In view of the study on mining transferred from open-pit to underground, the research on the problem of the stabil- ity of slope is less. This article combined the actual situation of the Gaohai Coal Mine in Fuxin Cit...In view of the study on mining transferred from open-pit to underground, the research on the problem of the stabil- ity of slope is less. This article combined the actual situation of the Gaohai Coal Mine in Fuxin City and set up a three-dimensional model of the part of Huizhou open-pit slope by the finite difference software. Through the three-dimensional numerical simulation study of the influence on the stability of slope by underground mining, the basic characteristics of the open-pit slope deformation and the situation of basic stability were discussed. The simulation results of the mining slope of the displacement and deformation analysis of the state for mining provide a reference to the slope stability research.展开更多
This paper will present a detailed analysis of the deformation mechanism and stability assessment of the slope through field investigations, numerical modeling and measurements. Field investigation indicated that thre...This paper will present a detailed analysis of the deformation mechanism and stability assessment of the slope through field investigations, numerical modeling and measurements. Field investigation indicated that three thin coal seams encountered large mined-out area at one side and free surface of hill slope at the other side, which lead to the caving of roof strata movement, ground movement and crown crack along the preferred orientations of joints. The three-dimensional numeri- cal modeling study on the case demonstrated that the plasticity failure occurred gradually along with the extension of mined-out area in depth. When the depth of mining reached the verge defined by the seismic prospecting method, a large mount of tension failure occurred on the crown of the slope. The factor of safety was 1.36 calculated by the shear strength reduction technique, which indicated the slope was in stable state. The measurement showed that the residual deformation occurred before 1998 and became stable subsequently, which indicated that the residual deformation almost finished and the slope is in stable state.展开更多
Underground mining is an economically viable option for exploiting ore reserves deemed uneconomic after open pit mining. However, underground development can have adverse effects on the above existing open pit slope w...Underground mining is an economically viable option for exploiting ore reserves deemed uneconomic after open pit mining. However, underground development can have adverse effects on the above existing open pit slope walls. As a goal of this paper, identification and assessment of potential slope instabilities prior to underground development is crucial for safe and sustainable mining. Towards goal achieving, this paper gives a comprehensive parametric study to investigate the influence of sublevel open stope (SLOS) underground mining on the surface and open pit slope walls. By means of numerical simulation, the SLOS design is tried against the existing open pit followed by adjustments of important slope parameters which are overall slope height (OSH) and overall slope angle (OSA). We found that underground mining may induce slope failure, particularly on the hangingwall side of the pit. Subsidence is prominent on the hanging wall and the surface, whereas, the uplift dominates the footwall and pit bottom. Pit wall closure is observed during underground mining. Although the assigned dimensions in the parametric study show a negligible effect of OSH and OSA, the high OSH experience low subsidence in comparison with low OSH. Overall, the results demonstrate that the slope walls on the hanging wall side are mostly affected by the underground mining and high-stress concentration prevails near slope toes and pit bottom. Additionally, slope deformation decrease from pit bottom towards the slope crest and surface. The results of this study add knowledge to open pit and underground mining interaction.展开更多
Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining tech...Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized.展开更多
Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equi...Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equilibrium method. The calculation results present that the safety factors of pillars in Sections 19, 20, 24, 28 are less than 1.3, and those of unstable sections are identified preliminarily. Further, a numerical investigation in Sections 18, 20, 22, 24, 25 and 28 implemented with numerical code RFPA20 is employed to further validate the pillar performance and the stability of stopes. The numerical results show the pillars in Sections 18, 22 and 24 are stable and the designed pillar size is suitable. The width of the ore body near Section 28 averages 20 m, failure occurs in the left stope, but the boundary pillars near Section 28 maintain good performance. The pillars in Sections 20 and 25 are unstable which are mainly affected by the Faults F8 and F18. The existence of faults alters the stress distribution, failure mode and water inrush pathway. This work provides a meaningful standard for boundary pillar and stope design in a mine as it transitions from an open pit to underground.展开更多
The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put f...The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put for-ward through analyzing the limitations of moving cone method under such conditions. With a view to recovering asmuch mineral resource as possible and making the maximum profit from the whole deposit, the new principle is tomaximize the sum of gain from both open-pit and underground mining. The mathematical models along the horizon-tal and vertical directions and modules for software package (DM&MCAD) have been developed and tested inTonglushan Copper Mine. It has been proved to be rather effective in the mining practice.展开更多
The artificial neural network model which forecasts Open Mining Slope stability is established by neural network theory and method. The nonlinear reflection relation between stability target of open mining slope and i...The artificial neural network model which forecasts Open Mining Slope stability is established by neural network theory and method. The nonlinear reflection relation between stability target of open mining slope and its influence factor is described. The method of forecasting Open Mining Slope stability is brought forward.展开更多
