency of these combinations for North China-middle and lower Yangtze River is 40% on an annual basis, but only 28% in spring when water shortages are most likely to occur. The total frequency of these combinations for North China-upper Hanjiang River is about 24% on an annual basis, but 35% in spring and winter. It should be noted that if future precipitation patterns are similar to that of the period 1957–1998, it is very important to change the natural character of asynchronism-synchronism by enhancing the capability of hydro-projects regulation and improving management of the water transfer project. 展开更多
关键词 synchronous frequency asynchronous frequency south-to-north water transfer
下载PDF
Evolution trend of the water quality in Dongping Lake after South-North Water Transfer Project in China 被引量:2
8
作者 HU Zun-fang KANG Feng-xin +4 位作者 ZOU An-de YU Lin-song LI Yang TIAN Tong-liang KANG Gui-ling 《Journal of Groundwater Science and Engineering》 2019年第4期333-339,共7页
To investigate the evolution trend of water quality in Dongping Lake after South-North Water Transfer Project operation as well as to ensure the safe usage of the water receiving areas, water samples were collected an... To investigate the evolution trend of water quality in Dongping Lake after South-North Water Transfer Project operation as well as to ensure the safe usage of the water receiving areas, water samples were collected and determined before and after water delivery in different hydrological seasons. Then, comprehensive pollution index method, comprehensive nutrition state index method and health risk assessment model were utilized to evaluate the quality, nutrition, and health risk of Dongping Lake water. Results showed that the quality of Dongping Lake water still met level Ⅲ (light pollution) no matter before or after water delivery. The nutrition state was improved from light eutropher before water delivery to mesotropher after water delivery. The health risk level was reduced from high-medium before water delivery to medium level after water delivery. In summary, the operation of the eastern route of South-North Water Transfer Project is beneficial for water environment improvement of Dongping Lake. 展开更多
关键词 south-North water transfer Project Dongping LAKE water quality NUTRITION Health risk
下载PDF
Eco-environmental benefit assessment of China's South-North Water Transfer Scheme——the middle route project
9
作者 DUANGuang-ming ZHAOJing-zhu LIUGuo-hua KEBing XIAOHan WUGang DENGHong-bing 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第2期308-315,共8页
