In a global environment where energy and labor are becoming increasingly expensive, continuous mining systems such as In-Pit Crushing and Conveying(IPCC) systems have been advanced as offering a real alternative to co...In a global environment where energy and labor are becoming increasingly expensive, continuous mining systems such as In-Pit Crushing and Conveying(IPCC) systems have been advanced as offering a real alternative to conventional truck haulage systems. The implementation of IPCC systems in hard rock operations in open pit mines however requires different and more comprehensive planning approaches in order to adequately reflect the practical aspects associated with these. This paper investigates the impact that these approaches may have on the implementation of IPCC systems on a basic metalliferous deposit amenable to open pit exploitation. A strategic life of mine plan to provide numerous economic indicators for each approach is analyzed and compared to traditional truck haulage systems. The mine planning and evaluation process highlights the increased overall resource recovery that may accompany the use of IPCC systems. This investigation also provides insights into the issues associated with IPCC and the scale and type of operation and orebody that is likely to provide a feasible alternative to truck haulage.展开更多
Accuracy in predictions leads to better planning with a minimum of opportunity lost. In open pit mining,the complexity of operations, coupled with a highly uncertain and dynamic production environment,limit the accura...Accuracy in predictions leads to better planning with a minimum of opportunity lost. In open pit mining,the complexity of operations, coupled with a highly uncertain and dynamic production environment,limit the accuracy of predictions and force a reactive planning approach to mitigate deviations from original plans. A simulation optimization framework/tool is presented in this paper to account for uncertainties in mining operations for robust short-term production planning and proactive decision making. This framework/tool uses a discrete event simulation model of mine operations, which interacts with a goalprogramming based mine operational optimization tool to develop an uncertainty based short-term schedule. Using scenario analysis, this framework allows the planner to make proactive decisions to achieve the mine's operational and long-term objectives. This paper details the development of simulation and optimization models and presents the implementation of the framework on an iron ore mine case study for verification through scenario analysis.展开更多
文摘In a global environment where energy and labor are becoming increasingly expensive, continuous mining systems such as In-Pit Crushing and Conveying(IPCC) systems have been advanced as offering a real alternative to conventional truck haulage systems. The implementation of IPCC systems in hard rock operations in open pit mines however requires different and more comprehensive planning approaches in order to adequately reflect the practical aspects associated with these. This paper investigates the impact that these approaches may have on the implementation of IPCC systems on a basic metalliferous deposit amenable to open pit exploitation. A strategic life of mine plan to provide numerous economic indicators for each approach is analyzed and compared to traditional truck haulage systems. The mine planning and evaluation process highlights the increased overall resource recovery that may accompany the use of IPCC systems. This investigation also provides insights into the issues associated with IPCC and the scale and type of operation and orebody that is likely to provide a feasible alternative to truck haulage.
基金part of a PhD research, which was supported by Mine Optimization Laboratory, University of Alberta-Canada
文摘Accuracy in predictions leads to better planning with a minimum of opportunity lost. In open pit mining,the complexity of operations, coupled with a highly uncertain and dynamic production environment,limit the accuracy of predictions and force a reactive planning approach to mitigate deviations from original plans. A simulation optimization framework/tool is presented in this paper to account for uncertainties in mining operations for robust short-term production planning and proactive decision making. This framework/tool uses a discrete event simulation model of mine operations, which interacts with a goalprogramming based mine operational optimization tool to develop an uncertainty based short-term schedule. Using scenario analysis, this framework allows the planner to make proactive decisions to achieve the mine's operational and long-term objectives. This paper details the development of simulation and optimization models and presents the implementation of the framework on an iron ore mine case study for verification through scenario analysis.