期刊文献+
共找到4,552篇文章
< 1 2 228 >
每页显示 20 50 100
Estimating shear strength of high-level pillars supported with cemented backfilling using the HoekeBrown strength criterion 被引量:4
1
作者 Kaizong Xia Congxin Chen +3 位作者 Xiumin Liu Yue Wang Xuanting Liu Jiahao Yuan 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第2期454-469,共16页
Deep metal mines are often mined using the high-level pillars with subsequent cementation backfilling(HLSCB)mining method.At the design stage,it is therefore important to have a reasonable method for determining the s... Deep metal mines are often mined using the high-level pillars with subsequent cementation backfilling(HLSCB)mining method.At the design stage,it is therefore important to have a reasonable method for determining the shear strength of the high-level pillars(i.e.cohesion and internal friction angle)when they are supported by cemented backfilling.In this study,a formula was derived for the upper limit of the confining pressure σ3max on a high-level pillar supported by cemented backfilling in a deep metal mine.A new method of estimating the shear strength of such pillars was then proposed based on the Hoek eBrown failure criterion.Our analysis indicates that the horizontal stress σhh acting on the cemented backfill pillar can be simplified by expressing it as a constant value.A reasonable and effective value for σ3max can then be determined.The value of s3max predicted using the proposed method is generally less than 3 MPa.Within this range,the shear strength of the high-level pillar is accurately calculated using the equivalent MohreCoulomb theory.The proposed method can effectively avoid the calculation of inaccurate shear strength values for the high-level pillars when the original HoekeBrown criterion is used in the presence of large confining pressures,i.e.the situation in which the cohesion value is too large and the friction angle is too small can effectively be avoided.The proposed method is applied to a deep metal mine in China that is being excavated using the HLSCB method.The shear strength parameters of the high-level pillars obtained using the proposed method were input in the numerical simulations.The numerical results show that the recommended level heights and sizes of the high-level pillars and rooms in the mine are rational. 展开更多
关键词 Deep metal mines High-level pillars HoekeBrown strength criterion Cemented backfilling Confining pressure Shear strength
下载PDF
一种简化的基于First-Fit的Backfilling调度策略——RB-FIFT 被引量:6
2
作者 叶庆华 梁毅 孟丹 《计算机工程与应用》 CSCD 北大核心 2003年第2期70-74,共5页
机群作业管理系统是机群系统的重要组成部分,而作业调度策略又是机群作业管理系统的核心内容。作业调度策略的选择不仅关系到机群系统的利用率,还决定用户作业的响应速度和平均执行时间。在节点分配基于空间共享策略(Space-Sharing)的... 机群作业管理系统是机群系统的重要组成部分,而作业调度策略又是机群作业管理系统的核心内容。作业调度策略的选择不仅关系到机群系统的利用率,还决定用户作业的响应速度和平均执行时间。在节点分配基于空间共享策略(Space-Sharing)的机群系统中,传统的基于先来先服务的First-Fit调度策略虽然能够提高机群系统的利用率,却容易引起饥饿问题。文章基于传统的先来先服务的调度策略,提出了一种简化的Backfilling算法,简要叙述了该算法的设计和实现,最后根据模拟实验结果,从用户和系统的角度分析了该算法的性能。 展开更多
关键词 First-Fit算法 RB-FIFT算法 backfilling调度策略 机群作业管理系统
下载PDF
Subsidence prediction method based on equivalent mining height theory for solid backfilling mining 被引量:16
3
作者 郭广礼 朱晓峻 +1 位作者 查剑锋 王强 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2014年第10期3302-3308,共7页
Based on the characteristics of strata movement of solid backfilling mining technology, the surface subsidence prediction method based on the equivalent mining height theory was proposed, and the parameters selection ... Based on the characteristics of strata movement of solid backfilling mining technology, the surface subsidence prediction method based on the equivalent mining height theory was proposed, and the parameters selection guideline of this method was also described. While comparing the parameters of caving mining with equivalent height, the subsidence efficient can be calculated according to the mining height and bulk factor of sagging zone and fracture zone, the tangent of main influence angle of solid backfilling mining is reduced by 0.2-0.5(while it cannot be less than 1.0). For sake of safety, offset of the inflection point is set to zero, and other parameters, such as horizontal movement coefficient and main propagation angle are equal to the corresponding parameters of caving mining with equivalent height. In the last part, a case study of solid backfilling mining subsidence prediction was described. The results show the applicability of this method and the difference of the maximum subsidence point between the prediction and the observation is less than 5%. 展开更多
