期刊文献+
共找到250篇文章
< 1 2 13 >
每页显示 20 50 100
Effectiveness of groundwater extraction in Beijing since the ingauration of the first phase of the South-to-North Water Diversion Project, China
1
作者 Yuan-yuan Gao Qing-yu Sun +1 位作者 Ai-xin Wen Yan-pei Cheng 《Journal of Groundwater Science and Engineering》 2023年第3期294-307,共14页
This study assess the effectiveness of groundwater pressure extraction in Beijing since the opening of the first phase of the South-to-North Water Diversion Project,using survey and evaluation methods.Firstly,an analy... This study assess the effectiveness of groundwater pressure extraction in Beijing since the opening of the first phase of the South-to-North Water Diversion Project,using survey and evaluation methods.Firstly,an analysis of water consumption structure and the usage of diverted river water in Beijing in recent years was conducted.Secondly,the volume of groundwater pressure extraction in Beijing after the 33 project's inauguration was examined,revealing a decrease from 1.96 billion m^(3) in 2014 to 1.35 billion m^(3) in 2020.The proportion of water supply reduced from 52.3%in 2014 to 33.3%in 2020,leading to an optimized water supply structure.By the end of 2020,groundwater pressure extraction in Beijing is estimated at 446 million m3,with a substantial reduction in over-exploitation of groundwater.Groundwater resources have been effectively replenished,and the strategic reserve capacity has been enhanced.Furthermore,this study evaluates the change in groundwater levels as an indicator of the effectiveness of pressure extraction.The declining trend of groundwater levels in Beijing has been effectively mitigated,and there has been a consistent rebound in groundwater levels over the past five years. 展开更多
关键词 Beijing City south-to-north water diversion Groundwater Over-exploitation Groundwater Pressure Extraction
下载PDF
Water diversion and agricultural production:Evidence from China 被引量:1
2
作者 YANG Rui XU Hang 《Journal of Integrative Agriculture》 SCIE CAS CSCD 2023年第4期1244-1257,共14页
Water diversion can alleviate water shortages caused by the uneven distribution of water resources.China’s Southto-North Water Diversion Project(SNWD)is the largest water diversion project worldwide.Based on the pref... Water diversion can alleviate water shortages caused by the uneven distribution of water resources.China’s Southto-North Water Diversion Project(SNWD)is the largest water diversion project worldwide.Based on the prefecturelevel data of China’s Huang-Huai-Hai Plain from 2000 to 2020,this study employs an empirical strategy of Differencesin-Differences(DID)to analyze the impact of SNWD on agricultural production.The results show that SNWD has significantly increased agricultural production,measured by the agricultural value added.The estimated results of the benchmark model remain robust when the contemporaneous policy is addressed,an alternative outcome is used,subsamples are estimated,and alternative estimation techniques are employed.This study argues that the potential impact mechanism may be that