The basics of mining landslides were first summed up based on the analysis ofactual materials by the application of mining subsidence and landslide theories. Further,the mechanism of along-layer landslide by mining wa...The basics of mining landslides were first summed up based on the analysis ofactual materials by the application of mining subsidence and landslide theories. Further,the mechanism of along-layer landslide by mining was studied with the example of theXiangshan mining landslide at Hancheng, Shaanxi Province. Meanwhile, the state ofstress, and the mechanism of deformation and destruction of the Xiangshan mining slopewere analyzed by the Finite Element Method.展开更多
A mathematical model based on influence function method was established to predict the surface movement and deformation due to underground mining, and the impact on the upper hydraulic facilities in one coal mine was ...A mathematical model based on influence function method was established to predict the surface movement and deformation due to underground mining, and the impact on the upper hydraulic facilities in one coal mine was analyzed used the model. The analysis indicates: the maximum surface subsidence reaches 3.5 m, and the predicted maximum horizontal surface deformation reaches 7.0 mm/m, which would result in crack, deformation and uneven settlement in the soil foundation of the upper hydraulic facilities and influence the quality directly. Therefore, reasonable engineering measurements should be adopted to ensure the safe operation.展开更多
Repetitive mining beneath bedding slopes is identified as a critical factor in geomorphic disturbances, especially landslides and surface subsidence. Prior research has largely concentrated on surface deformation in p...Repetitive mining beneath bedding slopes is identified as a critical factor in geomorphic disturbances, especially landslides and surface subsidence. Prior research has largely concentrated on surface deformation in plains due to multi-seam coal mining and the instability of natural bedding slopes, yet the cumulative impact of different mining sequences on bedding slopes has been less explored. This study combines drone surveys and geological data to construct a comprehensive three-dimensional model of bedding slopes. Utilizing FLAC3D and PFC2D models, derived from laboratory experiments, it simulates stress, deformation, and failure dynamics of slopes under various mining sequences. Incorporating fractal dimension analysis, the research evaluates the stability of slopes in relation to different mining sequences. The findings reveal that mining in an upslope direction minimizes disruption to overlying strata. Initiating extraction from lower segments increases tensile-shear stress in coal pillar overburdens, resulting in greater creep deformation towards the downslope than when starting from upper segments, potentially leading to localized landslides and widespread creep deformation in mined-out areas. The downslope upward mining sequence exhibits the least fractal dimensions, indicating minimal disturbance to both strata and surface. While all five mining scenarios maintain good slope stability under normal conditions, recalibrated stability assessments based on fractal dimensions suggest that downslope upward mining offers the highest stability under rainfall, contrasting with the lower stability and potential instability risks of upslope downward mining. These insights are pivotal for mining operations and geological hazard mitigation in multi-seam coal exploitation on bedding slopes.展开更多
This paper outlines the results obtained from real time microseismic monitoring of an opencast coal mine in South India.The objective of the study is to investigate the stress changes within the rockmass along the slo...This paper outlines the results obtained from real time microseismic monitoring of an opencast coal mine in South India.The objective of the study is to investigate the stress changes within the rockmass along the slope due to underground mine development operation and their impact on the stability of the highwall slope.The installed microseismic systems recorded the seismic triggerings down toà2 moment magnitude.In general,most of the events recorded during the monitoring period are weak in seismic energy.The study adopts a simple and more reliable tool to characterize the seismically active zone for assessing the stability of the highwall in real time.The impact of underground working on the slope is studied on the basis of the seismic event impact contours and seismic clusters.During the monitoring period,it is observed that the intensity of the overall microseismic activity along the slope due to the mine development operations did not cause any adverse impact on the highwall stability.展开更多
Slope failures are an inevitable aspect of economic pit slope designs in the mining industry.Large open pit guidelines and industry standards accept up to 30%of benches in open pits to collapse provided that they are ...Slope failures are an inevitable aspect of economic pit slope designs in the mining industry.Large open pit guidelines and industry standards accept up to 30%of benches in open pits to collapse provided that they are controlled and that no personnel are at risk.Rigorous ground control measures including real time monitoring systems at TARP(trigger-action-response-plan)protocols are widely utilized to prevent personnel from being exposed to slope failure risks.Technology and computing capability are rapidly evolving.Aerial photogrammetry techniques using UAV(unmanned aerial vehicle)enable geotechnical engineers and engineering geologists to work faster and more safely by removing themselves from potential line-of-fire near unstable slopes.Slope stability modelling software using limit equilibrium(LE)and finite element(FE)methods in three dimensions(3D)is also becoming more accessible,user-friendly and faster to operate.These key components enable geotechnical engineers to undertake site investigations,develop geotechnical models and assess slope stability faster and in more detail with less exposure to fall of ground hazards in the field.This paper describes the rapid and robust process utilized at BHP Limited for appraising a slope failure at an iron ore mine site in the Pilbara region of Western Australia using a combination of UAV photogrammetry and 3D slope stability models in less than a shift(i.e.less than 12 h).展开更多