关键词 solid backfilling mining mining subsidence equivalent mining height subsidence prediction subsidence control
下载PDF
基于Backfilling调度算法的“扩履适足”改进算法 被引量:2
4
作者 付云虹 白树仁 方俊 《计算机工程与科学》 CSCD 2006年第9期94-96,122,共4页
在众多的并行作业调度算法中,Backfilling通常被广泛认为是有效提高CPU利用率的一种算法。该算法是在FCFS算法的基础上,将队列中较小的作业回填(Backfill)到空闲CPU,以提高CPU利用率。但是,当空闲CPU数量仍然无法满足Backfilling算法中... 在众多的并行作业调度算法中,Backfilling通常被广泛认为是有效提高CPU利用率的一种算法。该算法是在FCFS算法的基础上,将队列中较小的作业回填(Backfill)到空闲CPU,以提高CPU利用率。但是,当空闲CPU数量仍然无法满足Backfilling算法中小作业的回填要求时,系统仍有部分CPU闲置,因而也难以达到更好地提高CPU利用率的目的。对于共享内存体系结构的并行计算机系统,本文提出了基于Backfilling算法的“扩履适足”的改进算法。该算法以正在运行的作业的CPU利用率为依据,通过动态调整正在运行作业的CPU数,扩大可供回填(backfill)的CPU空间,使得Backfilling算法无法回填的作业得到运行,弥补了Backfilling算法的不足,大大提高了共享内存体系结构并行计算机系统的CPU利用率。 展开更多
关键词 并行计算 作业调度 CPU利用率 backfilling算法 扩履适足
下载PDF
结合Backfilling和空闲资源调度的云工作流调度方法 被引量:2
5
作者 谭海中 赵丽 《西南大学学报(自然科学版)》 CAS CSCD 北大核心 2018年第6期149-157,共9页
针对云计算中工作流的科学调度问题,提出了一种快速且有效的调度方案.首先,根据计算速度将所有的资源节点以降序方式排列;然后,调度程序通过深度优先搜索,检查任务之间的依赖关系,并根据截止期限对待执行任务进行加权排序;接着,计算每... 针对云计算中工作流的科学调度问题,提出了一种快速且有效的调度方案.首先,根据计算速度将所有的资源节点以降序方式排列;然后,调度程序通过深度优先搜索,检查任务之间的依赖关系,并根据截止期限对待执行任务进行加权排序;接着,计算每个待执行任务所使用的资源的时隙.如果当前可用资源不能满足当前任务,则采用Backfilling策略,对该任务所需资源进行预留,并跳到下一个任务执行.如果当前资源满足当前任务,则执行提出的空闲资源调度(IRS)策略,尽量安排空闲资源来执行该任务.仿真结果表明:与当前云工作流调度技术相比,本文调度策略具有更低的任务完成时间与任务执行延迟,以及更高的资源利用率. 展开更多
关键词 云计算 工作流调度 backfilling策略 空闲资源调度 任务执行延迟
下载PDF
基于LT-backfilling算法的集群作业调度系统 被引量:4
6
作者 张果桃 赵金雁 白中英 《计算机工程》 CAS CSCD 北大核心 2007年第21期69-71,共3页
在胖节点集群系统中,目前的reservations,backfilling等主流调度算法未能充分考虑单节点过载情况。该文在传统backfilling算法基础上,充分考虑节点当前负载,将预约、回填策略相结合,提出了一种新的LT-backfilling调度算法。设计了基于XM... 在胖节点集群系统中,目前的reservations,backfilling等主流调度算法未能充分考虑单节点过载情况。该文在传统backfilling算法基础上,充分考虑节点当前负载,将预约、回填策略相结合,提出了一种新的LT-backfilling调度算法。设计了基于XML业务流程模板的二层作业调度系统,用户不仅可以提交单个作业,而且可以提交一组具有数据相关性的作业流,使得作业调度系统更加实用化。 展开更多
关键词 LT-backfilling 负载均衡 作业调度 XML 作业流
下载PDF
Cemented backfilling performance of yellow phosphorus slag 被引量:17
7
作者 Jia-sheng Chen Bin Zhao +2 位作者 Xin-min Wang Qin-li Zhang Li Wang 《International Journal of Minerals,Metallurgy and Materials》 SCIE EI CAS CSCD 2010年第1期121-126,共6页
The experiments on the cemented backfilling perfbrmance of yellow phosphorus slag, including physical-mechanical properties, chemical compositions, optimized proportion, and cementation mechanisms, were carried out to... The experiments on the cemented backfilling perfbrmance of yellow phosphorus slag, including physical-mechanical properties, chemical compositions, optimized proportion, and cementation mechanisms, were carried out to make good use of yellow phosphorus slag as well as tackle with environment problems, safety problems, geological hazards, and high-cost issues during mining in Kaiyang Phosphorus Mine Group, Guizhou. The results show that yellow phosphorus slag can be used as the cement substitute for potential coagulation property. Quicklime, hydrated lime, and other alkaline substances can eliminate the high residual phosphorus to improve the initial strength of backfilling body. The recommended proportions (mass ratio) are 1:1 (yellow phosphorus slag:phosphorous gypsum), 1:4:10 (Portland cement:yellow phosphorus slag:phosphorous gypsum), and 1:4:10 (ultra fine powder:yellow phosphorus slag:phosphorous gypsum) with 5wt% of hydrated lime addition, 60wt% of solid materials, no fly ash addition, and good rheological properties. The hydration reaction involves hydration stage, solidifying stage, and strength stage with Ca(OH)2 as the activating agent. The reaction rates of yellow phosphorus slag, Portland cement, and ultrafine powder hydration with the increase of microstructure stability and initial strength. 展开更多
关键词 SLAG phosphorous backfilling rheological properties CEMENTATION
下载PDF
Numerical investigation into the effect of backfilling on coal pillar strength in highwall mining 被引量:9
8
作者 Mo S. Canbulat I. +3 位作者 Zhang C. Oh J. Shen B. Hagan P. 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2018年第2期281-286,共6页
