期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Key Technologies for Design of Changqing Yellow River Super-long Bridge of Zhengzhou Ji'nan HSR
1
作者 ZUO Jiaqiang ZHANG Shang +3 位作者 MA Chenlong WANG Zongfeng ZHANG Hai ZHENG Mingda(Translated) 《Chinese Railways》 2023年第2期3-11,共9页
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de... Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge. 展开更多
关键词 Zhengzhou-Ji'nan HSR Changqing Yellow River super-long Bridge partial cable stayed bridge multi-tower cable-stayed bridge multiple span and long connection bridge design
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部