Spring consecutive rainfall events(CREs) are key triggers of geological hazards in the Three Gorges Reservoir area(TGR), China. However, previous projections of CREs based on the direct outputs of global climate model...Spring consecutive rainfall events(CREs) are key triggers of geological hazards in the Three Gorges Reservoir area(TGR), China. However, previous projections of CREs based on the direct outputs of global climate models(GCMs) are subject to considerable uncertainties, largely caused by their coarse resolution. This study applies a triple-nested WRF(Weather Research and Forecasting) model dynamical downscaling, driven by a GCM, MIROC6(Model for Interdisciplinary Research on Climate, version 6), to improve the historical simulation and reduce the uncertainties in the future projection of CREs in the TGR. Results indicate that WRF has better performances in reproducing the observed rainfall in terms of the daily probability distribution, monthly evolution and duration of rainfall events, demonstrating the ability of WRF in simulating CREs. Thus, the triple-nested WRF is applied to project the future changes of CREs under the middle-of-the-road and fossil-fueled development scenarios. It is indicated that light and moderate rainfall and the duration of continuous rainfall spells will decrease in the TGR, leading to a decrease in the frequency of CREs. Meanwhile, the duration, rainfall amount, and intensity of CREs is projected to regional increase in the central-west TGR. These results are inconsistent with the raw projection of MIROC6. Observational diagnosis implies that CREs are mainly contributed by the vertical moisture advection. Such a synoptic contribution is captured well by WRF, which is not the case in MIROC6,indicating larger uncertainties in the CREs projected by MIROC6.展开更多
As a national cultural property,General Zhang Fei’s Temple is the largest ancient architectural complex in the Three Gorges of the Yangtze River.It was built in the Han Dynasty and has a long history of nearly 2,000 ...As a national cultural property,General Zhang Fei’s Temple is the largest ancient architectural complex in the Three Gorges of the Yangtze River.It was built in the Han Dynasty and has a long history of nearly 2,000 years.In 1994,the Chinese government launched the Three Gorges Dam project at the Yangtze River and implemented the largest relocation project for the General Zhang Fei Temple to prevent it from being submerged.The temple was relocated 32 kilometers upstream along with the local people of Yunyang County,and the historic environment was rebuilt on the opposite side of the migrant city of New Yunyang County.The temple was restored successfully and the tradition of offering sacrifices to General Zhang Fei continued in the local community.The relocation project lasted for 8 years and became the largest cultural heritage conservation project of the People’s Republic of China at the end of the 20th century.This paper comprehensively summarizes and reviews the project goals,implementation process,and project highlights of this relocation,so as to provide an important case reference for heritage conservation projects in the future.展开更多
China Yangtze TGP is a particularly giant hydro development project in the world, with an enormous scale and complex technology. Seventy years project planning, verification and decision making and ten years const...China Yangtze TGP is a particularly giant hydro development project in the world, with an enormous scale and complex technology. Seventy years project planning, verification and decision making and ten years construction work demonstrate that not only great progress has been made within the projects implementation stage, but most of the conclusions from the verifications and decisions are correct as well. Some problems like sedimentation, environment and resettlement are still waiting to be proven in the actual operation of the project. This paper provides a brief introduction to the decision making and practice on TGP.展开更多
Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigatio...Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward.展开更多
The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation...The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation in June 2003. The side slopes of the ship lock are characterized by great height(170 m), steepness (70 m in height of upright slope), and great length (over 7000 m in total length). Inassociation with the ship lock, the surrounding rocks in slope have a high potential to deform, withwhich the magnitude of deformation is restricted. Monitoring results show that the deformation of thefive-step ship lock high slopes of the TGP primarily occurred in excavation period, and deformationtended to be stable and convergent during operation period, suggesting the allowable ranges of deformation.At present, the slopes and lock chambers are stable, and the ship lock works well under normaloperation condition, enabling the social and economic benefits of the TGP. 2015 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting byElsevier B.V. All rights reserved.展开更多