This paper attempts to quantify the effect of backfilling on pillar strength in highwall mining using numerical modelling. Calibration against the new empirical strength formula for highwall mining was conducted to ob... This paper attempts to quantify the effect of backfilling on pillar strength in highwall mining using numerical modelling. Calibration against the new empirical strength formula for highwall mining was conducted to obtain the material parameters used in the numerical modelling. With the obtained coal strength parameters, three sets of backfill properties were investigated. The results reveal that the behavior of pillars varies with the type and amount of backfill as well as the pillar width to mining height ratio(w/h). In case of cohesive backfill, generally 75% backfill shows a significant increase in peak strength, and the increase in peak strength is more pronounced for the pillars having lower w/h ratios. In case of noncohesive backfill, the changes in both the peak and residual strengths with up to 92% backfill are negligible while the residual strength constantly increases after reaching the peak strength only when 100%backfill is placed. Based on the modelling results, different backfilling strategies should be considered on a case by case basis depending on the type of backfill available and desired pillar dimension. 展开更多
关键词 Highwall MINING backfilL COAL PILLAR Strength Numerical modelling
下载PDF
Paste-like self-flowing transportation backfilling technology based on coal gangue 被引量:30
9
作者 WANG Xin-min ZHAO Bin +1 位作者 ZHANG Chuan-shu ZHANG Qin-li 《Mining Science and Technology》 EI CAS 2009年第2期137-143,共7页
A paste-like self-flowing pipeline transportation backfilling technology with coal gangue as aggregate is proposed to remove the potential damage caused by coal gangue piles. As well, the difficult problems of recover... A paste-like self-flowing pipeline transportation backfilling technology with coal gangue as aggregate is proposed to remove the potential damage caused by coal gangue piles. As well, the difficult problems of recovering high quality safety coal pillars and deep mining of the Suncun Coal Mine (SCM), Xinwen Coal Group, Shandong are resolved. The physical-chemical properties of coal gangue, optimized proportion of materials, backfilling system and craft in the SCM were studied in the laboratory and then an industrial test was carried out on high quality coal pillars under a town. The results show that finely crushed kaolinized and fresh gangue with granularity less than 5 mm can be used as aggregate with fly ash to replace part of the cement and a composite water reducer as an additive, accounting for 1.0%-1.5% of the total amount of cement and fly ash. The recommended proportion is l(cement):4(fly ash): 15(coal gangue), with a mass fraction of 72%-75%, rheoiogical paste-like properties and a strength of more than 0.7 MPa at 7 d. The sequence of adding cement, fly ash, water reducer and then coal gangue ensures that the suspended state of the slurry, reducing the wear and jam of pipelines. The working face is advancing continuously by the alternating craft of building block walls with coal gangue and backfilling mined-out gobs with paste-like slurry. The recovery rate is as high as 90% with a backfilling cost of 36.9 YuarffL good utilization of coal gangue and no subsidence on the surface. This technology provides a good theoretical basis and application experience for coal mines, cement backfilling with paste-like slurry. 展开更多
关键词 coal gangue PASTE-LIKE self-flowing backfilling system backfilling craft
下载PDF
Mining pressure monitoring and analysis in fully mechanized backfilling coal mining face-A case study in Zhai Zhen Coal Mine 被引量:14
10
作者 张强 张吉雄 +2 位作者 康涛 孙强 李伟康 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第5期1965-1972,共8页
Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic pr... Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic principles and methods for mining pressure monitoring were analyzed and established. And the characteristics of overburden strata movement were analyzed by monitoring the support resistance of hydraulic support, the dynamic subsidence of immediate roof, the stress of backfill body, the front abutment pressure, and the mass ratio of cut coal to backfilled materials. On-site strata behavior measurements of 7403 W solid backfilling working face in Zhai Zhen Coal Mine show that the backfill body can effectively support the overburden load, obviously control the overburden strata movement, and weaken the strata behaviors distinctly. Specific performances are as follows. The support resistance decreases obviously; the dynamic subsidence of immediate roof keeps consistent to the variation of backfill body stress, and tends to be stable after the face retreating to 120-150 m away from the cut. The peak value of front abutment pressure arises at 5-12 m before the operating face, and mass ratio is greater than the designed value of 1.15, which effectively ensures the control of strata movement. The research results are bases for intensively studying basic theories of solid backfill mining strata behaviors and its control, and provide theoretical guidance for engineering design in FMSBM. 展开更多