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ... This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors. 展开更多
关键词 China's south-North water transfer Scheme(SNWT) the middle route project of south-North water transfer(MRPSNWT) assessment ecosystem services monetary indices
下载PDF
LONG AND DEEP DIVERSION TUNNELS OF 1^(ST) STAGE PROJECT IN WEST ROUTE OF SOUTH-NORTH WATER TRANSFER PROJECT
10
作者 Shen Fengsheng,Liu Xin (Reconnaissance,Planning,Design and Research Institute,Yellow River Construction Commission, Ministry of Water Resources, Zhengzhou 450003 China) 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第9期1527-1532,共6页
West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze... West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze River to the upper reaches of the Yellow River. It is to be constructed in 3 stages, of which the 1st stage project includes delivering 4 billion m3 of water by gravity from two tributaries of Yalong River and three tributaries of Dadu River. The project consists of 5 dams,7 tunnels and a channel in series,with the dam height of 63~123 m and water transfer length of 260.3 km,of which the tunnels measure 244.1 km. The special climatic,environmental and geologic conditions make the project much more complicated in construction,especially 3 tunnels with the length longer than 50 km each create challenges to the technical requirements of engineering survey,design and construction. 展开更多
关键词 南水北调工程 西线工程 引水隧洞 TBM
下载PDF
Simulation of Transport Channel in China's Middle Route South-to-North Water Transfer Project 被引量:3
11
作者 方神光 魏加华 +1 位作者 吴保生 尚毅梓 《Tsinghua Science and Technology》 SCIE EI CAS 2009年第3期367-377,共11页
The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate t... The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate the effect of many transfer structures on the water levels in the main channel. Various gate operating and control methods were analyzed to study the response to disturbances produced by varying the flow rates through the Tianjin outlet. The results show that when the inflow at the head changes in the same way as the sum of the flow rates through all the outlets, the transition time and the fluctuation of the water levels using the timed gate operation method are less than when using the simultaneous gate operation method, but the variations of the gate openings and flow rates through each control gate are much larger. The flow disturbances produced by the Tianjin outlet can be rectified within several channel sections and the transition time can be greatly shortened by allowing the water levels immediately upstream of the control gates to vary within proscribed ranges, rather than being held constant. 展开更多
