The occurrence of storm surge disaster is often accompanied with floodplain, overflow, dike breach and other complex phenomena, while current studies on storm surge flooding are more concentrated on the 1D/2D numerica...The occurrence of storm surge disaster is often accompanied with floodplain, overflow, dike breach and other complex phenomena, while current studies on storm surge flooding are more concentrated on the 1D/2D numerical simulation of single disaster scenario(floodplain, overflow or dike breach), ignoring the composite effects of various phenomena. Therefore, considering the uncertainty in the disaster process of storm surge, scenario analysis was firstly proposed to identify the composite disaster scenario including multiple phenomena by analyzing key driving forces, building scenario matrix and deducing situation logic. Secondly, by combining the advantages of k-ω and k-ε models in the wall treatment, a shear stress transmission k-ω model coupled with VOF was proposed to simulate the 3D flood routing for storm surge disaster. Thirdly, risk degree was introduced to make the risk analysis of storm surge disaster. Finally, based on the scenario analysis, four scenarios with different storm surge intensity(100-year and 200-year frequency) were identified in Tianjin Binhai New Area. Then, 3D numerical simulation and risk map were made for the case.展开更多
The use of engineering procurement construction (EPC) mode is currently a trend in hydropower engineering construction. The clarification of the internal relationship between hydropower EPC projects and the realizatio...The use of engineering procurement construction (EPC) mode is currently a trend in hydropower engineering construction. The clarification of the internal relationship between hydropower EPC projects and the realization of synergy has great significance in improving management efficiency and implementation effect. In this work, a three-dimensional system and a system model of hydropower EPC project management synergy are constructed. The mechanism and factors that influence the degree of management synergy are analyzed on the basis of management synergy theory. Furthermore, the evaluation index system and the degree of synergy model are established, and grey relational analysis is utilized to identify the key factors that affect the synergy degree. Thus, this study aims to facilitate the hydropower EPC project management synergy, provide a quantitative method for synergy degree evaluation, and propose corresponding promotion strategies. Results show that the order degree of each subsystem presents a steady upward trend. Specifically, the order degree of the subsystem at the trial operation stage is low, which is the major restriction on the further improvement of the synergy degree of EPC project management. The key factors in improving the synergy level of hydropower EPC project management are mainly concentrated in the information and organization synergy subsystems, including the construction degree of information platform, the performance of functions, the timeliness of information transfer, and the functions of the information platform.展开更多
基金Supported by the National Basic Research Program of China("973" Program,No.2013CB035906)Natural Science Foundation of Tianjin(No.JCYBJC19500)the Foundation of Innovative Research Groups of National Natural Science Foundation of China(No.51321065)
文摘The occurrence of storm surge disaster is often accompanied with floodplain, overflow, dike breach and other complex phenomena, while current studies on storm surge flooding are more concentrated on the 1D/2D numerical simulation of single disaster scenario(floodplain, overflow or dike breach), ignoring the composite effects of various phenomena. Therefore, considering the uncertainty in the disaster process of storm surge, scenario analysis was firstly proposed to identify the composite disaster scenario including multiple phenomena by analyzing key driving forces, building scenario matrix and deducing situation logic. Secondly, by combining the advantages of k-ω and k-ε models in the wall treatment, a shear stress transmission k-ω model coupled with VOF was proposed to simulate the 3D flood routing for storm surge disaster. Thirdly, risk degree was introduced to make the risk analysis of storm surge disaster. Finally, based on the scenario analysis, four scenarios with different storm surge intensity(100-year and 200-year frequency) were identified in Tianjin Binhai New Area. Then, 3D numerical simulation and risk map were made for the case.
基金This study has been partly supported by the National Natural Science Foundation of China(Grant No.71774132)the Major Program of Power China(Grant No.DJ-ZDZX2016-01-01)Shaanxi Water Conservancy Science and Technology Project(2018SLKJ-19).
文摘The use of engineering procurement construction (EPC) mode is currently a trend in hydropower engineering construction. The clarification of the internal relationship between hydropower EPC projects and the realization of synergy has great significance in improving management efficiency and implementation effect. In this work, a three-dimensional system and a system model of hydropower EPC project management synergy are constructed. The mechanism and factors that influence the degree of management synergy are analyzed on the basis of management synergy theory. Furthermore, the evaluation index system and the degree of synergy model are established, and grey relational analysis is utilized to identify the key factors that affect the synergy degree. Thus, this study aims to facilitate the hydropower EPC project management synergy, provide a quantitative method for synergy degree evaluation, and propose corresponding promotion strategies. Results show that the order degree of each subsystem presents a steady upward trend. Specifically, the order degree of the subsystem at the trial operation stage is low, which is the major restriction on the further improvement of the synergy degree of EPC project management. The key factors in improving the synergy level of hydropower EPC project management are mainly concentrated in the information and organization synergy subsystems, including the construction degree of information platform, the performance of functions, the timeliness of information transfer, and the functions of the information platform.