The geotechnical slope design of an open pit wall starts at the bench scale configuration.At this scale,the rock slope stability is governed primarily by the geological discontinuities within the rock mass and as a re...The geotechnical slope design of an open pit wall starts at the bench scale configuration.At this scale,the rock slope stability is governed primarily by the geological discontinuities within the rock mass and as a result,structurally-controlled failures(e.g.planar,wedge or toppling)are most likely to occur.The probabilistic approach offers a major advantage over the traditional deterministic method in that it accounts for the different degrees of variability and uncertainty often encountered in rock properties.This paper presents a bench slope stability assessment for an open pit mine in Peru using a probabilistic-based approach by coupling a kinematic analysis based on stereographic projection techniques followed by a kinetic analysis by means of the limit equilibrium method.Finally,these two probabilities are combined to provide an overall measure of the probability of failure(PoF)of the bench slope system.The case study is characterized by significant scatter in the geometrical and mechanical properties of the joints.Extensive surface mapping was conducted at 36 different sites following the ISRM suggested procedures.Several direct shear tests were carried out.It is shown that by combining field and laboratory measurements and engineering judgment,the probability density functions(PDF)of the discontinuity parameters can be obtained.These are then used in a Monte Carlo simulation process to compute both kinematic and kinetic probabilities of failure.The overall probability of failure aims to provide the design engineer with a tool to critically evaluate the bench performance from a geotechnical risk perspective and to provide a basis for future bench design optimization.展开更多
In order to study the influence of depth-thickness ratio on bedding slope stability, whose sliding surface is flexural concave in shape under mining conditions, this paper aims to study the characteristics ofdeformari...In order to study the influence of depth-thickness ratio on bedding slope stability, whose sliding surface is flexural concave in shape under mining conditions, this paper aims to study the characteristics ofdeformarion and damage of bedding sliding with depth-thickness ratios of 200:1,150:1,120:1,100:1 and 50:1 by adopting numerical simulation analysis software combined with laboratory-made "under the influence of mining variable sliding surface slope similar simulation test bed", and to propose identification methods for slope stability under the infuence of mining. The results show that mining activities under the slope reduce slope stability. With a decrease in the mining depth ratio, the influence of mining on the slope increases gradually, and the damage to the slope gradually expands, the stability of the slope grad- ually reduces, fracture occurs on the slope toe and the central fissure gradually develops to the surface, and reaches slide threshold when the depth-thickness ratio is 50:1.展开更多
Surface stability is essential in underground mines health management systems. Unexpected Surface displacement in underground mines could lead to loss of lives, injuries, and economic losses. To reduce or neutralise t...Surface stability is essential in underground mines health management systems. Unexpected Surface displacement in underground mines could lead to loss of lives, injuries, and economic losses. To reduce or neutralise the adverse effects of surface displacement, it is vital to monitor and accurately predict them and unravel their mechanisms. In recent years, Convolutional Neural Network (CNN) and Long Short-Term Memory (LSTM) have proven effective in predicting complex problems. However, CNN neglects the dynamic dependency of the input in the temporal dimension, which affects surface displacement features. The Convolutional-LSTM model can dynamically learn the temporal dependency among input features via the feedback connections in the LSTM to improve accurate captures of surface displacement features. This study focused on evaluating the C-LSTM model in predicting surface displacement of underground mines and assessed the predictive capabilities and generalisation strength of using hybridised ANN models. Geodetic and geotechnical data gathered from a Gold Mine in Ghana was used. The three models were tested on experimental data collected at Monitoring Scan Point 3. It was observed from the prediction output that all the methods could provide applicable and practical results. However, using indicators like root mean square error (RMSE) and correlation coefficient (R) in assessing the output of the prediction, the C-LSTM had the best prediction output. This study contributes to the advancement of accurate and efficient prediction of surface displacement of underground mines, ultimately enhancing and assisting safety operations.展开更多
The paper aims to identify a reasonable method for mining ultra-thick coal seams in an end-slope in surface mine, With a case study of Heidaigou surface coal mine(HSCM), the paper conducted a comparative research on t...The paper aims to identify a reasonable method for mining ultra-thick coal seams in an end-slope in surface mine, With a case study of Heidaigou surface coal mine(HSCM), the paper conducted a comparative research on three mining methods, namely Underground Mining Method(UMM), Highwall Mining System(HMS) and Local Steep Slope Mining Method(LSSMM). A model was firstly established to simulate the impact that UMM and HMS exert on monitoring points and surface deformation. The way that stripping and excavation amount varies with different slope angle, and the corresponding end slope stability were analyzed in the mode of LSSMM. Then a TOPSIS model was established by taking into account six indicators such as recovery ratio, technical complexity and adaptability, the impact on surface mining production, production safety and economic benefits. Finally, LSSMM was determined as the best mining method for mining ultra-thick coal seams in end slope in HSCM.展开更多