SNWD significantly increases the acreage for cash crops but reduces that for grain crops.Heterogeneity analysis shows that in prefectures with high temperature or land potential,SNWD’s impact on agricultural value added is relatively low.In contrast,in areas with prolonged sunshine or high slopes,SNWD’s impact on agricultural value added is relatively large.Given the low added value of grain crops,the government should consider strengthening food security by subsidizing water supply to sustain grain production. 展开更多
关键词 south-to-north water diversion Project agricultural production Differences-in-Differences China
下载PDF
Spatio-temporal distribution of phytoplankton in the Danjiangkou Reservoir, a water source area for the South-to-North Water Diversion Project (Middle Route), China 被引量:12
3
作者 殷大聪 郑凌凌 宋立荣 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2011年第3期531-540,共10页
One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR ... One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR area before water diversion, as well as to estimate potential risks of water quality after water diversion, we conducted an investigation on phytoplankton in the DJKR from August 2008 to May 2009. The investigation included 10 sampling sites, each with four depths of 0.5, 5, 10, and 20 m. In this study, 117 taxa belonging to 76 genera were identified, consisting of diatoms (39 taxa), green algae (47 taxa), blue-green algae (19 taxa), and others (12 taxa). Annual average phytoplankton abundance was 2.01×10^6 ind./L, and the highest value was 14.72 ×10^6 ind/L (at site 3 in August 2008). Phytoplankton abundance in front of the Danjiangkou Dam (DJKD) was higher than that of the Danjiang Reservoir Basin. Phytoplankton distribution showed a vertical declining trend from 0.5 m to 20 m at most sites in August 2008 (especially at sites of 1, 2, 4 and 10), but no distinct pattern in other sampling months. In December 2008 and March 2009, Stephanodiseus sp. was the most abundant species, amounting to 55.23% and 72.34%, respectively. We propose that high abundance ofStephanodiscus sp. may have contributed greatly to the frequent occurrence of Stephanodiscus sp. blooms in middle-low reaches of the Hanjiang River during the early spring of 2009. In comparison with previous studies conducted from 1992 to 2006, annual average phytoplankton density, green algae and blue-green algae species, as well as major nutrient concentrations increased, while phytoplankton diversity indices declined. This indicates a gradual decline in water quality. More research should be conducted and countermeasures taken to prevent further deterioration of water quality in the DJKR. 展开更多
关键词 Danjiangkou Reservoir PHYTOPLANKTON south-to-north water diversion Project EUTROPHICATION
下载PDF
Optimization and coordination of South-to-North Water Diversion supply chain with strategic customer behavior 被引量:4
4
作者 Zhi-song CHEN Hui-min WANG 《Water Science and Engineering》 EI CAS 2012年第4期464-477,共14页
