期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
On the cyclic behaviour of new pier-to-deck connections for short-medium span composite I-girder bridges 被引量:2
1
作者 Fabrizio Paolacci Renato Giannini +1 位作者 Silvia Alessandri Daniele Corritore 《Journal of Traffic and Transportation Engineering(English Edition)》 2018年第6期439-453,共15页
Short-medium span steeleconcrete composite I-girder bridges are becoming more and more popular, because of the reduced construction time and costs. The light weight renders them particularly suitable also is seismic a... Short-medium span steeleconcrete composite I-girder bridges are becoming more and more popular, because of the reduced construction time and costs. The light weight renders them particularly suitable also is seismic areas, even though this advantage has not been yet adequately investigated. In fact, in case of seismic loading, significant tensile forces might be exhibited at the bottom flange of the steel girder, especially when monolithic connection between deck and pier is adopted, and the connection, conceived for sustaining prevailing hogging bending moments, could experience an excessive damage.With this aim, the cyclic behaviour of new pier-to-deck joints involving the use of concrete cross-beams(CCB) has been recently analysed within the European project(SEQBRI). This paper deals with the results of a wide experimental investigation of these new joints,performed with the aim of characterizing their hysteretic behaviour. Three different typologies were tested: one designed according to the German standard DIN-FB-104, generally utilized for gravity loads only, and other two types proposed for bridges located in low(VAR-1) and medium(VAR-2) seismicity. A series of displacement-imposed cyclic tests highlighted a good seismic behaviour of all the tested solutions. In particular, the DIN-FB-104 VAR C and VAR-2 displayed a similar global behaviour in terms of maximum force and displacement, but with a more pronounced crack development and buckling of steel girders of the first solution. The VAR-2 also avoids possible pull-out phenomena in the CCB thanks to the beneficial action of pre-stressing bars.A damage analysis of the proposed connections was finally performed in view of the application of the performance-based earthquake engineering methodology and the quantification the seismic performance of this bridge typology, which was among the aims of SEQBRI project. 展开更多
关键词 steele-concrete bridges Concrete cross-beam Cyclic behaviour Experimental test Damage analysis
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部