Against the backdrop of continuous development in the field of education,universities are encouraged to innovate their talent cultivation systems and objectives.The deep integration of industry and education has emerg...Against the backdrop of continuous development in the field of education,universities are encouraged to innovate their talent cultivation systems and objectives.The deep integration of industry and education has emerged as an effective strategy,aligning with the basic requirements of the new engineering education initiative and exerting a positive impact on socioeconomic development.However,an analysis of the current state of industry-education integration in universities reveals several issues that require optimization,affecting the ultimate effectiveness of integration.To optimize this phenomenon and achieve high-quality development,universities need to further explore the construction of a deep integration model of industry and education,adhering to corresponding principles to form a comprehensive system.On this basis,pathways for deep industry-education integration can be summarized.展开更多
Life Cycle Cost Analysis (LCCA) provides a systematic approach to assess the total cost associated with owning, operating, and maintaining assets throughout their entire life. BIM empowers architects and designers to ...Life Cycle Cost Analysis (LCCA) provides a systematic approach to assess the total cost associated with owning, operating, and maintaining assets throughout their entire life. BIM empowers architects and designers to perform real-time evaluations to explore various design options. However, when integrated with LCCA, BIM provides a comprehensive economic perspective that helps stakeholders understand the long-term financial implications of design decisions. This study presents a methodology for developing a model that seamlessly integrates BIM and LCCA during the conceptual design stage of buildings. This integration allows for a comprehensive evaluation and analysis of the design process, ensuring that the development aligns with the principles of low carbon emissions by employing modular construction, 3D concrete printing methods, and different building design alternatives. The model considers the initial construction costs in addition to all the long-term operational, maintenance, and salvage values. It combines various tools and data through different modules, including energy analysis, Life Cycle Assessment (LCA), and Life Cycle Cost Analysis (LCCA) to execute a comprehensive assessment of the financial implications of a specific design option throughout the lifecycle of building projects. The development of the said model and its implementation involves the creation of a new plug-in for the BIM tool (i.e., Autodesk Revit) to enhance its functionalities and capabilities in forecasting the life-cycle costs of buildings in addition to generating associated cash flows, creating scenarios, and sensitivity analyses in an automatic manner. This model empowers designers to evaluate and justify their initial investments while designing and selecting potential construction methods for buildings, and enabling stakeholders to make informed decisions by assessing different design alternatives based on long-term financial considerations during the early stages of design.展开更多
We estimate tree heights using polarimetric interferometric synthetic aperture radar(PolInSAR)data constructed by the dual-polarization(dual-pol)SAR data and random volume over the ground(RVoG)model.Considering the Se...We estimate tree heights using polarimetric interferometric synthetic aperture radar(PolInSAR)data constructed by the dual-polarization(dual-pol)SAR data and random volume over the ground(RVoG)model.Considering the Sentinel-1 SAR dual-pol(SVV,vertically transmitted and vertically received and SVH,vertically transmitted and horizontally received)configuration,one notes that S_(HH),the horizontally transmitted and horizontally received scattering element,is unavailable.The S_(HH)data were constructed using the SVH data,and polarimetric SAR(PolSAR)data were obtained.The proposed approach was first verified in simulation with satisfactory results.It was next applied to construct PolInSAR data by a pair of dual-pol Sentinel-1A data at Duke Forest,North Carolina,USA.According to local observations and forest descriptions,the range of estimated tree heights was overall reasonable.Comparing the heights with the ICESat-2 tree heights at 23 sampling locations,relative errors of 5 points were within±30%.Errors of 8 points ranged from 30%to 40%,but errors of the remaining 10 points were>40%.The results should be encouraged as error reduction is possible.For instance,the construction of PolSAR data should not be limited to using SVH,and a combination of SVH and SVV should be explored.Also,an ensemble of tree heights derived from multiple PolInSAR data can be considered since tree heights do not vary much with time frame in months or one season.展开更多
This paper describes and provides a critique of the design and implementation of the“scoops”-a set of bespoke multifunctioning architectural free-form elements that are a highlight of the new Soheil Abedian School o...This paper describes and provides a critique of the design and implementation of the“scoops”-a set of bespoke multifunctioning architectural free-form elements that are a highlight of the new Soheil Abedian School of Architecture at Bond University,Australia,by the office of Sir Peter Cook and Gavin Robotham,CRAB(Cook Robotham Architecture Bureau,London).The development includes the transfer of analogue design processes into digital 3d modeling,which is then analyzed and rationalized via an exchange with consultants and procurement contractors.The complexity of the concrete works necessitated the use of digital fabrication to make their implementation affordable and within time constraints,with said complexity creating a variety of challenges for many aspects of the entire delivery team.The 3d model played a critical role in communicating intent and accuracy at all stages.The use of site-based craftsmanship combined with computer aided design and fabrication overlapped to realize the project.展开更多