The South-to-North Water Diversion (SNWD) Project is a significant engineering project meant to solve water shortage problems in North China. Faced with market operations management of the water diversion system, th... The South-to-North Water Diversion (SNWD) Project is a significant engineering project meant to solve water shortage problems in North China. Faced with market operations management of the water diversion system, this study defined the supply chain system for the SNWD Project, considering the actual project conditions, built a decentralized decision model and a centralized decision model with strategic customer behavior (SCB) using a floating pricing mechanism (FPM), and constructed a coordination mechanism via a revenue-sharing contract. The results suggest the following: (1) owing to water shortage supplements and the excess water sale policy provided by the FPM, the optimal ordering quantity of water resources is less than that without the FPM, and the optimal profits of the whole supply chain, supplier, and external distributor are higher than they would be without the FPM; (2) wholesale pricing and supplementary wholesale pricing with SCB are higher than those without SCB, and the optimal profits of the whole supply chain, supplier, and external distributor are higher than they would be without SCB; and (3) considering SCB and introducing the FPM help increase the optimal profits of the whole supply chain, supplier, and external distributor, and improve the efficiency of water resources usage. 展开更多
关键词 south-to-north water diversion supply chain strategic customer behavior floatingpricing mechanism
下载PDF
Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project 被引量:3
5
作者 Jing-chun FENG Lei LI +4 位作者 Nan YANG Yu-zhen HONG Min PANG Xiong YAO Li-cheng WANG 《Water Science and Engineering》 EI CAS 2011年第2期225-236,共12页
Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the sy... Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields. 展开更多
关键词 multi-resource constraints south-to-north water diversion Project project portfolio critical chain
下载PDF
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period 被引量:3
6
作者 Feng Jingchun Zhou Yang +2 位作者 Hong Yuzhen Zhao Shixin Ren Xiaoqiang 《Water Science and Engineering》 EI CAS 2008年第4期107-113,共7页
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio... In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up. 展开更多
关键词 south-to-north water diversion Project reliability model management chain parallel connection series connection
下载PDF
Wet-Dry Runoff Correlation in Western Route of South-to-North Water Diversion Project,China 被引量:2
7
作者 HUANG Xiao-rong ZHAO Jing-wei YANG Peng-peng 《Journal of Mountain Science》 SCIE CSCD 2015年第3期592-603,共12页
The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upst... The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upstream of the Yellow River (water- importing area). The long-term hydrologieal data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow eharacteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, water- importing area, and the streteh downstream of the water-exporting have synehronization in high-low flow relationship, whereas they display non- synchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological eompensation probability for rivers where water is diverted is about 25% to lO%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the water- exporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the water- exporting area. 展开更多