Seismic monitoring data for the past 50 years in the Three Gorges Reservoir area show that the reservoir head area is a typical weak seismic region with low seismieity before impoundment and that the epicenters were c...Seismic monitoring data for the past 50 years in the Three Gorges Reservoir area show that the reservoir head area is a typical weak seismic region with low seismieity before impoundment and that the epicenters were concentrated in the east and west sides of the Zigui Basin, most of which were natural tectonic earth- quakes. After impoundment, the seismic activity shifted to the segment between Badong and Zigui along the Yangtze River, mainly within 5 km of the reservoir bank. The seismogenesis was categorized into four types: Karst collapse earthquakes, earthquakes caused by Karst gas explosion, mining tunnel collapse earthquakes, and rock (terrane) slip earthquakes, all of which are related to the lithology, structure, and tectonics of near- surface geological bodies of the area. Compared with the seismicity before impoundment, the seismic frequency increase was remarkable, with most of the magnitudes below Ms2.0. Therefore, the intensity of the earth- quakes remained at a low level. On November 22, 2008, a magnitude 4.1 earthquake, the largest earthquake recorded since impoundment, occurred in Quyuan Town, Zigui County. The intensity and PGA of reservoir-in- duced earthquakes are higher than those of tectonic earthquakes with equal magnitude, but the peak intensity of reservoir-induced earthquakes is not likely to go beyond that of the estimated range from earlier studies.展开更多
The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River. The project includes a river-crossing dam, underground powerhouses, and navigati...The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River. The project includes a river-crossing dam, underground powerhouses, and navigation structures. Because of the huge size and complicated construction technologies, the project faced a series of challenging engineering issues. In terms of rock mechanics, there are many key technical issues, including the sliding resistance and stability of the dam section along the foundations of powerhouses No.l-5, the ,,;lope stability of the double-line five-stage shiplock, excavation of large-scale underground powerhouses, and curtain grouting under the dam. With decades of scientific research and 16 years of practical construction experiences and reservoir operations, these key technical issues in construction of the Three Gorges Project are successfully resolved, which will attribute to the development of hydropower technology. On the basis of the monitoring data during construction and normal operation periods of the Three Gorges Project, this paper presents a systematic analysis of these key rock mechanical issues in terms of behaviors, solutions, dynamic controlling, monitoring arrangement and integrated assessment.展开更多
The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the s...The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the shoal-channel evolution over different seasons since the completion of the TGP.Based on analysis of the measured data and the results of a two-dimensional mathematical model,the changes of the river regime and river bed evolution in the Yaojian reach downstream of the TGP were studied.Results show that a high sediment transport flux helps to keep the main flow in the North Branch,while a low sediment transport flux helps to keep the main flow in the South Branch.Thus,the main branch will not change in the near future because of the low sediment transport load.In this study,the flow-sediment process adjusted by the TGP was restored to the conditions before the TGP,and the river bed evolution under the adjusted and non-adjusted flow-sediment conditions was calculated.After the completion of the TGP,the reservoir storage accelerated the flood recession process and decreased the erosion by 11.9%under the flow-sediment conditions in 2010,and the deposition in the flood season decreased by 56.4%.展开更多
To date,the Three Gorges Project is the largest hydro junction in the world.It is the key project for the integrated water resource management and development of the Changjiang River.The technology of the project,with...To date,the Three Gorges Project is the largest hydro junction in the world.It is the key project for the integrated water resource management and development of the Changjiang River.The technology of the project,with its huge scale and comprehensive benefits,is extremely complicated,and the design difficulty is greater than that of any other hydro project in the world.A series of new design theories and methods have been proposed and applied in the design and research process.Many key technological problems regarding hydraulic structures have been overcome,such as a gravity dam with multi-layer large discharge orifices,a hydropower station of giant generating units,and a giant continual multi-step ship lock with a high water head.展开更多
