In order to improve the compatibility of laser-induced breakdown spectroscopy( LIBS) instrument for different types of parts and optimize the analysis and testing processes,a modularized automatic measurement and cont...In order to improve the compatibility of laser-induced breakdown spectroscopy( LIBS) instrument for different types of parts and optimize the analysis and testing processes,a modularized automatic measurement and control system was developed. Based on the characteristics of each LIBS component, the following development steps have been performed:( 1) a summary of characteristic parameters of the component are established;( 2) the integration mechanism of multiple electrical interfaces is designed;( 3) the component control instruction library is developed. The experimental results indicate that the measurement and control system is compatible with most LIBS parts in the market.Spectrometer and laser can be compatible with at least three different types of parts. In addition,a multilayer iterative testing process is designed to improve the efficiency of optimization process of LIBS parameters. The experimental results have shown that the automatic optimization of the delay time compared to the manual testing provides significant gain in testing efficiency. The range of delay time in the experiments is 1. 28 to 10. 28 μs and the step value is 1,0. 5,0. 2 and 0. 1 μs. The gain in testing efficiency has been found to be increased by 73. 76%,75. 93%,78. 81% and 80. 42%,respectively.展开更多
This paper considers a Manpower system where “exits” of employed personnel produce some wastage or loss. This system monitors these wastages over the sequence of exit epochs {t0 = 0 and tk;k = 1, 2,…} that form a r...This paper considers a Manpower system where “exits” of employed personnel produce some wastage or loss. This system monitors these wastages over the sequence of exit epochs {t0 = 0 and tk;k = 1, 2,…} that form a recurrent process and admit recruitment when the cumulative loss of man hours crosses a threshold level Y, which is also called the breakdown level. It is assumed that the inter-exit times Tk = tk-1 - tk, k = 1, 2,… are independent and identically distributed random variables with a common cumulative distribution function (CDF) B(t) = P(Tk t) which has a tail 1 – B(t) behaving like t-v with 1 v as t → ∞. The amounts {Xk} of wastages incurred during these inter-exit times {Tk} are independent and identically distributed random variables with CDF P(Xk X) = G(x) and Y is distributed, independently of {Xk} and {tk}, as an exponentiated exponential law with CDF H(y) = P(Y y) = (1 - e-λy)n. The mean waiting time to break down of the system has been obtained assuming B(t) to be heavy tailed and as well as light tailed. For the exponential case of G(x), a comparative study has also been made between heavy tailed mean waiting time to break down and light tailed mean waiting time to break down values. The recruitment policy operating under the heavy tailed case is shown to be more economical in all types of manpower systems.展开更多
基金Acknowledgements: This work was partially supported by China National Social Science Foundation (No. 08BYY046), Social Science Foundation of Chinese Ministry of Education (No. 06JJD740007) and Project of Shandong Social Science Fund (No. 07CWXJ03).
基金National M ajor Scientific Instruments and Equipment Development Special Funds,China(No.2011YQ030113)
文摘In order to improve the compatibility of laser-induced breakdown spectroscopy( LIBS) instrument for different types of parts and optimize the analysis and testing processes,a modularized automatic measurement and control system was developed. Based on the characteristics of each LIBS component, the following development steps have been performed:( 1) a summary of characteristic parameters of the component are established;( 2) the integration mechanism of multiple electrical interfaces is designed;( 3) the component control instruction library is developed. The experimental results indicate that the measurement and control system is compatible with most LIBS parts in the market.Spectrometer and laser can be compatible with at least three different types of parts. In addition,a multilayer iterative testing process is designed to improve the efficiency of optimization process of LIBS parameters. The experimental results have shown that the automatic optimization of the delay time compared to the manual testing provides significant gain in testing efficiency. The range of delay time in the experiments is 1. 28 to 10. 28 μs and the step value is 1,0. 5,0. 2 and 0. 1 μs. The gain in testing efficiency has been found to be increased by 73. 76%,75. 93%,78. 81% and 80. 42%,respectively.
文摘This paper considers a Manpower system where “exits” of employed personnel produce some wastage or loss. This system monitors these wastages over the sequence of exit epochs {t0 = 0 and tk;k = 1, 2,…} that form a recurrent process and admit recruitment when the cumulative loss of man hours crosses a threshold level Y, which is also called the breakdown level. It is assumed that the inter-exit times Tk = tk-1 - tk, k = 1, 2,… are independent and identically distributed random variables with a common cumulative distribution function (CDF) B(t) = P(Tk t) which has a tail 1 – B(t) behaving like t-v with 1 v as t → ∞. The amounts {Xk} of wastages incurred during these inter-exit times {Tk} are independent and identically distributed random variables with CDF P(Xk X) = G(x) and Y is distributed, independently of {Xk} and {tk}, as an exponentiated exponential law with CDF H(y) = P(Y y) = (1 - e-λy)n. The mean waiting time to break down of the system has been obtained assuming B(t) to be heavy tailed and as well as light tailed. For the exponential case of G(x), a comparative study has also been made between heavy tailed mean waiting time to break down and light tailed mean waiting time to break down values. The recruitment policy operating under the heavy tailed case is shown to be more economical in all types of manpower systems.