As China’s only manned launch vehicle,the LM-2 F Launch vehicle successfully launched the Shenzhou 12 manned spacecraft into its predetermined orbit on June 12,2021,signifying the successful completion of the first m...As China’s only manned launch vehicle,the LM-2 F Launch vehicle successfully launched the Shenzhou 12 manned spacecraft into its predetermined orbit on June 12,2021,signifying the successful completion of the first manned launch mission in the construction and key technology test stage of China Space Station(CSS).From the launch of the Shenzhou 11 manned spacecraft on October 12,2016 to the launch of Shenzhou 12 in 2021,over the past five years,the LM-2 F launch vehicle has been continuously improved in terms of product reliability through technological innovation and design improvement,and its flight reliability index has increased from 0.97 to 0.98.Based on the new launch mission requirements for the construction stage of CSS,this paper introduces the technological innovation and reliability improvement methods of the LM-2 F from the aspects of design improvement,research methods and process optimization.The LM-2 F launch vehicle will make greater contributions in supporting the construction of CSS with higher reliability and perfect launch success rate.展开更多
This paper studies the problem of the space station short-term mission planning, which aims to allocate the executing time of missions effectively, schedule the corresponding resources reasonably and arrange the time ...This paper studies the problem of the space station short-term mission planning, which aims to allocate the executing time of missions effectively, schedule the corresponding resources reasonably and arrange the time of the astronauts properly. A domain model is developed by using the ontology theory to describe the concepts, constraints and relations of the planning domain formally, abstractly and normatively. A method based on time iteration is adopted to solve the short-term planning problem. Meanwhile, the resolving strategies are proposed to resolve different kinds of conflicts induced by the constraints of power, heat, resource, astronaut and relationship. The proposed approach is evaluated in a test case with fifteen missions, thirteen resources and three astronauts. The results show that the developed domain ontology model is reasonable, and the time iteration method using the proposed resolving strategies can successfully obtain the plan satisfying all considered constraints.展开更多
空间站作为近地空间的大型平台,具备长期飞行与空间科学探索能力.随着在轨任务的不断增加,高效空间站在轨运行管理成为挑战性的难题.人工智能与航天技术的深度融合,使得空间站在轨运行逐步向智能化发展,航天器在轨运行智能化已成为必然...空间站作为近地空间的大型平台,具备长期飞行与空间科学探索能力.随着在轨任务的不断增加,高效空间站在轨运行管理成为挑战性的难题.人工智能与航天技术的深度融合,使得空间站在轨运行逐步向智能化发展,航天器在轨运行智能化已成为必然趋势.本文对国际空间站(International Space Station,ISS)在轨智能化发展历程进行了深入分析,调研人工智能技术在其健康管理、任务规划与调度、任务操作和人机交互中的应用,以期对未来中国空间站的智能在轨运行提供启示.展开更多
文摘As China’s only manned launch vehicle,the LM-2 F Launch vehicle successfully launched the Shenzhou 12 manned spacecraft into its predetermined orbit on June 12,2021,signifying the successful completion of the first manned launch mission in the construction and key technology test stage of China Space Station(CSS).From the launch of the Shenzhou 11 manned spacecraft on October 12,2016 to the launch of Shenzhou 12 in 2021,over the past five years,the LM-2 F launch vehicle has been continuously improved in terms of product reliability through technological innovation and design improvement,and its flight reliability index has increased from 0.97 to 0.98.Based on the new launch mission requirements for the construction stage of CSS,this paper introduces the technological innovation and reliability improvement methods of the LM-2 F from the aspects of design improvement,research methods and process optimization.The LM-2 F launch vehicle will make greater contributions in supporting the construction of CSS with higher reliability and perfect launch success rate.
基金supported by the National Natural Science Foundation of China(11402295)the Science Project of National University of Defense Technology(JC14-01-05)the Hunan Provincial Natural Science Foundation of China(2015JJ3020)
文摘This paper studies the problem of the space station short-term mission planning, which aims to allocate the executing time of missions effectively, schedule the corresponding resources reasonably and arrange the time of the astronauts properly. A domain model is developed by using the ontology theory to describe the concepts, constraints and relations of the planning domain formally, abstractly and normatively. A method based on time iteration is adopted to solve the short-term planning problem. Meanwhile, the resolving strategies are proposed to resolve different kinds of conflicts induced by the constraints of power, heat, resource, astronaut and relationship. The proposed approach is evaluated in a test case with fifteen missions, thirteen resources and three astronauts. The results show that the developed domain ontology model is reasonable, and the time iteration method using the proposed resolving strategies can successfully obtain the plan satisfying all considered constraints.
文摘空间站作为近地空间的大型平台,具备长期飞行与空间科学探索能力.随着在轨任务的不断增加,高效空间站在轨运行管理成为挑战性的难题.人工智能与航天技术的深度融合,使得空间站在轨运行逐步向智能化发展,航天器在轨运行智能化已成为必然趋势.本文对国际空间站(International Space Station,ISS)在轨智能化发展历程进行了深入分析,调研人工智能技术在其健康管理、任务规划与调度、任务操作和人机交互中的应用,以期对未来中国空间站的智能在轨运行提供启示.