关键词 Middle Route south-to-north water transfer Project unsteady flow open channel control system SIMULATION
原文传递
2-D NUMERICAL SIMULATION OF FLOODING EFFECTS CAUSED BY SOUTH-TO-NORTH WATER TRANSFER PROJECT 被引量:1
12
作者 SUN Dong-po XUE Hai +2 位作者 WANG Peng-tao LU Rui-li LIAO Xiao- long 《Journal of Hydrodynamics》 SCIE EI CSCD 2008年第5期662-667,共6页
Since the General Channel designed for the South-to-North Water Transfer Project in China has to cross many rivers and streams flowing from west to east, there are potentially serious effects additional flooding on th... Since the General Channel designed for the South-to-North Water Transfer Project in China has to cross many rivers and streams flowing from west to east, there are potentially serious effects additional flooding on the western side of the project alignment. Therefore, a 2-D numerical model for forecasting basin flood disasters was established and verified using historical flood data. The model was applied to researching the interaction between the proposed Project and flooding events for 5 streams in the Anyang River reach as a representative case study. Simulated results indicate that the model could correctly forecast the flood, submerged area and depths, and water surface elevations along the left side of the channel. The discharge capacity and location of hydraulic structures in the transfer canal alignment were analyzed. Then adjustments to the dimensions and positioning of proposed hydraulic structures were recommended at intersections, especially the addition of a channel to transfer flood water from one stream to another, which can effectively limit the sluice and protect the Anyang City from flooding. 展开更多
关键词 south-to-north water transfer Project 2-D numerical simulation interpenetrating flood field diffiuent canal
原文传递
南水北调西线工程水源区可调水量“十问” 被引量:3
13
作者 胡鹏 王浩 +13 位作者 赵勇 宁远 蒋云钟 刘欢 曾庆慧 杨泽凡 周毓彦 董宁澎 闫龙 阿膺兰 张丰博 唐家璇 王玉莲 王建华 《中国工程科学》 CSCD 北大核心 2024年第2期210-223,共14页
南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区... 南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区及其下游水资源开发利用、水生态环境、水力发电、航运等方面影响的角度,提出了与水源区可调水量相关的10个问题;以长江上游分布式水文模型为基础,建立了南水北调西线工程水源区可调水量模拟分析模型,力图系统、定量地回答所提问题。本文的主要研究结论有:在仅考虑满足水源区河道内外生态环境和经济社会需水的前提下,“上线+下线”组合方案多年平均可调水量为1.59×10^(10)m^(3),“完全下线”方案在建设岗托水库进行联调时,多年平均可调水量将达到1.74×10^(10)m^(3);在综合考虑调水对水源区水平衡、水力发电和航运影响及其可接受程度后,南水北调西线水源区可调水量为1.22×10^(10)~1.26×10^(10)m^(3)。长远来看,应谋划西南片区水网与国家水网主骨架、“大动脉”的连接与融合,在减小南水北调西线工程调水影响的同时,提高南水北调西线工程的整体供水能力以及对气候变化等外部条件的适应性。 展开更多