Rapid urbanization has led to a surge in the number of towering structures,and overturning is widely used because it can better accommodate the construction of shaped structures such as variable sections.The complexit...Rapid urbanization has led to a surge in the number of towering structures,and overturning is widely used because it can better accommodate the construction of shaped structures such as variable sections.The complexity of the construction process makes the construction risk have certain randomness,so this paper proposes a cloudbased coupled matter-element model to address the ambiguity and randomness in the safety risk assessment of overturning construction of towering structures.In the pretended model,the digital eigenvalues of the cloud model are used to replace the eigenvalues in the matter–element basic element,and calculate the cloud correlation of the risk assessment metrics through the correlation algorithm of the cloud model to build the computational model.Meanwhile,the improved hierarchical analysis method based on the cloud model is used to determine the weight of the index.The comprehensive evaluation scores of the evaluation event are then obtained through the weighted average method,and the safety risk level is determined accordingly.Through empirical analysis,(1)the improved hierarchical analysis method based on the cloud model can incorporate the data of multiple decisionmakers into the calculation formula to determine theweights,which makes the assessment resultsmore credible;(2)the evaluation results of the cloud-basedmatter-element coupledmodelmethod are basically consistent with those of the other two commonly used methods,and the confidence factor is less than 0.05,indicating that the cloudbased physical element coupled model method is reasonable and practical for towering structure overturning;(3)the cloud-based coupled element model method,which confirms the reliability of risk level by performing Spearman correlation on comprehensive assessment scores,can provide more comprehensive information of instances compared with other methods,and more comprehensively reflects the fuzzy uncertainty relationship between assessment indexes,which makes the assessment results more realistic,scientific and reliable.展开更多
Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platf...Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platform and the process level of the offshore industry.Currently,qualitymanagement remains in the era of primary information,and there is a lack of effective tracking and recording of welding quality data.When welding defects are encountered,it is difficult to rapidly and accurately determine the root cause of the problem from various complexities and scattered quality data.In this paper,a composite welding quality traceability model for offshore platform block construction process is proposed,it contains the quality early-warning method based on long short-term memory and quality data backtracking query optimization algorithm.By fulfilling the training of the early-warning model and the implementation of the query optimization algorithm,the quality traceability model has the ability to assist enterprises in realizing the rapid identification and positioning of quality problems.Furthermore,the model and the quality traceability algorithm are checked by cases in actual working conditions.Verification analyses suggest that the proposed early-warningmodel for welding quality and the algorithmfor optimizing backtracking requests are effective and can be applied to the actual construction process.展开更多
The acquisition of digital regional-scale information and ecological environmental data has high requirements for structural texture,spatial res-olution,and multiple parameter categories,which is challenging to achiev...The acquisition of digital regional-scale information and ecological environmental data has high requirements for structural texture,spatial res-olution,and multiple parameter categories,which is challenging to achieve using satellite remote sensing.Considering the convenient,facilitative,and flexible characteristics of UAV(unmanned air vehicle)remote sensing tech-nology,this study selects a campus as a typical research area and uses the Pegasus D2000 equipped with a D-MSPC2000 multi-spectral camera and a CAM3000 aerial camera to acquire oblique images and multi-spectral data.Using professional software,including Context Capture,ENVI,and ArcGIS,a 3D(three-dimensional)campus model,a digital orthophoto map,and multi-spectral remote sensing map drawing are realized,and the geometric accuracy of typical feature selection is evaluated.Based on a quantitative remote sensing model,the campus ecological environment assessment is performed from the perspectives of vegetation and water body.The results presented in this study could be of great significance to the scientific management and sustainable development of regional natural resources.展开更多