The proposed hydroelectric project on the Yangtze Gorges will be one of the largest power stations in the world.The problem of induced seismicity to the project has attracted much attention throughout China and the wo...The proposed hydroelectric project on the Yangtze Gorges will be one of the largest power stations in the world.The problem of induced seismicity to the project has attracted much attention throughout China and the world.A research program has been carried out by the State Seismological Bureau of China.Based on the size of the reservoir and the lithology,geological structure,permeability,stress state,and previous seismicity in the region,the potential risk of reservoir-induced seismicity has been estimated.The results suggest that,after impoundment in the reservoir area,the possibility of induced seismicity cannot be completely ruled out.The areas with potential risk may be in some gorges composed of karstified carbonate and plutonic granite around the dam site.However,the magnitude is expected to be limited owing to the small dimension of the induced seismogenic faults.展开更多
The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-sca...The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of Three Gorges Project (TGP) are introduced.Since the operation of ship-lock in 2003,the operation practice has proved that the design techniques are advanced,rational and reliable.The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects,which makes the construction technology of ship-lock in the world reach a new level.展开更多
The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems...The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock.展开更多
The Three Gorges Project attracts worldwide attention because of the Three Gorges migrants, and the agriculture of the Three Gorges Reservoir Area is a foundation for the development of the Three Gorges migrants. The ...The Three Gorges Project attracts worldwide attention because of the Three Gorges migrants, and the agriculture of the Three Gorges Reservoir Area is a foundation for the development of the Three Gorges migrants. The Three Gorges Reservoir Area is situated at the mountainous area with bad agricultural development conditions and relatively low levels of development. As a result, the large-scale migration fias special influence on its agricultural development, which has attracted much attention. The paper analyzes influence that the migrants have forced on its agricultural development based on the scientific data, and makes some explorations on the models that are suitable for the development of mountainous agriculture in the Three Gorges Reservoir Area.展开更多
The construction of the Three Gorges Reservoir and the resettlement project have caused increasing contradictions between human and land,and led to the deterioration of the ecological environment. In order to ameliora...The construction of the Three Gorges Reservoir and the resettlement project have caused increasing contradictions between human and land,and led to the deterioration of the ecological environment. In order to ameliorate ecological environment of the Three Gorges Area, the government carried out several ecological restoration projects to improve the vegetation coverage from 1990 s. This paper aims to quantitatively analyze the impact of ecological projects on the vegetation in the Three Gorges Area of Chongqing, China. Landsat and MODIS data from 1992 to 2015 were used to estimate vegetation coverage. In addition, the land cover data of the European Space Agency(ESA) was used to explore the impact of ecological projects on land cover change. The cropland accounted for about 62% and the forestland accounted for about 34% of the total area. There was more than 90% of the study area covered with high or very high vegetation coverage.From 1992 to 2015, a total of 272.7 km;croplands were converted into forestland in the Ecological Migration Project(EMP), 795.6 km;in the Grain for Green Project(GGP), and 13.77 km;in the Ecological Restoration Zone Project(ERZP). Among the three projects, the GGP was the most powerful measure,with a contribution rate of 1.6%. The implementation of the ecological projects improved vegetation coverage, which indicated that the ecological projects measures were effective in ecological restoration.展开更多
This paper establishes a 3D numerical model for 15# hydropower house of the Three Gorges Project (TGP) and performs a nonlinear static and dynamic damage analysis. In this numerical model, a coupling model of finite a...This paper establishes a 3D numerical model for 15# hydropower house of the Three Gorges Project (TGP) and performs a nonlinear static and dynamic damage analysis. In this numerical model, a coupling model of finite and infinite elements for simulating infinite foundation of hydropower station is adopted. A plastic-damage model based on continuum damage mechanics, which includes the softening and damage behavior under tension is considered for the concrete material. The dynamic equilibrium equations of moti...展开更多
The construction of Three Gorges Project (TGP) is characterized by large construction scale,high construction intensity and complexity in technology.In view of various technical difficulties such as navigation in cons...The construction of Three Gorges Project (TGP) is characterized by large construction scale,high construction intensity and complexity in technology.In view of various technical difficulties such as navigation in construction period,two river closures,high-intensity concrete and earth-rock construction,high-intensity construction and demolition of RCC (roller compacted concrete) cofferdam in stage III and immediate navigation of double-line five-step shiplock after impoundment of reservoir,the scheme of river diversion during construction is adopted,namely "diversion in 3 stages,open channel navigation and cofferdam power generation".The practice and innovation achievements in river diversion during construction as well as earth-rock and concrete construction are presented emphatically.展开更多