We studied underground pressure and its mechanism during back-gully mining in a shallow coal seam under a bedrock gully slope,by means of physical simulation,numerical modeling and field monitoring.The results show th...We studied underground pressure and its mechanism during back-gully mining in a shallow coal seam under a bedrock gully slope,by means of physical simulation,numerical modeling and field monitoring.The results show that the intensity of underground pressure is related to its relative position at the coalface.The underground pressure is intensive and the support resistance reaches a maximum when the coalface is at the bottom of the gully,whereas the underground pressure is moderate and decreases gradually when the coalface passes the gully.The mechanism of these changes is analyzed when the slope rotated in a reversed direction to the slope dip during back-gully mining and form an unstable,multilateral block hinged structure,due to slipping.The subsidence of multilateral blocks is considerable when the block fragmentation is small,resulting in enormous changes in the underground pressure.With an increase in the mass of the block body,the block displacement will be reduced in conjunction with an increased clamp effect by both the unbroken rocks and broken rocks in the goaf,resulting in a decrease of the underground pressure.展开更多
Based on the study of the slope with gently granular structure in Xingqiao open mine, a new safety cleaning bank mode for steep slope mining was developed, including setting up dint cut, and forming natural retaining ...Based on the study of the slope with gently granular structure in Xingqiao open mine, a new safety cleaning bank mode for steep slope mining was developed, including setting up dint cut, and forming natural retaining wall based on the character of gentle incline slope. It can effectively eliminate the impact of sliding body on the bottom working place and slope body, reduce the dilution of ore, keep rainwater from upper steps away, decrease influence of the weak intermediate layer, and cut cost of disposal waste rock. The safety and reliability of the mode were analyzed and verified from 3 aspects: static load calculation, ANSYS simulation of dynamic loading and spot experiment. The result of static loading calculation shows that the retaining wall can support accumulation and extrusion of granular body, and the glide or overturn disaster will not take place. The simulations of dynamic loading show that the retaining wall remains stable until sliding body collapses from 360 m (10 sublevels). Only one new safety cleaning bank in each 15 sublevels can fully meet the need of engineering. The new mode sustains steep slope (mining,) increases the angle of ultimate slope, and reduces invalid overburden amount of rock by 3%5%. The result of spot experiment has verified the exactness of the above calculations and simulations.展开更多
Two critical factors,namely intense precipitation and intricate excavation,can trigger rock mass disasters in mining operations.In this study,an indoor rainfall system was developed to precisely regulate the flow and ...Two critical factors,namely intense precipitation and intricate excavation,can trigger rock mass disasters in mining operations.In this study,an indoor rainfall system was developed to precisely regulate the flow and intensity of precipitation.A large-scale model experiment was conducted on a self-designed physical simulation experiment platform to investigate the failure and instability of high-steep rock slopes under unsaturated conditions.The real-time reproduction of the progressive failure process in high-steep rock slopes enabled the determination of the critical rainfall intensity and revealed the mechanism underlying slope instability.Experiment results indicated that rainfall may be the primary factor contributing to rock mass instability,while continuous pillar mining exacerbates the extent of rock mass failure.The critical failure stage of high-steep rock slopes occurs at a rainfall intensity of 40 mm/h,whereas a rainfall exceeding 50 mm can induce critical instability and precipitation reaching up to 60 mm will result in slope failure.The improved region growing segmentation method(IRGSM)was subsequently employed for image recognition of rock mass deformation in underground mines.Herein an error comparison with the simple linear iterative cluster(SLIC)superpixel method and the original region growing segmentation method(ORGSM)showed that the average identification error in the X and Y directions by the method was reduced significantly(1.82%and 1.80%in IRGSM;4.70%and 6.26%in SLIC;9.45%and 12.40%in ORGSM).Ultimately,the relationship between rainfall intensity and failure probability was analyzed using the Monte Carlo method.Moreover,the stability assessment criteria of rock slope under unsaturated condition were quantitatively and accurately evaluated.展开更多
Underground mining activities and rainfall have potential important influence on the initiation and reactivation of the slope deformations,especially on the steep rock slope. In this paper,using the discrete element m...Underground mining activities and rainfall have potential important influence on the initiation and reactivation of the slope deformations,especially on the steep rock slope. In this paper,using the discrete element method(UDEC),numerical simulation was carried out to investigate deformation features and the failure mechanism of the steep rock slope under mining activities and rainfall. A steep rock slope numerical model was created based on a case study at the Wulong area in Chongqing city,China. Mechanical parameters of the rock mass have been determined by situ measurements and laboratory measurements. A preliminary site monitoring system has been realized,aiming at getting structure movements and stresses of unstablerock masses at the most significant discontinuities. According to the numerical model calibrated based on the monitoring data,four types of operation conditions are designed to reveal the effect of mining excavation and extreme rainfall on the deformation of the steep rock slope.展开更多
文摘In view of the study on mining transferred from open-pit to underground, the research on the problem of the stabil- ity of slope is less. This article combined the actual situation of the Gaohai Coal Mine in Fuxin City and set up a three-dimensional model of the part of Huizhou open-pit slope by the finite difference software. Through the three-dimensional numerical simulation study of the influence on the stability of slope by underground mining, the basic characteristics of the open-pit slope deformation and the situation of basic stability were discussed. The simulation results of the mining slope of the displacement and deformation analysis of the state for mining provide a reference to the slope stability research.