In order to realize the accurate prediction of the total output value of construction industry in the future,the grey prediction model is used to compare the measured value with the predicted value from 2012 to 2021,a...In order to realize the accurate prediction of the total output value of construction industry in the future,the grey prediction model is used to compare the measured value with the predicted value from 2012 to 2021,and based on the existing data,the total output value of construction industry in Jiangxi Province in the next five years is predicted.The results show that the grey prediction model has a good prediction effect,and the error between the predicted value and the measured value is within 14%,which provides a basis for policy adjustment and resource optimization.展开更多
In tomographic statics seismic data processing, it 1s crucial to cletermme an optimum base for a near-surface model. In this paper, we consider near-surface model base determination as a global optimum problem. Given ...In tomographic statics seismic data processing, it 1s crucial to cletermme an optimum base for a near-surface model. In this paper, we consider near-surface model base determination as a global optimum problem. Given information from uphole shooting and the first-arrival times from a surface seismic survey, we present a near-surface velocity model construction method based on a Monte-Carlo sampling scheme using a layered equivalent medium assumption. Compared with traditional least-squares first-arrival tomography, this scheme can delineate a clearer, weathering-layer base, resulting in a better implementation of damming correction. Examples using synthetic and field data are used to demonstrate the effectiveness of the proposed scheme.展开更多
The application model of epidemic disease assessment technology for Web-based large-scale pig farm was expounded from the identification of epidemic disease risk factors, construction of risk assessment model and deve...The application model of epidemic disease assessment technology for Web-based large-scale pig farm was expounded from the identification of epidemic disease risk factors, construction of risk assessment model and development of risk assessment system. The assessed pig farm uploaded the epidemic disease risk data information through on-line answering evaluating questionnaire to get the immediate evaluation report. The model could enhance the risk communication between pig farm veterinarian, manager and veterinary experts to help farm system understand and find disease risk factors, assess and report the potential high risk items of the pig farm in the three systems of engineering epidemic disease prevention technology, biological safety and immune monitoring, and promote the improvement and perfection of epidemic disease prevention and control measures.展开更多
This study aims to reveal the macroscopic permanent deformation(PD)behavior and the internal structural evolution of construction and demolition waste(CDW)under loading.Firstly,the initial matric suction of CDW was me...This study aims to reveal the macroscopic permanent deformation(PD)behavior and the internal structural evolution of construction and demolition waste(CDW)under loading.Firstly,the initial matric suction of CDW was measured by the filter paper method.Secondly,the PD of CDW with different humidity and stress states was investigated by repeated load triaxial tests,and a comprehensive prediction model was established.Finally,the discrete element method was performed to analyze the internal structural evolution of CDW during deformation.These results showed that the VAN-GENUCHTEN model could describe the soil-water characteristic curve of CDW well.The PD increases with the increase of the deviator stress and the number of cyclic loading,but the opposite trend was observed when the initial matric suction and confining pressure increased.The proposed model in this study provides a satisfactory prediction of PD.The discrete element method could accurately simulate the macroscopic PD of CDW,and the shear force,interlock force and sliding content increase with the increase of deviator stress during the deformation.The research could provide useful reference for the deformation stability analysis of CDW under cyclic loading.展开更多
The method of building 3D model was discussed at first. Aiming at the feature of mine vacant place,a method to build the 3D vacant place model based on multi TIN (triangular irregular network) was put forward, and the...The method of building 3D model was discussed at first. Aiming at the feature of mine vacant place,a method to build the 3D vacant place model based on multi TIN (triangular irregular network) was put forward, and the data structure and visualization of vacant place were discussed. Then some crucial technologies of realizing function in 3D-GIS were proposed. In addition,the software about special 3D mapping and assaying was introduced.展开更多
In the oil and gas industry, operations in greenfield sites are straightforward. However, there are increased risks, such as damage to existing facilities, unknown site conditions, and other complexities in brownfield...In the oil and gas industry, operations in greenfield sites are straightforward. However, there are increased risks, such as damage to existing facilities, unknown site conditions, and other complexities in brownfield sites. In addition to these physical risks, task scheduling is also complex, as vessels need to be replaced during a turnaround. To mitigate the risks of site conditions and realize a truncated schedule for Saudi Aramco’s operations, 3D laser scanning was combined with 3D modeling, clash detection, and time. This integrated approach minimized the shutdown period, which resulted in cost savings, heightened safety, and enhanced stakeholder communications.展开更多
Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses durin...Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses during pile work are to be thought possible. Prior to finishing a site pre-investigation, a foundation’s area is usually sampled for statistical reasons. There are studies on pile construction outside of Bangladesh that are supported by relevant empirical data in the literature. Since Bangladesh, which is regarded as a third-world country, is ignored in this regard, the literature currently available about pile building and the associated productivity loss is unable to provide adequate information or appropriate empirical data. Due to this pile-building sector in Bangladesh has been experiencing a decline in production for quite some time now. Before attempting to increase productivity in pile construction, it is essential to investigate the potential losses and the variables that might have an influence. This study aims to accomplish the following objectives: 1) identify the primary factors that have an impact on pile construction;2) develop an SVR model that accurately predicts productivity loss;and 3) figure out the projected loss by basing it on the historical scenario that is the most comparable to the current one. A Support Vector Regression (SVR) model was developed after a study of the relevant literature. This model enabled the collection of 110 pile building projects from five significant locations in Bangladesh. The model was constructed using a list of eight inputs in addition to a list of five macro elements (labor, management, environment, material, and equipment) (soil condition, pile type, pile material, project size, project location, pile depth, pile quantity, and equipment quantity). Using 10-way cross validation, the SVR achieves an accuracy of 87.2% in its predictions. On the basis of what has occurred in the past, we are able to estimate that there will be a loss of around 18.55 percent of the total output. A new perspective for engineers studying the delay factors with productivity loss is provided by the outcome of important tasks as it relates to loss in productivity and overall factors faced. In the building construction industry, effective management should place more emphasis on the correlation between productivity loss and the factors that cause it. Therefore, to represent the effect on productivity loss, real factors can be summed up as a decline in productivity loss. The findings of the study would urge specialists to concentrate on waste as a means of increasing overall production.展开更多
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
Basic conditions and new countryside construction of Ganlu Town, Zizhong County, Neijiang City were analyzed, SWOT adopted to analyze internal strengths, weaknesses, external opportunities and threats of its new count...Basic conditions and new countryside construction of Ganlu Town, Zizhong County, Neijiang City were analyzed, SWOT adopted to analyze internal strengths, weaknesses, external opportunities and threats of its new countryside construction. On this basis, positive and practical strategies were put forward to promote the new countryside construction in the local area, and provide references for the new countryside construction in other regions.展开更多
Geometric model construction is the basis of infrared image theory simulation. Taking the construction of the geometric model of one building in Harbin as an example, this paper analyzes the theoretical groundings of ...Geometric model construction is the basis of infrared image theory simulation. Taking the construction of the geometric model of one building in Harbin as an example, this paper analyzes the theoretical groundings of simplification and principles of geometric model construction of buildings. It then discusses some particular treatment methods in calculating the radiation transfer coefficient in geometric model construction using the Monte Carlo Method.展开更多
In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific ...In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.展开更多
Vocational education is an important way in the current talent training.It shoulders the heavy responsibility of transporting talents for the society.With the acceleration of urbanization construction and the developm...Vocational education is an important way in the current talent training.It shoulders the heavy responsibility of transporting talents for the society.With the acceleration of urbanization construction and the development of industrial technology,the demand for High Tech Talents in construction projects is constantly increasing.It is necessary to strengthen the improvement of vocational education in construction engineering.This paper mainly analyzes the mode of vocational education in construction engineering.展开更多
基金2023 Annual Project of the China Association for Construction Education“Research on the Development Path of Private Colleges and Industry Integration in Liaoning Province Under the Strategy of Intelligent Manufacturing Strong Province”(Project number:2023239)。
文摘Against the backdrop of continuous development in the field of education,universities are encouraged to innovate their talent cultivation systems and objectives.The deep integration of industry and education has emerged as an effective strategy,aligning with the basic requirements of the new engineering education initiative and exerting a positive impact on socioeconomic development.However,an analysis of the current state of industry-education integration in universities reveals several issues that require optimization,affecting the ultimate effectiveness of integration.To optimize this phenomenon and achieve high-quality development,universities need to further explore the construction of a deep integration model of industry and education,adhering to corresponding principles to form a comprehensive system.On this basis,pathways for deep industry-education integration can be summarized.