The pinion bracket-assembly(PBA) is a major part of three gorges project(TGP) ship lift drive system. The static strength,fatigue strength and stress distribution of hinge pin of PBA were analyzed by ANSYS, and the st...The pinion bracket-assembly(PBA) is a major part of three gorges project(TGP) ship lift drive system. The static strength,fatigue strength and stress distribution of hinge pin of PBA were analyzed by ANSYS, and the structure of PBA was optimized. The results show that after the optimization, the maximum comprehensive stress is 259.59 MPa, the maximum fatigue cumulative damage of weld joints is 0.94 and the maximum vertical deformation of hinge pin is 0.14 mm. The elastic deformation, hydropneumatic spring cylinder(HSC) load response and the vibration characteristics of PBA were studied by the bearing test when PBA bore the load caused by different water level errors. The results indicate that when the water level of ship chamber ranges from 3.4 m to 3.6 m,the vertical elastic deformation of the pinion shaft is between-8.58 and 10.50 mm. When upward outage-load(1580 k N) is imposed by the test-rack, the vertical elastic deformation of the pinion shaft is 13.42 and 14.07 mm and HSC load response is 795.80-800.80 k N. In the process of imposing load on the pinion by the test-rack, the maximum vibration amplitude and acceleration of PBA internal components are 0.37° and 2.67 rad/s2, respectively; the maximum impact on the pin caused by vibration is 19.89 k N; the pinion shaft vertical displacement and HSC load response do not fluctuate. There is a great difference between the frequency of meshing force of the pinion and the rack(1.06 Hz) and first-order natural frequency of PBA(8.41 Hz), thus PBA will not resonate.From all above, PBA meets the static strength and fatigue strength requirements. The vibration of PBA internal components has no effect on the vertical displacement of the pinion shaft, HSC load response and smooth operation of PBA. There is a liner relationship in the ratio of 2:1 between the thrust imposed by the test-rack and HSC load, thus HSC can limit the load imposed on the pinion.展开更多
The outbreak of Yantze vole ( Microtus fortis) population in Dongting Lake region is closely related to the evolvement of lake beaches,because the deposition of lake sediments results in the expansion of lake beaches,...The outbreak of Yantze vole ( Microtus fortis) population in Dongting Lake region is closely related to the evolvement of lake beaches,because the deposition of lake sediments results in the expansion of lake beaches,which provides the possibility of the increase of the vole's population. Reclaiming farmland from lake via building cofferdams,eliminating snails by building cofferdams for eradicating schistosomiasis,and over-hunting predators in the region cause the voles becoming a pest after the 1970s. In recent years,the Three Gorges Project and the conversion from farmland into lake have had deep impacts on the environment in the lake region. The dispatching of the down flow rate by the project has induced the expansion of the low and medium level beaches in the lake region,while converting farmland into lake directly has induced the expansion of the lake beaches,both of which have expanded the potential habitats of the vole's population. Therefore,more attention should be paid to the quantitative variation trend of the vole's population in the future.展开更多
Fertile topsoil was added onto the surface of barren slope land in Three Gorges Reservoir region of China in an anthropogenic process known as the foreign soil reconstruction project. The main goal of this paper was t...Fertile topsoil was added onto the surface of barren slope land in Three Gorges Reservoir region of China in an anthropogenic process known as the foreign soil reconstruction project. The main goal of this paper was to reveal the influence of anthropogenic activities on pedogenic processes and soil classifications. Chemical weathering indices and comparative analysis were applied to discuss changes in geochemical compositions and weathering features of purplish soils(Cambisols) before and after the project. Results showed that:(1) The foreign soil reconstruction project slightly altered the major element composition of topsoil and improved the soil structure. Although the distributions of major elements in the original topsoil, original subsoil, foreign topsoil and newly constructed topsoil were all similar to that in upper continental crust, newly constructed topsoil was the most similar soil.(2) The chemical index of alteration was more sensitive than the weathering index of Parker at indicating chemical weathering status of purplish soil. The chemical weathering status of newly constructed topsoil was higher than that of the original topsoil and lower than that of foreign topsoil.(3) Anthropogenic activities may provide a promising new thought for the anthropogenic soil classification system. The scope and subgroups of Anthrosols should be extended and strengthened. Or there may be a need to combine Anthrosols and Technosols orders to create a new soil order. The results may be used for optimizing soil mellowing engineering activities and enriching the soil classification system.展开更多