关键词 south-to-north water diversion Project Yangtze River Streamflow Encounter probability Correlation coefficient Cycle Hydrologicalcompensation
下载PDF
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:3
8
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification Middle Route of the south-to-north water diversion Project(MR-SNWDP) China
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
9
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model south-to-north water diversion Project
下载PDF
IMPACTS OF THE SOUTH-TO-NORTH WATER DIVERSION PROJECTS (MIDDLE ROUTE)ON THE WATER ENVIRONMENT OF THE MIDDLE AND LOWER REACHES OF THE HANJIANG RIVER
10
作者 FAN Bei-Lin, WAN Jian-Rong, ZHANG Jie and LIN Qiu-Sheng (Yangtze River Scientific Research Institute,River Research Deparment, Wuhan 430010,China) 《水生生物学报》 CAS CSCD 北大核心 2006年第6期643-646,共4页
In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well... In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well as their impacts on the environment of the middle and lower reaches of the Hanjiang River. The results showed that the 95×10 8m 3 water diversion scheme will cause less erosion and water level decrease than the 15×10 8m 3 water diversion scheme. Using a water diversion scheme of 95×10 8m 3, the decrease of water quantity can impact the river hydrodynamic regime substantially and the environments of the middle and lower reaches of the Hanjiang River will be greatly affected. It is therefore necessary to develop new water resources or build projects to meet the need of the environment and the needs for navigation. 展开更多
关键词 south-to-north water diversion Project River regime water environment Mathematical model
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
11
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water Transfer Project
下载PDF
Water-saving potential evaluation of water-receiving regions in Shandong province on the East Route of the South-to-North Water Transfer Project of China
12
作者 YIN Xiao-lin GAO Yuan-yuan +1 位作者 WU Hai-ping ZHAO Xue-ming 《Journal of Groundwater Science and Engineering》 2020年第3期287-297,共11页
Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route... Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route of the South-to-North(MRSNWDP),the current water-saving potential of the water-receiving areas within the municipalities of Shandong was analyzed.Different water-saving scenarios were constructed and analyzed with key water-saving indexes in various industries.These indexes include the effective utilization coefficient of farmland irrigation water,total water consumption of industrial sectors with an added value of over 10000 RMB,average leakage rate of