文摘Life Cycle Cost Analysis (LCCA) provides a systematic approach to assess the total cost associated with owning, operating, and maintaining assets throughout their entire life. BIM empowers architects and designers to perform real-time evaluations to explore various design options. However, when integrated with LCCA, BIM provides a comprehensive economic perspective that helps stakeholders understand the long-term financial implications of design decisions. This study presents a methodology for developing a model that seamlessly integrates BIM and LCCA during the conceptual design stage of buildings. This integration allows for a comprehensive evaluation and analysis of the design process, ensuring that the development aligns with the principles of low carbon emissions by employing modular construction, 3D concrete printing methods, and different building design alternatives. The model considers the initial construction costs in addition to all the long-term operational, maintenance, and salvage values. It combines various tools and data through different modules, including energy analysis, Life Cycle Assessment (LCA), and Life Cycle Cost Analysis (LCCA) to execute a comprehensive assessment of the financial implications of a specific design option throughout the lifecycle of building projects. The development of the said model and its implementation involves the creation of a new plug-in for the BIM tool (i.e., Autodesk Revit) to enhance its functionalities and capabilities in forecasting the life-cycle costs of buildings in addition to generating associated cash flows, creating scenarios, and sensitivity analyses in an automatic manner. This model empowers designers to evaluate and justify their initial investments while designing and selecting potential construction methods for buildings, and enabling stakeholders to make informed decisions by assessing different design alternatives based on long-term financial considerations during the early stages of design.
文摘We estimate tree heights using polarimetric interferometric synthetic aperture radar(PolInSAR)data constructed by the dual-polarization(dual-pol)SAR data and random volume over the ground(RVoG)model.Considering the Sentinel-1 SAR dual-pol(SVV,vertically transmitted and vertically received and SVH,vertically transmitted and horizontally received)configuration,one notes that S_(HH),the horizontally transmitted and horizontally received scattering element,is unavailable.The S_(HH)data were constructed using the SVH data,and polarimetric SAR(PolSAR)data were obtained.The proposed approach was first verified in simulation with satisfactory results.It was next applied to construct PolInSAR data by a pair of dual-pol Sentinel-1A data at Duke Forest,North Carolina,USA.According to local observations and forest descriptions,the range of estimated tree heights was overall reasonable.Comparing the heights with the ICESat-2 tree heights at 23 sampling locations,relative errors of 5 points were within±30%.Errors of 8 points ranged from 30%to 40%,but errors of the remaining 10 points were>40%.The results should be encouraged as error reduction is possible.For instance,the construction of PolSAR data should not be limited to using SVH,and a combination of SVH and SVV should be explored.Also,an ensemble of tree heights derived from multiple PolInSAR data can be considered since tree heights do not vary much with time frame in months or one season.