基金Supported by the National Natural Science Foundation of China for Youth (51004065) the National Basic Research Program of China (2012CB724208)
文摘This paper will present a detailed analysis of the deformation mechanism and stability assessment of the slope through field investigations, numerical modeling and measurements. Field investigation indicated that three thin coal seams encountered large mined-out area at one side and free surface of hill slope at the other side, which lead to the caving of roof strata movement, ground movement and crown crack along the preferred orientations of joints. The three-dimensional numeri- cal modeling study on the case demonstrated that the plasticity failure occurred gradually along with the extension of mined-out area in depth. When the depth of mining reached the verge defined by the seismic prospecting method, a large mount of tension failure occurred on the crown of the slope. The factor of safety was 1.36 calculated by the shear strength reduction technique, which indicated the slope was in stable state. The measurement showed that the residual deformation occurred before 1998 and became stable subsequently, which indicated that the residual deformation almost finished and the slope is in stable state.
文摘Underground mining is an economically viable option for exploiting ore reserves deemed uneconomic after open pit mining. However, underground development can have adverse effects on the above existing open pit slope walls. As a goal of this paper, identification and assessment of potential slope instabilities prior to underground development is crucial for safe and sustainable mining. Towards goal achieving, this paper gives a comprehensive parametric study to investigate the influence of sublevel open stope (SLOS) underground mining on the surface and open pit slope walls. By means of numerical simulation, the SLOS design is tried against the existing open pit followed by adjustments of important slope parameters which are overall slope height (OSH) and overall slope angle (OSA). We found that underground mining may induce slope failure, particularly on the hangingwall side of the pit. Subsidence is prominent on the hanging wall and the surface, whereas, the uplift dominates the footwall and pit bottom. Pit wall closure is observed during underground mining. Although the assigned dimensions in the parametric study show a negligible effect of OSH and OSA, the high OSH experience low subsidence in comparison with low OSH. Overall, the results demonstrate that the slope walls on the hanging wall side are mostly affected by the underground mining and high-stress concentration prevails near slope toes and pit bottom. Additionally, slope deformation decrease from pit bottom towards the slope crest and surface. The results of this study add knowledge to open pit and underground mining interaction.
文摘Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized.
基金Projects(1004025,51174044,50934006)supported by the National Natural Science FoundationProject(2011AA060400)supported by the National High Technique Research and Development Program of ChinaProject(Sklgduek1113)supported by Funds of the State Key Laboratory for Geomechanics&Deep Underground Engineering,Chinese University of Mining and Technology,China
文摘Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equilibrium method. The calculation results present that the safety factors of pillars in Sections 19, 20, 24, 28 are less than 1.3, and those of unstable sections are identified preliminarily. Further, a numerical investigation in Sections 18, 20, 22, 24, 25 and 28 implemented with numerical code RFPA20 is employed to further validate the pillar performance and the stability of stopes. The numerical results show the pillars in Sections 18, 22 and 24 are stable and the designed pillar size is suitable. The width of the ore body near Section 28 averages 20 m, failure occurs in the left stope, but the boundary pillars near Section 28 maintain good performance. The pillars in Sections 20 and 25 are unstable which are mainly affected by the Faults F8 and F18. The existence of faults alters the stress distribution, failure mode and water inrush pathway. This work provides a meaningful standard for boundary pillar and stope design in a mine as it transitions from an open pit to underground.
基金Project (59704004) supported by the National Natural Science Foundation of ChinaProject (2000) supported by Foundation for University Key Teacher by the Ministry of Education
文摘The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put for-ward through analyzing the limitations of moving cone method under such conditions. With a view to recovering asmuch mineral resource as possible and making the maximum profit from the whole deposit, the new principle is tomaximize the sum of gain from both open-pit and underground mining. The mathematical models along the horizon-tal and vertical directions and modules for software package (DM&MCAD) have been developed and tested inTonglushan Copper Mine. It has been proved to be rather effective in the mining practice.
文摘The artificial neural network model which forecasts Open Mining Slope stability is established by neural network theory and method. The nonlinear reflection relation between stability target of open mining slope and its influence factor is described. The method of forecasting Open Mining Slope stability is brought forward.