the urban public water supply pipe network and the penetration rate of water-saving appliances.Based on the scenarios,comprehensive water-saving potential of the 13 water-receiving area cities was calculated.The results show that the water-saving potential of the study area is at a relative high level.However,some cities still have a certain amount of water-saving potential for agriculture and industry to be elevated.Under the recommended water-saving scenario,the water-saving potential is 1.134 billion m3,accounting for 5.33%of the current total water consumption,of which 460 million m3 is in agriculture,600 million m3 in industry,is and 74.20 million m3 in urban domestic sector.Comprehensive water-saving measures for the study area were proposed from the aspects of agricultural,industrial and domestic water uses.Agricultural and industrial water saving are more significant.The major cities for agricultural water saving include Jining City,Heze City,Weifang City and Jinan City;the focus cities of industrial water saving mainly include Weihai City,Jining City and Qingdao City and etc.;the key water-saving areas for urban use mainly include Zaozhuang City,Jining City and Heze City. 展开更多
关键词 East Route of south-to-north water diversion Project Shandong water receiving area water-saving level water-saving potential
下载PDF
引江补汉工程丹江口下游近坝段枯水期通航水位恢复试验研究
13
作者 朱勇辉 郭小虎 +2 位作者 李凌云 王彦君 张丹 《长江科学院院报》 CSCD 北大核心 2024年第10期6-13,共8页
引江补汉工程补水口位于丹江口大坝下游安乐河出口约5 km处,且补水量与调水量基本一致,工程对航道的影响主要体现在减水段,为恢复枯水期通航水位需要开展航道综合治理。利用河工模型试验论证了综合治理方案的效果,并对方案进行了优化及... 引江补汉工程补水口位于丹江口大坝下游安乐河出口约5 km处,且补水量与调水量基本一致,工程对航道的影响主要体现在减水段,为恢复枯水期通航水位需要开展航道综合治理。利用河工模型试验论证了综合治理方案的效果,并对方案进行了优化及进一步论证。结果表明,减水-补水212 m 3/s方案尾门水位分别为86.47、85.90 m条件下,引航道口—黄家港段水位下降,黄家港以下水位保持不变,其中引航道口水位下降幅度最大,分别下降0.08、0.19 m;综合治理方案1实施后引航道口水位下降均为0.02 m,减水段的水位仍未恢复至调水前的水平,主因是从安乐河口补水的水流并未能进入到左侧主航道内;基于试验研究结果,建议对综合治理方案进行优化,在沧浪洲出水口下沿布置2道护底带;通过试验论证了护底带的4个高程,建议护底带高程为85.5 m,并对护底带高程进一步细化论证;优化后的方案可使引航道口至黄家港段的水位略超过调水前的水平,其中引航道口处最大水位抬高0.06 m。 展开更多
关键词 引江补汉工程 近坝段 枯水期 通航水位 河工模型试验 恢复试验 航道综合治理
下载PDF
物元可拓法在引水隧洞围岩稳定性评价中的应用 被引量:4
14
作者 张书豪 艾亚鹏 +2 位作者 陈健 靳春玲 姬照泰 《安全与环境学报》 CAS CSCD 北大核心 2024年第1期10-18,共9页
为预防和控制引水隧洞中围岩失稳事故的发生,将物元可拓法应用于围岩稳定性评价中。以滇中引水工程为背景,选取滇中引水工程某隧洞段,构建引水隧洞围岩稳定性评价指标体系,划分围岩等级,选用灰色关联分析法(Grey Relational Analysis, G... 为预防和控制引水隧洞中围岩失稳事故的发生,将物元可拓法应用于围岩稳定性评价中。以滇中引水工程为背景,选取滇中引水工程某隧洞段,构建引水隧洞围岩稳定性评价指标体系,划分围岩等级,选用灰色关联分析法(Grey Relational Analysis, GRA)和因子分析法(Factor Analysis, FA)组合确定权重,基于物元可拓模型进行引水隧洞围岩稳定性评价,以期减少目前评价方法中一些不相容现象及其他问题所带来的影响,从而提升长距离特大输水工程围岩稳定性等级评价的精度。结果表明,GRA-FA-物元可拓模型围岩稳定性评价结果与实际等级基本相符,与逼近理想解排序法(Technique for Order Preference by Similarity to Ideal Solution, TOPSIS)相比,预测评价精度从62.5%提升到87.5%,准确性提升了约25百分点。因此,GRA-FA-物元可拓模型相较以往的评价模型可以更全面和客观地进行引水隧洞围岩稳定性评价,可为其他长距离特大引水工程施工风险评价提供理论支撑。 展开更多
关键词 安全工程 滇中引水工程 围岩稳定性 灰色关联分析法 因子分析法 物元可拓模型
下载PDF
纤维复合材料在调水工程长输管道中的应用 被引量:1
15
作者 代元 徐洁 丁瑶 《合成材料老化与应用》 CAS 2024年第3期63-66,共4页
调水工程长距离输水管道的材料选择,对工程成本和输水线路的安全有着重要影响。纤维复合材料具有轻质高强、内壁光滑、耐腐蚀性好等特点,正逐步应用在输水管道中。文章分析了影响长距离输水管道材料选择的主要因素,介绍了钢管、球墨铸... 调水工程长距离输水管道的材料选择,对工程成本和输水线路的安全有着重要影响。纤维复合材料具有轻质高强、内壁光滑、耐腐蚀性好等特点,正逐步应用在输水管道中。文章分析了影响长距离输水管道材料选择的主要因素,介绍了钢管、球墨铸铁管、混凝土管等传统输水管道的材料特性,阐述了纤维复合材料在输水管道中的应用,重点分析了玻璃钢夹砂管的发展和特点,最后对纤维复合材料输水管道在产品升级、施工技术、安全防护和质量管理四个方面的发展进行了展望。 展开更多