文摘This paper describes and provides a critique of the design and implementation of the“scoops”-a set of bespoke multifunctioning architectural free-form elements that are a highlight of the new Soheil Abedian School of Architecture at Bond University,Australia,by the office of Sir Peter Cook and Gavin Robotham,CRAB(Cook Robotham Architecture Bureau,London).The development includes the transfer of analogue design processes into digital 3d modeling,which is then analyzed and rationalized via an exchange with consultants and procurement contractors.The complexity of the concrete works necessitated the use of digital fabrication to make their implementation affordable and within time constraints,with said complexity creating a variety of challenges for many aspects of the entire delivery team.The 3d model played a critical role in communicating intent and accuracy at all stages.The use of site-based craftsmanship combined with computer aided design and fabrication overlapped to realize the project.
基金funded by China Railway No.21 Bureau Group No.1 Engineering Co.,Ltd.,Grant No.202209140002.
文摘Rapid urbanization has led to a surge in the number of towering structures,and overturning is widely used because it can better accommodate the construction of shaped structures such as variable sections.The complexity of the construction process makes the construction risk have certain randomness,so this paper proposes a cloudbased coupled matter-element model to address the ambiguity and randomness in the safety risk assessment of overturning construction of towering structures.In the pretended model,the digital eigenvalues of the cloud model are used to replace the eigenvalues in the matter–element basic element,and calculate the cloud correlation of the risk assessment metrics through the correlation algorithm of the cloud model to build the computational model.Meanwhile,the improved hierarchical analysis method based on the cloud model is used to determine the weight of the index.The comprehensive evaluation scores of the evaluation event are then obtained through the weighted average method,and the safety risk level is determined accordingly.Through empirical analysis,(1)the improved hierarchical analysis method based on the cloud model can incorporate the data of multiple decisionmakers into the calculation formula to determine theweights,which makes the assessment resultsmore credible;(2)the evaluation results of the cloud-basedmatter-element coupledmodelmethod are basically consistent with those of the other two commonly used methods,and the confidence factor is less than 0.05,indicating that the cloudbased physical element coupled model method is reasonable and practical for towering structure overturning;(3)the cloud-based coupled element model method,which confirms the reliability of risk level by performing Spearman correlation on comprehensive assessment scores,can provide more comprehensive information of instances compared with other methods,and more comprehensively reflects the fuzzy uncertainty relationship between assessment indexes,which makes the assessment results more realistic,scientific and reliable.
基金funded by Ministry of Industry and Information Technology of the People’s Republic of China[Grant No.2018473].
文摘Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platform and the process level of the offshore industry.Currently,qualitymanagement remains in the era of primary information,and there is a lack of effective tracking and recording of welding quality data.When welding defects are encountered,it is difficult to rapidly and accurately determine the root cause of the problem from various complexities and scattered quality data.In this paper,a composite welding quality traceability model for offshore platform block construction process is proposed,it contains the quality early-warning method based on long short-term memory and quality data backtracking query optimization algorithm.By fulfilling the training of the early-warning model and the implementation of the query optimization algorithm,the quality traceability model has the ability to assist enterprises in realizing the rapid identification and positioning of quality problems.Furthermore,the model and the quality traceability algorithm are checked by cases in actual working conditions.Verification analyses suggest that the proposed early-warningmodel for welding quality and the algorithmfor optimizing backtracking requests are effective and can be applied to the actual construction process.
基金supported by the National Natural Science Foundation of China (Grant No.42171311)the Open Fund of State Key Laboratory of Remote Sensing Science (Grant No.OFSLRSS202218)+1 种基金the Key Research and Development Program of the Hainan Province,China (Grant No.ZDYF2021SHFZ105)the Training Program of Excellent Master Thesis of Zhejiang Ocean University.
文摘The acquisition of digital regional-scale information and ecological environmental data has high requirements for structural texture,spatial res-olution,and multiple parameter categories,which is challenging to achieve using satellite remote sensing.Considering the convenient,facilitative,and flexible characteristics of UAV(unmanned air vehicle)remote sensing tech-nology,this study selects a campus as a typical research area and uses the Pegasus D2000 equipped with a D-MSPC2000 multi-spectral camera and a CAM3000 aerial camera to acquire oblique images and multi-spectral data.Using professional software,including Context Capture,ENVI,and ArcGIS,a 3D(three-dimensional)campus model,a digital orthophoto map,and multi-spectral remote sensing map drawing are realized,and the geometric accuracy of typical feature selection is evaluated.Based on a quantitative remote sensing model,the campus ecological environment assessment is performed from the perspectives of vegetation and water body.The results presented in this study could be of great significance to the scientific management and sustainable development of regional natural resources.
