期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
RESEARCH ON THE CONDITION TO SET A TAILRACE SURGE TANK 被引量:6
1
作者 ZHAOGui-lian YANGjian-dong +1 位作者 XUYuan-jie LIJin-ping 《Journal of Hydrodynamics》 SCIE EI CSCD 2004年第4期486-491,共6页
When using the draft-tube vacuum to be less than 8.0 m as the rule to set atailrace surge tank, a mixing function that describes the process of water-hammer vacuum andvelocity-head vacuum varied with time is proposed,... When using the draft-tube vacuum to be less than 8.0 m as the rule to set atailrace surge tank, a mixing function that describes the process of water-hammer vacuum andvelocity-head vacuum varied with time is proposed, on the assumption that the guide vane of thehydraulic turbine and the turbine discharge were all changed linearly. An exact maximum of thedraft-tube vacuum for the first-phase water-hammer and the last-phase water-hammer is obtained.Finally a much more reasonable formula of critical tailrace length is derived. The results of twocases show that the formula proposed can determine correctly and reasonably whether a tail-racesurge tank is needed or not, and are more suitable for project design than the formula suggested bythe specification. 展开更多
关键词 water-column separation tailrace surge tank critical tailrace length first-phase water hammer last-phase water hammer
原文传递
Transient air-water flow patterns in the vent tube in hydropower tailrace system simulated by 1-D-3-D coupling method 被引量:3
2
作者 王希晨 张健 +1 位作者 俞晓东 陈胜 《Journal of Hydrodynamics》 SCIE EI CSCD 2018年第4期715-721,共7页
The vent tube is commonly used for the water hammer protection in the hydropower tailrace system. In transient processes, with air entering and exiting the vent tube, one sees complex hydraulic phenomena, which threat... The vent tube is commonly used for the water hammer protection in the hydropower tailrace system. In transient processes, with air entering and exiting the vent tube, one sees complex hydraulic phenomena, which threaten the station's safe operation. It is necessary to investigate the transient mechanisms in the tailrace system with vent tube. In this paper, a 3-D, two-phase numerical model of a vent tube on the connection of the tailrace tunnel and the diversion tunnel, is developed based on the FLUENT with the volume of fluid(VOF) algorithm to investigate the transient air-water flow patterns and the complex hydraulic phenomena in the vent tube of the tailrace system. A 1-D and 3-D unidirectional adjacent coupling(1-D-3-D-UAC) approach with a linear interpolation method is adopted to adjust the timesteps between the 1-D model and the 3-D model on the tunnel inlet and outlet boundaries through the user defined function(UDF), to transmit the data from the 1-D model to the 3-D model. The model is verified by comparing the results obtained by using the 1-D model alone and from the experiments in literature. The transient flow processes under the full load rejection consist of four stages: the water level dropping stage, the air entering stage, the air pocket collapsing stage, and the air exiting stage. Detailed hydraulic phenomena in the air pocket collapsing process are also discussed. 展开更多
关键词 Vent tube tailrace tunnel two phase volume of fluid (VOF) 1-D-3-D coupling
原文传递
Key Technologies of the Hydraulic Structures of the Three Gorges Project 被引量:5
3
作者 马洪琪 迟福东 《Engineering》 SCIE EI 2016年第3期340-349,共10页
To date,the Three Gorges Project is the largest hydro junction in the world.It is the key project for the integrated water resource management and development of the Changjiang River.The technology of the project,with... To date,the Three Gorges Project is the largest hydro junction in the world.It is the key project for the integrated water resource management and development of the Changjiang River.The technology of the project,with its huge scale and comprehensive benefits,is extremely complicated,and the design difficulty is greater than that of any other hydro project in the world.A series of new design theories and methods have been proposed and applied in the design and research process.Many key technological problems regarding hydraulic structures have been overcome,such as a gravity dam with multi-layer large discharge orifices,a hydropower station of giant generating units,and a giant continual multi-step ship lock with a high water head. 展开更多
关键词 Three Gorges Project Large orifice gravity dam Penstock on dam downstream surface tailrace tunnel with sloping ceiling Stable archFully lined ship lock
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部