关键词 fully mechanized solid backfill mining(FMSBM) strata movement strata behavior mining pressure monitoring
下载PDF
A roof model and its application in solid backfilling mining 被引量:4
11
作者 Ju Feng Huang Peng +2 位作者 Guo Shuai Xiao Meng Lan Lixin 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第1期139-143,共5页
Through changing the axial load on backfilling material compaction test to reflect different overlying strata pressure on backfilling material, the stress-strain relations in the compaction process of backfilling mate... Through changing the axial load on backfilling material compaction test to reflect different overlying strata pressure on backfilling material, the stress-strain relations in the compaction process of backfilling material under the geological condition can be obtained. Based on the characteristic of overlying strata movement in backfill mining, a model of roof thin plate is established. By introducing the stress-strain relation in compaction process into the model and using RIZT method to analyze the bending deformation of roof, the bending deflection and stress distribution can be obtained. The results show that the maximum roof subsidence and maximum tensile stress occurring at the center are 255 mm and5 MPa, respectively. Tensile fracture of roof under the geological condition of Dongping Mine did not occur. The dynamic measurement results of roof in Dongping Mine verify the theoretical result from the aforementioned model, thereby suggesting the roof mechanical model is reliable. The roof thin plate model based on the compaction characteristic of backfilling material in this study is of importance to research on backfill mining theories and application of backfilling material characteristics. 展开更多
关键词 backfill mining backfilling material Compaction characteristic Thin plate model
下载PDF
Subsidence control and farmland conservation by solid backfilling mining technology 被引量:6
12
作者 GUO Guang-li1, 2, FENG Wen-kai3, ZHA Jian-feng1, 2, 3, LIU Yuan-xu1, 2, WANG Qiang1, 2 1. Key Laboratory for Land Environment and Disaster Monitoring of the State Bureau of Surveying and Mapping, China University of Mining and Technology, Xuzhou 221116, China 2. Jiangsu Key Laboratory of Resources and Environmental Information Engineering, China University of Mining and Technology, Xuzhou 221116, China 3. State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059, China 《中国有色金属学会会刊:英文版》 CSCD 2011年第S3期665-669,共5页
Solid backfilling mining technology, which decreases the height of fissure zone and caving zone, and alleviates the subsidence, is a new technology for farmland conservation. Based on the situation analysis of farmlan... Solid backfilling mining technology, which decreases the height of fissure zone and caving zone, and alleviates the subsidence, is a new technology for farmland conservation. Based on the situation analysis of farmland destruction in mining area, three ways for farmland protection were proposed. In order to improve the feasibility of this technology, the limited filling materials should be used to increase resources recovery ratio, and then the surplus materials could be backfilled into goaf. An index, namely farmland conservation ability, was put forward to optimize the ways for farmland conservation. At last, the Wanbei coal mine was taken as a case for farmland conservation. It was shown that 3240 t dull coal was substituted and 52 hm2 farmland was conserved by solid backfilling mining in this coal mine. 展开更多
关键词 solid backfilling FARMLAND conservation MINING SUBSIDENCE EQUIVALENT MINING HEIGHT
下载PDF
Features of pipe transportation of paste-like backfilling in deep mine 被引量:10
13
作者 王新民 赵建文 +1 位作者 薛俊华 余国锋 《Journal of Central South University》 SCIE EI CAS 2011年第5期1413-1417,共5页