文摘In order to realize the accurate prediction of the total output value of construction industry in the future,the grey prediction model is used to compare the measured value with the predicted value from 2012 to 2021,and based on the existing data,the total output value of construction industry in Jiangxi Province in the next five years is predicted.The results show that the grey prediction model has a good prediction effect,and the error between the predicted value and the measured value is within 14%,which provides a basis for policy adjustment and resource optimization.
基金funded by the National Science VIP specialized project of China(Grant No.2011ZX05025-001-03)by the National Science Foundation of China(Grant No.41274117)
文摘In tomographic statics seismic data processing, it 1s crucial to cletermme an optimum base for a near-surface model. In this paper, we consider near-surface model base determination as a global optimum problem. Given information from uphole shooting and the first-arrival times from a surface seismic survey, we present a near-surface velocity model construction method based on a Monte-Carlo sampling scheme using a layered equivalent medium assumption. Compared with traditional least-squares first-arrival tomography, this scheme can delineate a clearer, weathering-layer base, resulting in a better implementation of damming correction. Examples using synthetic and field data are used to demonstrate the effectiveness of the proposed scheme.
基金Supported by the Fund Program of Jiangsu Academy of Agricultural Sciences(6111689)the Planning Program of"the Twelfth Five-year-plan"in National Science and Technology for the Rural Developme+nt in China(2015BAD12B04-1.2)the Fund for Independent Innovation of Agricultural Science and Technology of Jiangsu Province[CX(16)1006]~~
文摘The application model of epidemic disease assessment technology for Web-based large-scale pig farm was expounded from the identification of epidemic disease risk factors, construction of risk assessment model and development of risk assessment system. The assessed pig farm uploaded the epidemic disease risk data information through on-line answering evaluating questionnaire to get the immediate evaluation report. The model could enhance the risk communication between pig farm veterinarian, manager and veterinary experts to help farm system understand and find disease risk factors, assess and report the potential high risk items of the pig farm in the three systems of engineering epidemic disease prevention technology, biological safety and immune monitoring, and promote the improvement and perfection of epidemic disease prevention and control measures.
基金Project(52025085)supported by the National Science Fund for Distinguished Young Scholars,ChinaProjects(51927814,51878078)supported by the National Natural Science Foundation of China+3 种基金Project(2018-025)supported by the Training Program for High-level Technical Personnel in Transportation Industry,ChinaProject(CTKY-PTRC 2018-003)supported by the Design Theory,Method and Demonstration of Durability Asphalt Pavement Based on Heavy-duty Traffic Conditions in Shanghai Area,ChinaProject(2020RC4048)supported by the Science and Technology Innovation Program of Hunan Province,ChinaProject(SJCX202001)supported by the Construction Project for Graduate Students of Changsha University of Science&Technology,China。
文摘This study aims to reveal the macroscopic permanent deformation(PD)behavior and the internal structural evolution of construction and demolition waste(CDW)under loading.Firstly,the initial matric suction of CDW was measured by the filter paper method.Secondly,the PD of CDW with different humidity and stress states was investigated by repeated load triaxial tests,and a comprehensive prediction model was established.Finally,the discrete element method was performed to analyze the internal structural evolution of CDW during deformation.These results showed that the VAN-GENUCHTEN model could describe the soil-water characteristic curve of CDW well.The PD increases with the increase of the deviator stress and the number of cyclic loading,but the opposite trend was observed when the initial matric suction and confining pressure increased.The proposed model in this study provides a satisfactory prediction of PD.The discrete element method could accurately simulate the macroscopic PD of CDW,and the shear force,interlock force and sliding content increase with the increase of deviator stress during the deformation.The research could provide useful reference for the deformation stability analysis of CDW under cyclic loading.