基金Supported by the Natural Science Foundation of Shaanxi Province,China (SJ08D01)
文摘The basics of mining landslides were first summed up based on the analysis ofactual materials by the application of mining subsidence and landslide theories. Further,the mechanism of along-layer landslide by mining was studied with the example of theXiangshan mining landslide at Hancheng, Shaanxi Province. Meanwhile, the state ofstress, and the mechanism of deformation and destruction of the Xiangshan mining slopewere analyzed by the Finite Element Method.
文摘A mathematical model based on influence function method was established to predict the surface movement and deformation due to underground mining, and the impact on the upper hydraulic facilities in one coal mine was analyzed used the model. The analysis indicates: the maximum surface subsidence reaches 3.5 m, and the predicted maximum horizontal surface deformation reaches 7.0 mm/m, which would result in crack, deformation and uneven settlement in the soil foundation of the upper hydraulic facilities and influence the quality directly. Therefore, reasonable engineering measurements should be adopted to ensure the safe operation.
基金funded by the Sichuan Science and Technology Program (grant number 2022NSFSC1176)the open Fund for National Key Laboratory of Geological Disaster Prevention and Environmental Protection (grant number SKLGP2022K027)the State Key Laboratory of Geohazard Prevention and Geoenvironment Protection Independent Research Project (SKLGP2022Z001)。
文摘Repetitive mining beneath bedding slopes is identified as a critical factor in geomorphic disturbances, especially landslides and surface subsidence. Prior research has largely concentrated on surface deformation in plains due to multi-seam coal mining and the instability of natural bedding slopes, yet the cumulative impact of different mining sequences on bedding slopes has been less explored. This study combines drone surveys and geological data to construct a comprehensive three-dimensional model of bedding slopes. Utilizing FLAC3D and PFC2D models, derived from laboratory experiments, it simulates stress, deformation, and failure dynamics of slopes under various mining sequences. Incorporating fractal dimension analysis, the research evaluates the stability of slopes in relation to different mining sequences. The findings reveal that mining in an upslope direction minimizes disruption to overlying strata. Initiating extraction from lower segments increases tensile-shear stress in coal pillar overburdens, resulting in greater creep deformation towards the downslope than when starting from upper segments, potentially leading to localized landslides and widespread creep deformation in mined-out areas. The downslope upward mining sequence exhibits the least fractal dimensions, indicating minimal disturbance to both strata and surface. While all five mining scenarios maintain good slope stability under normal conditions, recalibrated stability assessments based on fractal dimensions suggest that downslope upward mining offers the highest stability under rainfall, contrasting with the lower stability and potential instability risks of upslope downward mining. These insights are pivotal for mining operations and geological hazard mitigation in multi-seam coal exploitation on bedding slopes.
基金the S&T project ‘‘High resolution microseismic monitoring for early detection and analysis of slope failure in opencast mines’’ funded by inistry of Coal,Government of IndiaThe Singareni Collieries Co Ltd (SCCL),Andhra Pradesh
文摘This paper outlines the results obtained from real time microseismic monitoring of an opencast coal mine in South India.The objective of the study is to investigate the stress changes within the rockmass along the slope due to underground mine development operation and their impact on the stability of the highwall slope.The installed microseismic systems recorded the seismic triggerings down toà2 moment magnitude.In general,most of the events recorded during the monitoring period are weak in seismic energy.The study adopts a simple and more reliable tool to characterize the seismically active zone for assessing the stability of the highwall in real time.The impact of underground working on the slope is studied on the basis of the seismic event impact contours and seismic clusters.During the monitoring period,it is observed that the intensity of the overall microseismic activity along the slope due to the mine development operations did not cause any adverse impact on the highwall stability.
文摘Slope failures are an inevitable aspect of economic pit slope designs in the mining industry.Large open pit guidelines and industry standards accept up to 30%of benches in open pits to collapse provided that they are controlled and that no personnel are at risk.Rigorous ground control measures including real time monitoring systems at TARP(trigger-action-response-plan)protocols are widely utilized to prevent personnel from being exposed to slope failure risks.Technology and computing capability are rapidly evolving.Aerial photogrammetry techniques using UAV(unmanned aerial vehicle)enable geotechnical engineers and engineering geologists to work faster and more safely by removing themselves from potential line-of-fire near unstable slopes.Slope stability modelling software using limit equilibrium(LE)and finite element(FE)methods in three dimensions(3D)is also becoming more accessible,user-friendly and faster to operate.These key components enable geotechnical engineers to undertake site investigations,develop geotechnical models and assess slope stability faster and in more detail with less exposure to fall of ground hazards in the field.This paper describes the rapid and robust process utilized at BHP Limited for appraising a slope failure at an iron ore mine site in the Pilbara region of Western Australia using a combination of UAV photogrammetry and 3D slope stability models in less than a shift(i.e.less than 12 h).