基金funding from the NFR COMBINED (Grant No.328935)The BCPU hosted YZ visit to University of Bergen (Trond Mohn Foundation Grant No.BFS2018TMT01)+2 种基金supported by the National Key Research and Development Program of China (Grant No.2023YFA0805101)the National Natural Science Foundation of China (Grant Nos.42376250 and 41731177)a China Scholarship Council fellowship and the UTFORSK Partnership Program (CONNECTED UTF-2016-long-term/10030)。
文摘Spring consecutive rainfall events(CREs) are key triggers of geological hazards in the Three Gorges Reservoir area(TGR), China. However, previous projections of CREs based on the direct outputs of global climate models(GCMs) are subject to considerable uncertainties, largely caused by their coarse resolution. This study applies a triple-nested WRF(Weather Research and Forecasting) model dynamical downscaling, driven by a GCM, MIROC6(Model for Interdisciplinary Research on Climate, version 6), to improve the historical simulation and reduce the uncertainties in the future projection of CREs in the TGR. Results indicate that WRF has better performances in reproducing the observed rainfall in terms of the daily probability distribution, monthly evolution and duration of rainfall events, demonstrating the ability of WRF in simulating CREs. Thus, the triple-nested WRF is applied to project the future changes of CREs under the middle-of-the-road and fossil-fueled development scenarios. It is indicated that light and moderate rainfall and the duration of continuous rainfall spells will decrease in the TGR, leading to a decrease in the frequency of CREs. Meanwhile, the duration, rainfall amount, and intensity of CREs is projected to regional increase in the central-west TGR. These results are inconsistent with the raw projection of MIROC6. Observational diagnosis implies that CREs are mainly contributed by the vertical moisture advection. Such a synoptic contribution is captured well by WRF, which is not the case in MIROC6,indicating larger uncertainties in the CREs projected by MIROC6.
文摘As a national cultural property,General Zhang Fei’s Temple is the largest ancient architectural complex in the Three Gorges of the Yangtze River.It was built in the Han Dynasty and has a long history of nearly 2,000 years.In 1994,the Chinese government launched the Three Gorges Dam project at the Yangtze River and implemented the largest relocation project for the General Zhang Fei Temple to prevent it from being submerged.The temple was relocated 32 kilometers upstream along with the local people of Yunyang County,and the historic environment was rebuilt on the opposite side of the migrant city of New Yunyang County.The temple was restored successfully and the tradition of offering sacrifices to General Zhang Fei continued in the local community.The relocation project lasted for 8 years and became the largest cultural heritage conservation project of the People’s Republic of China at the end of the 20th century.This paper comprehensively summarizes and reviews the project goals,implementation process,and project highlights of this relocation,so as to provide an important case reference for heritage conservation projects in the future.
文摘China Yangtze TGP is a particularly giant hydro development project in the world, with an enormous scale and complex technology. Seventy years project planning, verification and decision making and ten years construction work demonstrate that not only great progress has been made within the projects implementation stage, but most of the conclusions from the verifications and decisions are correct as well. Some problems like sedimentation, environment and resettlement are still waiting to be proven in the actual operation of the project. This paper provides a brief introduction to the decision making and practice on TGP.
文摘Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward.
文摘The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation in June 2003. The side slopes of the ship lock are characterized by great height(170 m), steepness (70 m in height of upright slope), and great length (over 7000 m in total length). Inassociation with the ship lock, the surrounding rocks in slope have a high potential to deform, withwhich the magnitude of deformation is restricted. Monitoring results show that the deformation of thefive-step ship lock high slopes of the TGP primarily occurred in excavation period, and deformationtended to be stable and convergent during operation period, suggesting the allowable ranges of deformation.At present, the slopes and lock chambers are stable, and the ship lock works well under normaloperation condition, enabling the social and economic benefits of the TGP. 2015 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting byElsevier B.V. All rights reserved.