文摘The method of building 3D model was discussed at first. Aiming at the feature of mine vacant place,a method to build the 3D vacant place model based on multi TIN (triangular irregular network) was put forward, and the data structure and visualization of vacant place were discussed. Then some crucial technologies of realizing function in 3D-GIS were proposed. In addition,the software about special 3D mapping and assaying was introduced.
文摘In the oil and gas industry, operations in greenfield sites are straightforward. However, there are increased risks, such as damage to existing facilities, unknown site conditions, and other complexities in brownfield sites. In addition to these physical risks, task scheduling is also complex, as vessels need to be replaced during a turnaround. To mitigate the risks of site conditions and realize a truncated schedule for Saudi Aramco’s operations, 3D laser scanning was combined with 3D modeling, clash detection, and time. This integrated approach minimized the shutdown period, which resulted in cost savings, heightened safety, and enhanced stakeholder communications.
文摘Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses during pile work are to be thought possible. Prior to finishing a site pre-investigation, a foundation’s area is usually sampled for statistical reasons. There are studies on pile construction outside of Bangladesh that are supported by relevant empirical data in the literature. Since Bangladesh, which is regarded as a third-world country, is ignored in this regard, the literature currently available about pile building and the associated productivity loss is unable to provide adequate information or appropriate empirical data. Due to this pile-building sector in Bangladesh has been experiencing a decline in production for quite some time now. Before attempting to increase productivity in pile construction, it is essential to investigate the potential losses and the variables that might have an influence. This study aims to accomplish the following objectives: 1) identify the primary factors that have an impact on pile construction;2) develop an SVR model that accurately predicts productivity loss;and 3) figure out the projected loss by basing it on the historical scenario that is the most comparable to the current one. A Support Vector Regression (SVR) model was developed after a study of the relevant literature. This model enabled the collection of 110 pile building projects from five significant locations in Bangladesh. The model was constructed using a list of eight inputs in addition to a list of five macro elements (labor, management, environment, material, and equipment) (soil condition, pile type, pile material, project size, project location, pile depth, pile quantity, and equipment quantity). Using 10-way cross validation, the SVR achieves an accuracy of 87.2% in its predictions. On the basis of what has occurred in the past, we are able to estimate that there will be a loss of around 18.55 percent of the total output. A new perspective for engineers studying the delay factors with productivity loss is provided by the outcome of important tasks as it relates to loss in productivity and overall factors faced. In the building construction industry, effective management should place more emphasis on the correlation between productivity loss and the factors that cause it. Therefore, to represent the effect on productivity loss, real factors can be summed up as a decline in productivity loss. The findings of the study would urge specialists to concentrate on waste as a means of increasing overall production.
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘Basic conditions and new countryside construction of Ganlu Town, Zizhong County, Neijiang City were analyzed, SWOT adopted to analyze internal strengths, weaknesses, external opportunities and threats of its new countryside construction. On this basis, positive and practical strategies were put forward to promote the new countryside construction in the local area, and provide references for the new countryside construction in other regions.
文摘Geometric model construction is the basis of infrared image theory simulation. Taking the construction of the geometric model of one building in Harbin as an example, this paper analyzes the theoretical groundings of simplification and principles of geometric model construction of buildings. It then discusses some particular treatment methods in calculating the radiation transfer coefficient in geometric model construction using the Monte Carlo Method.
基金Key Subject of Ministry of Railway Technology Research and Development Program(No.2011G010-D)Central University Funds for Basic Research(No.SWJTU12ZT12)
文摘In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.
文摘Vocational education is an important way in the current talent training.It shoulders the heavy responsibility of transporting talents for the society.With the acceleration of urbanization construction and the development of industrial technology,the demand for High Tech Talents in construction projects is constantly increasing.It is necessary to strengthen the improvement of vocational education in construction engineering.This paper mainly analyzes the mode of vocational education in construction engineering.