基金supported by a scholarship from the Peruvian Institute of Mining Engineers
文摘The geotechnical slope design of an open pit wall starts at the bench scale configuration.At this scale,the rock slope stability is governed primarily by the geological discontinuities within the rock mass and as a result,structurally-controlled failures(e.g.planar,wedge or toppling)are most likely to occur.The probabilistic approach offers a major advantage over the traditional deterministic method in that it accounts for the different degrees of variability and uncertainty often encountered in rock properties.This paper presents a bench slope stability assessment for an open pit mine in Peru using a probabilistic-based approach by coupling a kinematic analysis based on stereographic projection techniques followed by a kinetic analysis by means of the limit equilibrium method.Finally,these two probabilities are combined to provide an overall measure of the probability of failure(PoF)of the bench slope system.The case study is characterized by significant scatter in the geometrical and mechanical properties of the joints.Extensive surface mapping was conducted at 36 different sites following the ISRM suggested procedures.Several direct shear tests were carried out.It is shown that by combining field and laboratory measurements and engineering judgment,the probability density functions(PDF)of the discontinuity parameters can be obtained.These are then used in a Monte Carlo simulation process to compute both kinematic and kinetic probabilities of failure.The overall probability of failure aims to provide the design engineer with a tool to critically evaluate the bench performance from a geotechnical risk perspective and to provide a basis for future bench design optimization.
文摘In order to study the influence of depth-thickness ratio on bedding slope stability, whose sliding surface is flexural concave in shape under mining conditions, this paper aims to study the characteristics ofdeformarion and damage of bedding sliding with depth-thickness ratios of 200:1,150:1,120:1,100:1 and 50:1 by adopting numerical simulation analysis software combined with laboratory-made "under the influence of mining variable sliding surface slope similar simulation test bed", and to propose identification methods for slope stability under the infuence of mining. The results show that mining activities under the slope reduce slope stability. With a decrease in the mining depth ratio, the influence of mining on the slope increases gradually, and the damage to the slope gradually expands, the stability of the slope grad- ually reduces, fracture occurs on the slope toe and the central fissure gradually develops to the surface, and reaches slide threshold when the depth-thickness ratio is 50:1.
文摘Surface stability is essential in underground mines health management systems. Unexpected Surface displacement in underground mines could lead to loss of lives, injuries, and economic losses. To reduce or neutralise the adverse effects of surface displacement, it is vital to monitor and accurately predict them and unravel their mechanisms. In recent years, Convolutional Neural Network (CNN) and Long Short-Term Memory (LSTM) have proven effective in predicting complex problems. However, CNN neglects the dynamic dependency of the input in the temporal dimension, which affects surface displacement features. The Convolutional-LSTM model can dynamically learn the temporal dependency among input features via the feedback connections in the LSTM to improve accurate captures of surface displacement features. This study focused on evaluating the C-LSTM model in predicting surface displacement of underground mines and assessed the predictive capabilities and generalisation strength of using hybridised ANN models. Geodetic and geotechnical data gathered from a Gold Mine in Ghana was used. The three models were tested on experimental data collected at Monitoring Scan Point 3. It was observed from the prediction output that all the methods could provide applicable and practical results. However, using indicators like root mean square error (RMSE) and correlation coefficient (R) in assessing the output of the prediction, the C-LSTM had the best prediction output. This study contributes to the advancement of accurate and efficient prediction of surface displacement of underground mines, ultimately enhancing and assisting safety operations.
基金provided by the National Natural Science Foundation of China(No.90510002)the Science and Technology Research of the Ministry of Education of China(No.306008)
文摘The paper aims to identify a reasonable method for mining ultra-thick coal seams in an end-slope in surface mine, With a case study of Heidaigou surface coal mine(HSCM), the paper conducted a comparative research on three mining methods, namely Underground Mining Method(UMM), Highwall Mining System(HMS) and Local Steep Slope Mining Method(LSSMM). A model was firstly established to simulate the impact that UMM and HMS exert on monitoring points and surface deformation. The way that stripping and excavation amount varies with different slope angle, and the corresponding end slope stability were analyzed in the mode of LSSMM. Then a TOPSIS model was established by taking into account six indicators such as recovery ratio, technical complexity and adaptability, the impact on surface mining production, production safety and economic benefits. Finally, LSSMM was determined as the best mining method for mining ultra-thick coal seams in end slope in HSCM.
基金financial support for this work,provided by the National Natural Science Foundation of China(Nos.51004101 and 50904063)the Science Foundation for Young Scholars of China University of Mining & Technology(Nos.2008A003 and 2009A001 )the Graduate Student Scientific Research Innovation in the University of Jiangsu Province(No.CX07B_149z).