Based on the pipe transportation of paste-like backfilling system of a certain deep coal mine,its dynamics process was simulated and analyzed.A two-dimensional dynamic model of extraordinary deep and lone pipe was bui... Based on the pipe transportation of paste-like backfilling system of a certain deep coal mine,its dynamics process was simulated and analyzed.A two-dimensional dynamic model of extraordinary deep and lone pipe was built by GAMBIT,on the basis of which the simulation was done by implicit solver of FLUENT 2ddp.The results show that hydraulic loss of pipe transportation is less than the pressure produced by gravity,which means the backfilling material can flow by itself.When the inlet velocity is 3.2 m/s,the maximum velocity of 4.10 m/s is at the elbow and the maximum velocity in the horizontal pipe is 3.91 m/s,which can both meet the stability requirement.The results of the simulation are proved to be reliable by the residual monitor plotting of related parameter,so it can be concluded that the system of pipe transportation is safe. 展开更多
关键词 backfilling deep mine paste-like slurry pipe transportation flow
下载PDF
Mining subsidence control by solid backfilling under buildings 被引量:3
14
作者 ZHA Jian-feng1, 2, 3, GUO Guang-li1, 2, FENG Wen-kai3, WANG Qiang1, 2 1. Key Laboratory for Land Environment and Disaster Monitoring of the State Bureau of Surveying and Mapping, China University of Mining and Technology, Xuzhou 221116, China 2. Jiangsu Key Laboratory of Resources and Environmental Information Engineering, China University of Mining and Technology, Xuzhou 221116, China 3. State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059, China 《中国有色金属学会会刊:英文版》 CSCD 2011年第S3期670-674,共5页
Solid backfilling mining can reduce the buildings' damage caused by mining greatly. The reduction of subsidence value, the slow advancing speed and the subsidence caused by backfilling body compaction are the main... Solid backfilling mining can reduce the buildings' damage caused by mining greatly. The reduction of subsidence value, the slow advancing speed and the subsidence caused by backfilling body compaction are the main reasons that solid backfilling mining velocity decreases significantly. Based on the research of mechanism, some principles on subsidence control of solid backfilling mining under buildings were proposed. The equivalent mining height was designed according to the fortification criteria of buildings and their attachment structures, which enables the ground movement and deformation caused by mining to be less than the corresponding fortification criteria. 展开更多
关键词 SOLID backfilling MINING SUBSIDENCE CONTROL MINING under BUILDINGS
下载PDF
Innovative backfilling longwall panel layout for better subsidence control effect-separating adjacent subcritical panels with pillars 被引量:21
15
作者 Jialin Xu Dayang Xuan Changchun He 《International Journal of Coal Science & Technology》 EI CAS 2014年第3期297-305,共9页
In recent years,field trials of non-pillar longwall mining using complete backfill have been implemented successively in the Chinese coal mining industry.The objective of this paper is to get a scientific understandin... In recent years,field trials of non-pillar longwall mining using complete backfill have been implemented successively in the Chinese coal mining industry.The objective of this paper is to get a scientific understanding of surface subsidence control effect using such techniques.It begins with a brief overview on complete backfill methods primarily used in China,followed by an analysis of collected subsidence factors under mining with complete backfill.It is concluded that non-pillar longwall panel layout cannot protect surface structures against damages at a relatively large mining height,even though complete backfill is conducted.In such cases,separated longwall panel layout should be applied,i.e.,panel width should be subcritical and stable coal pillars should be left between the adjacent panels.The proposed method takes the principles of subcritical extraction and partial extraction;in conjunction with gob backfilling,surface subsidence can be effectively mitigated,thus protecting surface buildings against mining-induced damage.A general design principle and method of separated panel layout have also been proposed. 展开更多
关键词 Mining with backfill Longwall mining Surface subsidence control Suberitical panel width Separatedpillar
下载PDF
CO2 sequestration characteristics in the cementitious material based on gangue backfilling mining method 被引量:9
16
作者 Peng Wang Xianbiao Mao Shen-En Chen 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2019年第5期721-729,共9页