关键词 南水北调西线工程 水源区 可调水量 生态需水 跨流域调水
下载PDF
南水北调中线冬季冰情变化特征及输水能力提升策略研究 被引量:1
14
作者 郭新蕾 潘佳佳 +3 位作者 苑希民 王军 罗秋实 苏霞 《水利学报》 EI CSCD 北大核心 2024年第4期389-402,共14页
南水北调中线工程冰期输水能力受限已成为制约工程安全运行和社会效益发挥的巨大障碍。认识和辨析通水以来中线干渠冬季水温冰情演变规律及影响机理,是中线干渠冬季输水能力提升亟需解决的关键问题。本文基于2011—2023年中线干渠连续1... 南水北调中线工程冰期输水能力受限已成为制约工程安全运行和社会效益发挥的巨大障碍。认识和辨析通水以来中线干渠冬季水温冰情演变规律及影响机理,是中线干渠冬季输水能力提升亟需解决的关键问题。本文基于2011—2023年中线干渠连续12个冬季的气象、水力、冰情等原型观测资料,分析了中线干渠水温冰情时空分布本底和特征规律,明晰了影响中线干渠冰凌生消的关键因素,针对性提出了冬季输水能力提升的相关应对策略。分析表明:通水以来冰情发生的范围和时间相比理论预想偏小、偏短,冰凌影响区为七里河倒虹吸至北拒马河暗渠段,冰塞风险区为滹沱河倒虹吸至北拒马河暗渠段,多年平均冰厚15 cm,历史极端冰塞厚2.9 m,冰凌壅水最高值0.73 m;干渠冬季水温由南向北递减,依次出现岸冰、流冰和冰盖,日均气温转负后相应的断面平均测量水温在2.5、1.0和0.25℃左右,且沿程水温下降速率与流量和气温呈负相关,即增大输水流量可减缓水温下降速度;影响冰凌生消的关键因素是气温、流量、太阳辐射和风速,典型年如2016年的严重冰情与1月低累计负积温、大输水流量和短时寒潮叠加有关,漕河等渡槽失温快产冰量大与风速密切相关。基于上述分析,未来可考虑结合气象、水情、冰情实时监测和智能预警预报,建立水温-水量-水力协同调控和动态调度技术体系,重点从缩短冰期输水时长、降低冰情影响范围、优化关键控制指标和挖潜渠道防冰塞性能等多方面全面提升南水北调中线工程冬季输水能力。 展开更多
关键词 水温冰情 时空分布 南水北调中线 冬季防凌 输水能力
下载PDF
南水北调东线一期工程受水区生态环境效益演变 被引量:1
15
作者 高媛媛 杨亚锋 +2 位作者 杨荣雪 刘艺欣 王红瑞 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第3期566-574,共9页
研究南水北调东线一期工程通水以来受水区生态环境效益的演变态势,对南水北调后续工程高质量建设、加快构建国家水网以及促进工程综合效益发挥有决策参考作用。以定性定量相结合的方式分析东线一期工程在优化水资源配置、保障饮水安全... 研究南水北调东线一期工程通水以来受水区生态环境效益的演变态势,对南水北调后续工程高质量建设、加快构建国家水网以及促进工程综合效益发挥有决策参考作用。以定性定量相结合的方式分析东线一期工程在优化水资源配置、保障饮水安全、复苏河湖生态环境和畅通南北经济循环等方面的作用,进而结合层次分析法,从直接效益和间接效益2个方面,筛选构建东线一期工程受水区生态环境效益评价指标体系,主要包括工程年供水量、水质改善度、生态补水量、地下水压采量、地下水水位、水域面积、绿地面积和涵养水源等,并采用VlseKriterijumska Optimizacija I Kompromisno Resenje(VIKOR)多准则妥协解排序方法对南水北调东线一期工程通水以来即2013-2022年受水区生态环境效益演变态势进行分析。结果表明:南水北调东线一期工程通水的10年以来,受水区的生态环境整体复苏效果明显,近3年排序值保持在0.8以上;受降水偏枯进而影响地下水开采量和地下水水位等因素影响,2019年间接生态环境效益下降29.2%,之后迅速恢复并保持稳定。在分析直接效益和间接效益演变的基础上,从工程提质增效、提高工程水质状况以及完善体制机制建设等方面提出东线一期工程进一步促进受水区生态环境持续改善的策略和建议,以期为东线工程及受水区生态环境保护及高质量发展相关研究、决策制定等提供参考。 展开更多
关键词 南水北调东线一期工程 生态环境效益 指标体系 VIKOR
下载PDF
南水北调西线工程水源区和受水区降水变化及丰枯遭遇特征分析
16
作者 王荣 杜孝忠 +5 位作者 巢清尘 赵珊珊 叶殿秀 李修仓 李莹 张梦然 《气候变化研究进展》 CSCD 北大核心 2024年第5期571-580,共10页
基于规划中的南水北调西线工程区域内274个国家气象站1961—2022年逐日降水资料,分析了西线工程水源区和受水区年和四季降水量的时空分布特征,以及两区降水的丰枯遭遇特征。结果表明:近62年来,南水北调西线工程水源区年降水量总体呈增... 基于规划中的南水北调西线工程区域内274个国家气象站1961—2022年逐日降水资料,分析了西线工程水源区和受水区年和四季降水量的时空分布特征,以及两区降水的丰枯遭遇特征。结果表明:近62年来,南水北调西线工程水源区年降水量总体呈增多趋势,而受水区年降水量没有明显变化趋势;夏、冬季水源区和受水区降水量均增多,春、秋季水源区降水量增多而受水区降水量减少;年和春、夏、秋季水源区枯水频率均低于受水区枯水频率,并且水源区枯水频率呈减少趋势,而丰水频率呈增加趋势;水源区和受水区年和四季降水丰枯异步频率普遍在60%以上,远大于丰枯同步频率,有利调水的5种丰枯遭遇在年和春、夏、秋季发生频率均超过50%。总体而言,南水北调西线工程水源区和受水区的降水具有较强的丰枯补偿性,且1971年以来有利调水发生频次呈增加趋势,理论上存在保证供水的可能性。但水源区出现连续枯水年的频次较多。因此,在南水北调西线工程规划设计和运行调度时需充分考虑水源区和受水区降水的变化。 展开更多