基金supported by the China Three Gorges Corporation(SXSN/2377)
文摘Seismic monitoring data for the past 50 years in the Three Gorges Reservoir area show that the reservoir head area is a typical weak seismic region with low seismieity before impoundment and that the epicenters were concentrated in the east and west sides of the Zigui Basin, most of which were natural tectonic earth- quakes. After impoundment, the seismic activity shifted to the segment between Badong and Zigui along the Yangtze River, mainly within 5 km of the reservoir bank. The seismogenesis was categorized into four types: Karst collapse earthquakes, earthquakes caused by Karst gas explosion, mining tunnel collapse earthquakes, and rock (terrane) slip earthquakes, all of which are related to the lithology, structure, and tectonics of near- surface geological bodies of the area. Compared with the seismicity before impoundment, the seismic frequency increase was remarkable, with most of the magnitudes below Ms2.0. Therefore, the intensity of the earth- quakes remained at a low level. On November 22, 2008, a magnitude 4.1 earthquake, the largest earthquake recorded since impoundment, occurred in Quyuan Town, Zigui County. The intensity and PGA of reservoir-in- duced earthquakes are higher than those of tectonic earthquakes with equal magnitude, but the peak intensity of reservoir-induced earthquakes is not likely to go beyond that of the estimated range from earlier studies.
文摘The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River. The project includes a river-crossing dam, underground powerhouses, and navigation structures. Because of the huge size and complicated construction technologies, the project faced a series of challenging engineering issues. In terms of rock mechanics, there are many key technical issues, including the sliding resistance and stability of the dam section along the foundations of powerhouses No.l-5, the ,,;lope stability of the double-line five-stage shiplock, excavation of large-scale underground powerhouses, and curtain grouting under the dam. With decades of scientific research and 16 years of practical construction experiences and reservoir operations, these key technical issues in construction of the Three Gorges Project are successfully resolved, which will attribute to the development of hydropower technology. On the basis of the monitoring data during construction and normal operation periods of the Three Gorges Project, this paper presents a systematic analysis of these key rock mechanical issues in terms of behaviors, solutions, dynamic controlling, monitoring arrangement and integrated assessment.
基金supported by the National Key Research and Development Program of China(Grants No.2016YFC0402307 and 2016YFC0402103)the National Natural Science Foundation of China(Grant No.51520105014).
文摘The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the shoal-channel evolution over different seasons since the completion of the TGP.Based on analysis of the measured data and the results of a two-dimensional mathematical model,the changes of the river regime and river bed evolution in the Yaojian reach downstream of the TGP were studied.Results show that a high sediment transport flux helps to keep the main flow in the North Branch,while a low sediment transport flux helps to keep the main flow in the South Branch.Thus,the main branch will not change in the near future because of the low sediment transport load.In this study,the flow-sediment process adjusted by the TGP was restored to the conditions before the TGP,and the river bed evolution under the adjusted and non-adjusted flow-sediment conditions was calculated.After the completion of the TGP,the reservoir storage accelerated the flood recession process and decreased the erosion by 11.9%under the flow-sediment conditions in 2010,and the deposition in the flood season decreased by 56.4%.
文摘To date,the Three Gorges Project is the largest hydro junction in the world.It is the key project for the integrated water resource management and development of the Changjiang River.The technology of the project,with its huge scale and comprehensive benefits,is extremely complicated,and the design difficulty is greater than that of any other hydro project in the world.A series of new design theories and methods have been proposed and applied in the design and research process.Many key technological problems regarding hydraulic structures have been overcome,such as a gravity dam with multi-layer large discharge orifices,a hydropower station of giant generating units,and a giant continual multi-step ship lock with a high water head.