文摘We studied underground pressure and its mechanism during back-gully mining in a shallow coal seam under a bedrock gully slope,by means of physical simulation,numerical modeling and field monitoring.The results show that the intensity of underground pressure is related to its relative position at the coalface.The underground pressure is intensive and the support resistance reaches a maximum when the coalface is at the bottom of the gully,whereas the underground pressure is moderate and decreases gradually when the coalface passes the gully.The mechanism of these changes is analyzed when the slope rotated in a reversed direction to the slope dip during back-gully mining and form an unstable,multilateral block hinged structure,due to slipping.The subsidence of multilateral blocks is considerable when the block fragmentation is small,resulting in enormous changes in the underground pressure.With an increase in the mass of the block body,the block displacement will be reduced in conjunction with an increased clamp effect by both the unbroken rocks and broken rocks in the goaf,resulting in a decrease of the underground pressure.
文摘Based on the study of the slope with gently granular structure in Xingqiao open mine, a new safety cleaning bank mode for steep slope mining was developed, including setting up dint cut, and forming natural retaining wall based on the character of gentle incline slope. It can effectively eliminate the impact of sliding body on the bottom working place and slope body, reduce the dilution of ore, keep rainwater from upper steps away, decrease influence of the weak intermediate layer, and cut cost of disposal waste rock. The safety and reliability of the mode were analyzed and verified from 3 aspects: static load calculation, ANSYS simulation of dynamic loading and spot experiment. The result of static loading calculation shows that the retaining wall can support accumulation and extrusion of granular body, and the glide or overturn disaster will not take place. The simulations of dynamic loading show that the retaining wall remains stable until sliding body collapses from 360 m (10 sublevels). Only one new safety cleaning bank in each 15 sublevels can fully meet the need of engineering. The new mode sustains steep slope (mining,) increases the angle of ultimate slope, and reduces invalid overburden amount of rock by 3%5%. The result of spot experiment has verified the exactness of the above calculations and simulations.
基金the Research Fund of National Natural Science Foundation of China(NSFC)(No.42277154)the project supported by graduate research and innovation foundation of Chongqing,China(No.CYB22023)+3 种基金Guizhou Province Science and Technology Planning Project(No.Guizhou science and technology cooperation support[2022]common 229)National Natural Science Foundation of Shandong Province of China(NSFC)(No.ZR2022ME188)the State Key Laboratory of Coal Resources and Safe Mining,CUMT(No.SKLCRSM22KF009)Open Fund of National Engineering and Technology Research Center for Development and Utilization of Phosphate Resources of China(No.NECP 2022-04).
文摘Two critical factors,namely intense precipitation and intricate excavation,can trigger rock mass disasters in mining operations.In this study,an indoor rainfall system was developed to precisely regulate the flow and intensity of precipitation.A large-scale model experiment was conducted on a self-designed physical simulation experiment platform to investigate the failure and instability of high-steep rock slopes under unsaturated conditions.The real-time reproduction of the progressive failure process in high-steep rock slopes enabled the determination of the critical rainfall intensity and revealed the mechanism underlying slope instability.Experiment results indicated that rainfall may be the primary factor contributing to rock mass instability,while continuous pillar mining exacerbates the extent of rock mass failure.The critical failure stage of high-steep rock slopes occurs at a rainfall intensity of 40 mm/h,whereas a rainfall exceeding 50 mm can induce critical instability and precipitation reaching up to 60 mm will result in slope failure.The improved region growing segmentation method(IRGSM)was subsequently employed for image recognition of rock mass deformation in underground mines.Herein an error comparison with the simple linear iterative cluster(SLIC)superpixel method and the original region growing segmentation method(ORGSM)showed that the average identification error in the X and Y directions by the method was reduced significantly(1.82%and 1.80%in IRGSM;4.70%and 6.26%in SLIC;9.45%and 12.40%in ORGSM).Ultimately,the relationship between rainfall intensity and failure probability was analyzed using the Monte Carlo method.Moreover,the stability assessment criteria of rock slope under unsaturated condition were quantitatively and accurately evaluated.
基金financially supported by a grant from China Natural Science foundation (51379112,51422904)the National Program on Key Basic Research Project of China (973 Program)(2013CB036002)the National Natural Science Foundation of China (51309144)
文摘Underground mining activities and rainfall have potential important influence on the initiation and reactivation of the slope deformations,especially on the steep rock slope. In this paper,using the discrete element method(UDEC),numerical simulation was carried out to investigate deformation features and the failure mechanism of the steep rock slope under mining activities and rainfall. A steep rock slope numerical model was created based on a case study at the Wulong area in Chongqing city,China. Mechanical parameters of the rock mass have been determined by situ measurements and laboratory measurements. A preliminary site monitoring system has been realized,aiming at getting structure movements and stresses of unstablerock masses at the most significant discontinuities. According to the numerical model calibrated based on the monitoring data,four types of operation conditions are designed to reveal the effect of mining excavation and extreme rainfall on the deformation of the steep rock slope.