关键词 调水工程 长距离输水管道 纤维复合材料 玻璃钢夹砂管 安全防护
下载PDF
甘肃省黑河下游河水漫溢的时空演变及其影响因素
16
作者 陈俊鹏 鱼腾飞 +3 位作者 王之君 殷一丹 陈小玲 王昱 《水资源与水工程学报》 CSCD 北大核心 2024年第5期90-99,共10页
生态输水是干旱区内陆河流域退化生态系统恢复的主要措施,而流域下游的河水漫溢直接关系到绿洲的恢复成效。基于1987—2021年全球地表水体数据集,结合流域内自然环境和人类活动等数据,通过GEE平台构建的水体频率,即像素点在特定时间段... 生态输水是干旱区内陆河流域退化生态系统恢复的主要措施,而流域下游的河水漫溢直接关系到绿洲的恢复成效。基于1987—2021年全球地表水体数据集,结合流域内自然环境和人类活动等数据,通过GEE平台构建的水体频率,即像素点在特定时间段内观测到水体的次数与总观测次数的比率,分析了黑河下游生态输水前、后河水漫溢的时空演变及其影响因素。结果表明:分水前1987—2001年正义峡、哨马营和狼心山的年均径流量分别为8.86×10^(8)、5.28×10^(8)、4.27×10^(8)m^(3),分水后2002—2021年分别为11.99×10^(8)、8.12×10^(8)、6.70×10^(8)m^(3),狼心山-东居延海段的年均径流量(即绿洲可利用水资源量)为6.17×10^(8)m^(3),时间上主要集中在4—5和9—10月;分水后永久性水体面积逐渐增加且主要集中在东居延海,2004年后东居延海出现永久性水体,水体频率最高出现在哨马营-狼心山段河道两侧,其次是东居延海及其外围区域,东河、西河及西居延海水体频率相对较低;分水前河水漫溢主要是由自然水文过程引起的,同时也受到中游人类活动的较大影响,分水后河水漫溢与生态输水量呈显著正相关(P<0.01),下游年蒸发量和人类活动均与河水漫溢呈显著负相关(P<0.01)。建议兴建和修缮黑河下游水利设施,改善下游河水漫溢的时空分布不均性,保障下游生态系统的健康与安全。 展开更多
关键词 河水漫溢 Google Earth engine 水体频率 生态分水 黑河下游
下载PDF
高压富水硬岩地层双护盾TBM前置式超前注浆堵水技术研究
17
作者 冀国栋 王立川 +5 位作者 陈典华 王灿林 王宝友 李庆斌 黄江帆 陈霞飞 《施工技术(中英文)》 CAS 2024年第1期87-92,共6页
晋中引黄输水隧洞双护盾TBM施工穿越高压富水裂隙,掌子面高压大流量突涌水严重,采用常规后置式超前注浆技术对掌子面突涌水进行超前处置效果不佳,主要原因是受外插角影响,采用常规后置式超前注浆存在注浆目标区域受限、钻探效率低、超... 晋中引黄输水隧洞双护盾TBM施工穿越高压富水裂隙,掌子面高压大流量突涌水严重,采用常规后置式超前注浆技术对掌子面突涌水进行超前处置效果不佳,主要原因是受外插角影响,采用常规后置式超前注浆存在注浆目标区域受限、钻探效率低、超前注浆控制难度大等问题,难以形成有效的止水帷幕结构。对隧洞水文地质条件、突涌水情况及超前注浆技术进行系统研究分析,提出双护盾TBM前置式超前注浆堵水工艺,通过优化注浆设备,在掌子面处实施超前注浆堵水。开展现场注浆试验,对坚硬岩面钻孔施工、注浆材料、注浆参数控制及注浆段长优化等技术进行研究,并根据现场试验信息,不断优化注浆设备及工艺。通过对晋中引黄输水隧洞实施前置式超前注浆堵水技术,洞内平均出水量降至3 702m~3/d,降幅达75.9%,同时在一定程度上提高了TBM施工效率。实践证明该技术方法有效。 展开更多
关键词 地下工程 输水隧洞 硬岩地层 双护盾TBM 突涌水 注浆
下载PDF
水利工程施工中引水隧洞施工技术研究 被引量:1
18
作者 王丰 《黑龙江科学》 2024年第18期107-108,112,共3页
在水利工程施工中,为提高水库的供水能力,可采用引水隧洞施工技术进行施工。以某工程为例,分析了盾构法、隧洞挖掘技术、隧洞支护技术、混凝土施工技术及隧洞灌浆技术的应用,以提高引水隧洞施工质量,确保施工安全。
关键词 水利工程 引水隧洞施工技术 支护技术 灌浆技术
下载PDF
跨活断层隧洞抗错断技术模型试验研究
19
作者 曹俊 崔臻 +1 位作者 颜天佑 李建贺 《人民长江》 北大核心 2024年第1期200-207,共8页
长大隧洞工程不可避免地要跨越活动断裂带及其影响区域,为减少因断层错动而导致的隧洞结构破坏,抗错断设计是隧洞设计的重要内容。以滇中引水工程香炉山隧洞为背景,对包括铰接设计、扩挖-缓冲层设计以及铰接-扩挖-缓冲层在内的3种抗错... 长大隧洞工程不可避免地要跨越活动断裂带及其影响区域,为减少因断层错动而导致的隧洞结构破坏,抗错断设计是隧洞设计的重要内容。以滇中引水工程香炉山隧洞为背景,对包括铰接设计、扩挖-缓冲层设计以及铰接-扩挖-缓冲层在内的3种抗错断措施进行模型试验研究;从衬砌内部破坏、隧洞整体破坏、衬砌应变方面,对上述3种抗错断措施抗断效果进行了验证评估。研究结果表明:(1)从隧洞衬砌结构内部破坏特征来看,铰接设计与扩挖-缓冲层设计都可以对衬砌起到保护作用。(2)从隧洞整体变形和裂纹分布来看,使用铰接设计增大了隧洞在断层带区域的变形程度,但减小了衬砌本身的破坏;使用扩挖-缓冲层设计不仅减小了隧洞在断层带区域的变形,同时也相对减小了对衬砌本身的破坏,经铰接-扩挖-缓冲层设计的隧洞变形几乎只出现在铰接处,衬砌破坏更小。(3)从隧洞纵向应变分布规律来看,扩挖设计和铰接设计都减小了衬砌的应变,其中铰接设计对衬砌应变的减弱最为突出。相关研究成果可为跨活断裂隧洞实际工程中抗错断方案的选用提供参考。 展开更多
关键词 隧洞工程 活动断裂带 抗错段技术 铰接设计 扩挖设计 香炉山隧洞 滇中引水工程
下载PDF
隧洞工程建设对水环境影响预测评价——以滇中引水工程狮子山隧洞为例
20
作者 黄靖宇 曾柯耀 +1 位作者 赵永川 张强 《地下水》 2024年第1期23-25,共3页
明确隧洞(道)建设对周围水环境的影响可以及时对相应地表水体与水资源做出科学合理的保护措施与合理调配。滇中引水狮子山隧洞的建设涉及多处水环境敏感点,在对区域自然地质背景与水文地质条件做出充足的资料收集与野外调查后,采用了数... 明确隧洞(道)建设对周围水环境的影响可以及时对相应地表水体与水资源做出科学合理的保护措施与合理调配。滇中引水狮子山隧洞的建设涉及多处水环境敏感点,在对区域自然地质背景与水文地质条件做出充足的资料收集与野外调查后,采用了数值软件模拟隧洞排水条件下的渗流场变化程度,并以此作为依据对敏感点进行了评价分析,结果表明:地下水水位下降主要在罗贤观北侧岩溶山地区域,隧洞建设对梁王山岩溶大泉和小官村水库的影响较小。研究成果为隧洞建设期的环境保护提供了有效的指导方向,研究思路在相关工程的勘察工作中具有一定的借鉴价值。 展开更多
关键词 隧道工程 水环境 数值模拟 滇中引水
下载PDF
上一页 1 2 13 下一页 到第
使用帮助 返回顶部