文摘The proposed hydroelectric project on the Yangtze Gorges will be one of the largest power stations in the world.The problem of induced seismicity to the project has attracted much attention throughout China and the world.A research program has been carried out by the State Seismological Bureau of China.Based on the size of the reservoir and the lithology,geological structure,permeability,stress state,and previous seismicity in the region,the potential risk of reservoir-induced seismicity has been estimated.The results suggest that,after impoundment in the reservoir area,the possibility of induced seismicity cannot be completely ruled out.The areas with potential risk may be in some gorges composed of karstified carbonate and plutonic granite around the dam site.However,the magnitude is expected to be limited owing to the small dimension of the induced seismogenic faults.
文摘The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of Three Gorges Project (TGP) are introduced.Since the operation of ship-lock in 2003,the operation practice has proved that the design techniques are advanced,rational and reliable.The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects,which makes the construction technology of ship-lock in the world reach a new level.
文摘The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock.
基金the Project of Construction Committee of Three Gorges Reservoir (Grant No. SX[2002]00401)Chinese Academy of Science (Grant No. KZCX2-SW-319-01).
文摘The Three Gorges Project attracts worldwide attention because of the Three Gorges migrants, and the agriculture of the Three Gorges Reservoir Area is a foundation for the development of the Three Gorges migrants. The Three Gorges Reservoir Area is situated at the mountainous area with bad agricultural development conditions and relatively low levels of development. As a result, the large-scale migration fias special influence on its agricultural development, which has attracted much attention. The paper analyzes influence that the migrants have forced on its agricultural development based on the scientific data, and makes some explorations on the models that are suitable for the development of mountainous agriculture in the Three Gorges Reservoir Area.
基金supported by the National Science and Technology Basic Resource Investigation Program (No.2017FY100900)。
文摘The construction of the Three Gorges Reservoir and the resettlement project have caused increasing contradictions between human and land,and led to the deterioration of the ecological environment. In order to ameliorate ecological environment of the Three Gorges Area, the government carried out several ecological restoration projects to improve the vegetation coverage from 1990 s. This paper aims to quantitatively analyze the impact of ecological projects on the vegetation in the Three Gorges Area of Chongqing, China. Landsat and MODIS data from 1992 to 2015 were used to estimate vegetation coverage. In addition, the land cover data of the European Space Agency(ESA) was used to explore the impact of ecological projects on land cover change. The cropland accounted for about 62% and the forestland accounted for about 34% of the total area. There was more than 90% of the study area covered with high or very high vegetation coverage.From 1992 to 2015, a total of 272.7 km;croplands were converted into forestland in the Ecological Migration Project(EMP), 795.6 km;in the Grain for Green Project(GGP), and 13.77 km;in the Ecological Restoration Zone Project(ERZP). Among the three projects, the GGP was the most powerful measure,with a contribution rate of 1.6%. The implementation of the ecological projects improved vegetation coverage, which indicated that the ecological projects measures were effective in ecological restoration.
基金Supported by National Natural Science Foundation of China (No.50679009)Key Laboratory for Scientific Research of Department of Education in Liaoning Province (No.2008S045)
文摘This paper establishes a 3D numerical model for 15# hydropower house of the Three Gorges Project (TGP) and performs a nonlinear static and dynamic damage analysis. In this numerical model, a coupling model of finite and infinite elements for simulating infinite foundation of hydropower station is adopted. A plastic-damage model based on continuum damage mechanics, which includes the softening and damage behavior under tension is considered for the concrete material. The dynamic equilibrium equations of moti...
文摘The construction of Three Gorges Project (TGP) is characterized by large construction scale,high construction intensity and complexity in technology.In view of various technical difficulties such as navigation in construction period,two river closures,high-intensity concrete and earth-rock construction,high-intensity construction and demolition of RCC (roller compacted concrete) cofferdam in stage III and immediate navigation of double-line five-step shiplock after impoundment of reservoir,the scheme of river diversion during construction is adopted,namely "diversion in 3 stages,open channel navigation and cofferdam power generation".The practice and innovation achievements in river diversion during construction as well as earth-rock and concrete construction are presented emphatically.