The increasing anthropogenic CO2 emission and global warming has challenged the China and other countries to seek new and better ways to meet the world’s increasing need for energy while reducing greenhouse gas emiss... The increasing anthropogenic CO2 emission and global warming has challenged the China and other countries to seek new and better ways to meet the world’s increasing need for energy while reducing greenhouse gas emissions.The overall proposition of this research is to develop a brand-new CO2 physical and chemical sequestration method by using solid waste of coal mining and cementitious material which are widely used for goaf backfilling in coal mining.This research developed a new testing system(constant temperature pressurized reaction chamber(CTPRC))to study the effects of different initial parameters on mineral carbonation such as different initial water-binder ratio,initial sample porosity and initial carbon dioxide pressure.The experimental results show that the CO2 consumption ratio is 15%,10%and 7%higher with relatively high initial water-binder ratio,initial sample porosity and initial CO2 pressure within 48 h.In addition,some physical and chemical evidence was found through the electron microscope scanning and XRD test to further explain the above test results.This proposed research will provide critical parameters for optimizing CO2 sequestration capacity in this cementitious backfilling material with forming agent. 展开更多
关键词 GANGUE backfilling GOAF Carbon dioxide SEQUESTRATION MINERAL CARBONATION Cementious material
下载PDF
Influence of backfilling rate on the stability of the"backfilling bodyimmediate roof"cooperative bearing structure 被引量:6
17
作者 Xianjie Du Guorui Feng +2 位作者 Min Zhang Zehua Wang Wenhao Liu 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2022年第6期1197-1206,共10页
To reduce the cost of backfilling coal mining and utilize the underground space of coal mines,a new backfilling mining method with low backfilling rate called constructional backfilling coal mining(CBCM)is proposed.Th... To reduce the cost of backfilling coal mining and utilize the underground space of coal mines,a new backfilling mining method with low backfilling rate called constructional backfilling coal mining(CBCM)is proposed.The "backfilling body-immediate roof" cooperative bearing structure of CBCM is analyzed by establishing the model of the medium thick plate on an elastic foundation.The influence of the backfilling rate on the stability of overlying strata is analyzed by the numerical simulation experiment.The control effect of CBCM is verified by a physic similar simulation test.The economic benefit of CBCM is analyzed.The conclusions are:the deformation characteristics of the immediate roof and critical backfilling spacing in CBCM can be analyzed based on the Hu Haichang’s theory.Exerting the bearing capacity of the immediate roof is beneficial to the stability of the overlying strata.The CBCM has a good control effect on the overburden in Xinyang Mine when the backfilling rate is lower than 25%.The backfilling cost of per ton coal is 37.39 yuan/t when the backfilling rate is 13.7%,with a decrease rate of 56.63%than the full-filling.The research results can provide theoretical support for the application of CBCM in coal mining. 展开更多
关键词 Constructional backfilling coal mining Immediate roof Cooperative bearing structure Medium thick plate on elastic foundation backfilling rate Overlying strata
下载PDF
Quality evaluation of layerlike backfilling and flow pattern of backfill slurry in stope 被引量:11
18
作者 彭欣 李夕兵 +1 位作者 张钦礼 王新民 《Journal of Central South University of Technology》 EI 2007年第4期580-583,共4页
Stability condition and quality evaluation formula of layerlike backfilling roof,Q≥C,where Q denotes is quality index depending on allowable compressive or tensile strength and integrity of backfilling,and C is the t... Stability condition and quality evaluation formula of layerlike backfilling roof,Q≥C,where Q denotes is quality index depending on allowable compressive or tensile strength and integrity of backfilling,and C is the technical index depending on mining method and backfilling technology,were inferred according to simply supported beam theorem.Technical treatment measures for instable backfilling roof,including optimum of appropriate filling materials and dosage for excellent flow property and reduction of backfill cost.It is proved that slope equation of backfill slurry in a stope to be filled is y=hexp[x2/(2σ)2)],where h is height of cone and σ2 is mean square,and that optimum drainage point of backfill slurry can be determined by the equation and sizes of stope.Case study indicates that the results can give a theoretical support for quality evaluation and control of layerlike backfilling. 展开更多