关键词 降水 丰枯遭遇 南水北调西线 水源区 受水区
下载PDF
协同推进南水北调后续工程和长江经济带高质量发展 被引量:2
17
作者 鞠连义 《水利发展研究》 2024年第2期45-49,共5页
推动长江经济带高质量发展,是以习近平同志为核心的党中央作出的重大决策,是关系党和国家事业发展全局的重大战略。南水北调东、中、西三条线均以长江为水源,是跨流域跨区域配置水资源的骨干工程,是国家水网的主骨架和大动脉,在保障国... 推动长江经济带高质量发展,是以习近平同志为核心的党中央作出的重大决策,是关系党和国家事业发展全局的重大战略。南水北调东、中、西三条线均以长江为水源,是跨流域跨区域配置水资源的骨干工程,是国家水网的主骨架和大动脉,在保障国家经济安全、粮食安全、生态安全等方面具有基础性、战略性作用。两者联系紧密,互促共生。文章通过对长江经济带高质量发展内涵的分析,以及在国家水安全保障、长江经济带高质量发展对南水北调高质量发展的具体要求梳理的基础上,对共同推进南水北调和长江经济带高质量发展提出了初步的认识和思考。 展开更多
关键词 南水北调 长江经济带 国家水网 高质量发展
下载PDF
南水北调中线总干渠冰盖糙率观测分析
18
作者 段文刚 邢梦媛 +2 位作者 黄明海 杨金波 沙继婷 《长江科学院院报》 CSCD 北大核心 2024年第10期78-85,118,共9页
冰盖糙率是确定渠道冰期输水水位和流量关系的基础参数,一直是明渠冰工程研究的重点之一。鉴于当前大型混凝土渠道冰盖糙率研究成果相当匮乏,以南水北调中线总干渠石家庄以北唯一无输水建筑物的唐河节制闸—放水河节制闸渠段为研究区域... 冰盖糙率是确定渠道冰期输水水位和流量关系的基础参数,一直是明渠冰工程研究的重点之一。鉴于当前大型混凝土渠道冰盖糙率研究成果相当匮乏,以南水北调中线总干渠石家庄以北唯一无输水建筑物的唐河节制闸—放水河节制闸渠段为研究区域,依据全线通水以来唯一生成全渠段封冻冰盖的2016年1—2月逐日水位和流量实测数据,采用伯努利能量方程和谢才-曼宁公式推求渠道糙率,定性定量分析封冻前后渠道糙率变化特征。结果表明:①研究渠段畅流期渠道糙率n b为0.0167,封冻期冰盖综合糙率n c为0.0146,冰盖下表面糙率n i为0.0118。②由于水力磨蚀作用,封冻期冰盖糙率随时间呈波动减小的趋势。③渠道一旦生成封冻冰盖,输水能力大幅降低,仅占渠道设计流量的66.7%。该研究给出了大型混凝土渠道封冻冰盖糙率和输水能力降低的确切数值,以期为冰期输水调度和类似工程设计提供科学依据。 展开更多
关键词 南水北调中线工程 冰盖糙率 渠道糙率 输水能力 水头损失
下载PDF
南水北调中线工程水源地南阳推进EOD模式的路径研究
19
作者 牛亚丽 吴梦 李玉英 《环境保护与循环经济》 2024年第10期39-43,共5页
近年来,生态环境导向的开发(EOD)模式受到广泛关注。南阳作为南水北调中线工程核心水源地,也是渠首所在地,推进EOD模式有助于其将“绿水青山”转变为“金山银山”,能够为生态环境治理与产业协同发展提供有力支撑,同时促进共同富裕。农... 近年来,生态环境导向的开发(EOD)模式受到广泛关注。南阳作为南水北调中线工程核心水源地,也是渠首所在地,推进EOD模式有助于其将“绿水青山”转变为“金山银山”,能够为生态环境治理与产业协同发展提供有力支撑,同时促进共同富裕。农产品资源丰富但竞争力不强、生态产品价值实现周期长、保水质任务艰巨制约着其推进EOD模式。基于此,建议采用“授权—建设—运营”(ABO)模式进行运营,从打造特色名片、构建农产品平台服务体系以及加强合作等方面着手推进。 展开更多
关键词 生态环境导向 开发模式 南水北调中线工程水源地
下载PDF
基于水体交换能力的调水工程对底栖动物群落影响研究 被引量:1
20
作者 方青青 王国强 +2 位作者 张尚弘 王运涛 张思远 《水力发电学报》 CSCD 北大核心 2024年第4期62-72,共11页
水文条件的改变会引起水生态系统的波动变化,大型调水工程的实施会改变水生生物群落结构。本研究分别调研了南四湖和东平湖在调水工程实施前后一段时间的大型底栖动物群落结构,模拟分析了调水工程引起的湖泊水龄变化特征,从水体交换能... 水文条件的改变会引起水生态系统的波动变化,大型调水工程的实施会改变水生生物群落结构。本研究分别调研了南四湖和东平湖在调水工程实施前后一段时间的大型底栖动物群落结构,模拟分析了调水工程引起的湖泊水龄变化特征,从水体交换能力的角度探讨了大型调水工程对湖泊中大型底栖动物群落的影响。结果显示,调水工程运行一段时间后,东平湖中大型底栖动物群落在年尺度上从由小体型的水生昆虫类主导转变为由大体型的软体动物主导,南四湖中软体动物的优势在调水工程实施之后更加凸显。在季节尺度上,软体动物占比通常在调水期(非雨季)减小,而在非调水期(雨季)增大。调水工程的实施改变了湖泊水动力场特征,在年尺度上增强了湖泊水体交换能力,调水入流与入湖径流的叠加使湖泊水体的高流速时间变长,这不利于小体型物种稳定生长,进而导致在年尺度上大体型软体动物的占比逐渐增大。此外,调水工程的实施主要是提升了非雨季湖泊的水体交换能力,但增加调水后的非雨季湖泊水体交换能力仍然小于雨季,这也导致软体动物占比在调水工程实施前后均呈现在雨季减小在非雨季增加的规律。 展开更多
关键词 水动力 大型底栖动物 南水北调 南四湖 东平湖 水龄
下载PDF
上一页 1 2 92 下一页 到第
使用帮助 返回顶部