Floods are both risks and resources. Floodwater utilization is an important part of flood management. Considering the rising shortage of water resources, serious water pollution, and undersupply of electric power, it...Floods are both risks and resources. Floodwater utilization is an important part of flood management. Considering the rising shortage of water resources, serious water pollution, and undersupply of electric power, it’s imperative to strengthen flood management. In light of the hydrological characteristics of the Three Gorges Project (TGP) on the Yangtze River in P. R. China, we investigated the necessity and feasibility of TGP floodwater utilization, proprosed dynamic control of limited water level during flood season of the reservoir and basin-wide integrated floodwater management as strategies, and identified problems that might occur in practice.展开更多
Natural and geological environmental conditions have an important impact on the planning and construction of sponge cities.This paper analyzes geological factors that influence the usage of natural sponge bodies,takin...Natural and geological environmental conditions have an important impact on the planning and construction of sponge cities.This paper analyzes geological factors that influence the usage of natural sponge bodies,taking the Shuanghe lake district of Zhengzhou airport zone as an example.An evaluation system with seven factors has been established and the weights of these factors are determined using the analytic hierarchy process(AHP)method.Overlay analysis is then carried out on all factors using GIS to evaluate the geological suitability of the construction of the sponge city.The results show that geologically suitable area for city construction in Shuanghe lake district accounts for 12.3%,relatively suitable area accounts for 76.1%,and relatively unsuitable area accounts for 11.6%.For suitable and relatively suitable areas,we should make full use of the advantages of surface infiltration,vadose zone transportation and aquifer storage to build a sponge city infrastructure with geological engineering as the main component,supplemented by engineering measures such as surface water storage and drainage,and jointly establish a sustainable urban hydrological cycle.For less suitable areas,artificial rain and flood control works,such as roof garden,should be considered.The findings of this paper can serve as an important reference for sponge city planning and construction not only in the research area but also in other regions with similar geological conditions.展开更多
It is of great significance to study the encounter possibility of typhoon and plum rain in the Taihu Lake Basin in order to adjust the schemes of design storm and utilize flood resource and make the decision of real-t...It is of great significance to study the encounter possibility of typhoon and plum rain in the Taihu Lake Basin in order to adjust the schemes of design storm and utilize flood resource and make the decision of real-time scheduling for flood control in the Basin. Based upon the existing research findings of description of encounter phenomena of typhoon and plum rain, the initial time of typhoon affecting the Taihu Lake Basin, the start time of plum rain season and the end time of plum rain season were selected as the characteristic indices of typhoon and plum rain, respectively. According to their synchronous data from 1954 to 2009, the distribution functions of the above-mentioned three random variables were identified and a formula expressing the encounter possibility of typhoon and plum rain was derived. In view of the complexity and solution of this formula, joint distribution functions of typhoon and plum rain were constructed by the use of Gumbel Copula function on the basis of the adaptability comparison among three functions (Gumbel Copula, Clayton Copula and Frank Copula) in Archimedean functions. For the characteristics of the formula with the joint distribution functions based on Gumbel Copula function, two methods, i.e., numerical integration and Monte Carlo simulation, were selected to solve the encounter probability, and the validity of the computed results was analyzed finally.展开更多
基金Funded by National Key Technologies R&D Program (2008BAB29B09)Open Foundation of State Key Laboratory of Water Resources and Hydropower Engineering Science (2007C017)China Postdoctoral Science Foundation (20080440956)
文摘Floods are both risks and resources. Floodwater utilization is an important part of flood management. Considering the rising shortage of water resources, serious water pollution, and undersupply of electric power, it’s imperative to strengthen flood management. In light of the hydrological characteristics of the Three Gorges Project (TGP) on the Yangtze River in P. R. China, we investigated the necessity and feasibility of TGP floodwater utilization, proprosed dynamic control of limited water level during flood season of the reservoir and basin-wide integrated floodwater management as strategies, and identified problems that might occur in practice.
基金supported by China Geological Survey project“Monitoring and evaluation of resources and environment bearing capacity in Beijing-Tianjin-Hebei Coordinated Development Region and xiong’an New Area”(DD20221727),“Engineering Geological and Soil&Water Quality Survey of Xiong’an New Area”(DD20189122)a multi-factor municipal geological survey project in Zhengzhou City:Evaluation of geological conditions for sponge city construction in Zhengzhou City(Zhengzhou financial bids for procurement-2021-217)。
文摘Natural and geological environmental conditions have an important impact on the planning and construction of sponge cities.This paper analyzes geological factors that influence the usage of natural sponge bodies,taking the Shuanghe lake district of Zhengzhou airport zone as an example.An evaluation system with seven factors has been established and the weights of these factors are determined using the analytic hierarchy process(AHP)method.Overlay analysis is then carried out on all factors using GIS to evaluate the geological suitability of the construction of the sponge city.The results show that geologically suitable area for city construction in Shuanghe lake district accounts for 12.3%,relatively suitable area accounts for 76.1%,and relatively unsuitable area accounts for 11.6%.For suitable and relatively suitable areas,we should make full use of the advantages of surface infiltration,vadose zone transportation and aquifer storage to build a sponge city infrastructure with geological engineering as the main component,supplemented by engineering measures such as surface water storage and drainage,and jointly establish a sustainable urban hydrological cycle.For less suitable areas,artificial rain and flood control works,such as roof garden,should be considered.The findings of this paper can serve as an important reference for sponge city planning and construction not only in the research area but also in other regions with similar geological conditions.
基金supported by the National Natural Science Foundation of China (Grant Nos. 50909063 and 51079037)Modern Water Science and Technology Innovation Project (Grant No. XDS2007-04)Non-Profit Special Industry Research Project both funded by the Ministry Water Resources of China (Grant Nos. 200901044 and 200901030)
文摘It is of great significance to study the encounter possibility of typhoon and plum rain in the Taihu Lake Basin in order to adjust the schemes of design storm and utilize flood resource and make the decision of real-time scheduling for flood control in the Basin. Based upon the existing research findings of description of encounter phenomena of typhoon and plum rain, the initial time of typhoon affecting the Taihu Lake Basin, the start time of plum rain season and the end time of plum rain season were selected as the characteristic indices of typhoon and plum rain, respectively. According to their synchronous data from 1954 to 2009, the distribution functions of the above-mentioned three random variables were identified and a formula expressing the encounter possibility of typhoon and plum rain was derived. In view of the complexity and solution of this formula, joint distribution functions of typhoon and plum rain were constructed by the use of Gumbel Copula function on the basis of the adaptability comparison among three functions (Gumbel Copula, Clayton Copula and Frank Copula) in Archimedean functions. For the characteristics of the formula with the joint distribution functions based on Gumbel Copula function, two methods, i.e., numerical integration and Monte Carlo simulation, were selected to solve the encounter probability, and the validity of the computed results was analyzed finally.