基金Project(SPKJ016-06)supported by the Key Research Project of State Power Corporation,ChinaProject(2004AC1O1D31)supported by the Key Scientific Research Project of Hubei Province,ChinaProject(0722018)supported by the China Three Gorges Corporation
文摘The pinion bracket-assembly(PBA) is a major part of three gorges project(TGP) ship lift drive system. The static strength,fatigue strength and stress distribution of hinge pin of PBA were analyzed by ANSYS, and the structure of PBA was optimized. The results show that after the optimization, the maximum comprehensive stress is 259.59 MPa, the maximum fatigue cumulative damage of weld joints is 0.94 and the maximum vertical deformation of hinge pin is 0.14 mm. The elastic deformation, hydropneumatic spring cylinder(HSC) load response and the vibration characteristics of PBA were studied by the bearing test when PBA bore the load caused by different water level errors. The results indicate that when the water level of ship chamber ranges from 3.4 m to 3.6 m,the vertical elastic deformation of the pinion shaft is between-8.58 and 10.50 mm. When upward outage-load(1580 k N) is imposed by the test-rack, the vertical elastic deformation of the pinion shaft is 13.42 and 14.07 mm and HSC load response is 795.80-800.80 k N. In the process of imposing load on the pinion by the test-rack, the maximum vibration amplitude and acceleration of PBA internal components are 0.37° and 2.67 rad/s2, respectively; the maximum impact on the pin caused by vibration is 19.89 k N; the pinion shaft vertical displacement and HSC load response do not fluctuate. There is a great difference between the frequency of meshing force of the pinion and the rack(1.06 Hz) and first-order natural frequency of PBA(8.41 Hz), thus PBA will not resonate.From all above, PBA meets the static strength and fatigue strength requirements. The vibration of PBA internal components has no effect on the vertical displacement of the pinion shaft, HSC load response and smooth operation of PBA. There is a liner relationship in the ratio of 2:1 between the thrust imposed by the test-rack and HSC load, thus HSC can limit the load imposed on the pinion.
基金Supported by the National Natural Science Foundation(30870402,31170396)Key Knowledge Innovation Project of Chinese Academy of Sciences(KSCX-EW-N-05)
文摘The outbreak of Yantze vole ( Microtus fortis) population in Dongting Lake region is closely related to the evolvement of lake beaches,because the deposition of lake sediments results in the expansion of lake beaches,which provides the possibility of the increase of the vole's population. Reclaiming farmland from lake via building cofferdams,eliminating snails by building cofferdams for eradicating schistosomiasis,and over-hunting predators in the region cause the voles becoming a pest after the 1970s. In recent years,the Three Gorges Project and the conversion from farmland into lake have had deep impacts on the environment in the lake region. The dispatching of the down flow rate by the project has induced the expansion of the low and medium level beaches in the lake region,while converting farmland into lake directly has induced the expansion of the lake beaches,both of which have expanded the potential habitats of the vole's population. Therefore,more attention should be paid to the quantitative variation trend of the vole's population in the future.
基金the National Key Technology Research and Development Program of the Ministry of Science and Technology of China (Grant No. 2012BAD05B06)
文摘Fertile topsoil was added onto the surface of barren slope land in Three Gorges Reservoir region of China in an anthropogenic process known as the foreign soil reconstruction project. The main goal of this paper was to reveal the influence of anthropogenic activities on pedogenic processes and soil classifications. Chemical weathering indices and comparative analysis were applied to discuss changes in geochemical compositions and weathering features of purplish soils(Cambisols) before and after the project. Results showed that:(1) The foreign soil reconstruction project slightly altered the major element composition of topsoil and improved the soil structure. Although the distributions of major elements in the original topsoil, original subsoil, foreign topsoil and newly constructed topsoil were all similar to that in upper continental crust, newly constructed topsoil was the most similar soil.(2) The chemical index of alteration was more sensitive than the weathering index of Parker at indicating chemical weathering status of purplish soil. The chemical weathering status of newly constructed topsoil was higher than that of the original topsoil and lower than that of foreign topsoil.(3) Anthropogenic activities may provide a promising new thought for the anthropogenic soil classification system. The scope and subgroups of Anthrosols should be extended and strengthened. Or there may be a need to combine Anthrosols and Technosols orders to create a new soil order. The results may be used for optimizing soil mellowing engineering activities and enriching the soil classification system.