关键词 layerlike backfilling quality evaluation flow pattern simply supported beam
下载PDF
Position-optimization on retained entry and backfilling wall in gob-side entry retaining techniques 被引量:7
19
作者 Xiaowei Feng Nong Zhang 《International Journal of Coal Science & Technology》 EI 2015年第3期186-195,共10页
This study investigates the stability problem of gob-side entry retaining (GER) and backfilling wall which located under the key block B. Based on the combined research of elastic-plastic mechanics, structure mechan... This study investigates the stability problem of gob-side entry retaining (GER) and backfilling wall which located under the key block B. Based on the combined research of elastic-plastic mechanics, structure mechanics and modern theory of mining-induced pressure, the caving characteristic and roof structure over the GER were analyzed, and the vertical force and the torque on retained entry roof were also derived as the position for the retained entry varies. On the basis of the specific geology in Huainan mining area, the results indicate that a relatively more stable position for retained entry neighbors the hinge point of block A and B, and it also located at a scope ranging from this point to the one-third length of block B in horizontal direction. As to appropriate position for backfilling wall, this study recommends partial- road-in backfilling method for GER. Field trial conducted at panel face 12418 of Xieqiao Mine demonstrates that the recommended width for original entry is 3.6 m and the preferred width proportion between original retained entry and original entry is 75 % or so whereas the avoidable one is 88 % or so. These findings provide qualitative references to the mines which share similar geology as what Huainan mining area characterized. 展开更多
关键词 Mining engineering Position-optimization Gob-side entry retaining Partial-road-in backfilling
下载PDF
Backfilling technology and strata behaviors in fully mechanized coal mining working face 被引量:55
20
作者 Zhang Qiang Zhang Jixiong +1 位作者 Huang Yanli Ju Feng 《International Journal of Mining Science and Technology》 2012年第2期151-157,共7页
Based on the principle of fully mechanized backflling and coal mining technology and combined with the Xingtai Coal Mine conditions, we mainly optimized the coal mining equipment and adjusted the coal mining method in... Based on the principle of fully mechanized backflling and coal mining technology and combined with the Xingtai Coal Mine conditions, we mainly optimized the coal mining equipment and adjusted the coal mining method in the Xingtai Coal Mine 7606 working face for implementation this technology. Firstly, we define the practical backfilling process as the "(from backfilling scraper conveyor's) head to tail back- filling, step by step swinging up of the tamping arm, gradual compacting, moving formed backfilling scra- per conveyor when the second tamping arm cannot pass and connecting the immediate roof by back material push front material movement". Meanwhile, the stress changes of backfill body in coal mined out area was monitored by stress sensors, and the roof caving law was analyzed by monitoring the dynamic subsidence of -210 west roadway of this face. The site tests results show that using this new backfilling and coal mining integrated technology, the production capacity in the 7606 working face can reach to 283,000 ton a year, and 282,000 ton of solid materials (waste and fly ash) is backfilled, which meets the needs of high production and efficiency. The goaf was compactly backfilled with solid material and the strata behavior was quite desirable, with an actual maximum vertical stress of the backfill body of 5.5 MPa. Backfill body control the movement of overburden within a certain range, and there is no col- lapses of major areas in the overlying strata upon backfilled gob. The maximum subsidence and speed were 231 mm and 15.75 mm/d respectively, which proved the practical significance of this integrated technology. 展开更多
关键词 Fully mechanized backfilling and coalmining technologyHydraulic supportFormed backfilling scraper conveyorbackfilling technologyStrata behaviors
下载PDF
上一页 1 2 228 下一页 到第
使用帮助 返回顶部