期刊文献+
共找到6篇文章
< 1 >
每页显示 20 50 100
Generalized multiple time windows model based parallel machine scheduling for TDRSS 被引量:1
1
作者 林鹏 匡麟玲 +3 位作者 陈翔 晏坚 陆建华 王小娟 《Journal of Beijing Institute of Technology》 EI CAS 2016年第3期382-391,共10页
The scheduling efficiency of the tracking and data relay satellite system(TDRSS)is strictly limited by the scheduling degrees of freedom(DoF),including time DoF defined by jobs' flexible time windows and spatial ... The scheduling efficiency of the tracking and data relay satellite system(TDRSS)is strictly limited by the scheduling degrees of freedom(DoF),including time DoF defined by jobs' flexible time windows and spatial DoF brought by multiple servable tracking and data relay satellites(TDRSs).In this paper,ageneralized multiple time windows(GMTW)model is proposed to fully exploit the time and spatial DoF.Then,the improvements of service capability and job-completion probability based on the GMTW are theoretically proved.Further,an asymmetric path-relinking(APR)based heuristic job scheduling framework is presented to maximize the usage of DoF provided by the GMTW.Simulation results show that by using our proposal 11%improvement of average jobcompletion probability can be obtained.Meanwhile,the computing time of the time-to-target can be shorten to 1/9 of the GRASP. 展开更多
关键词 parallel machine scheduling problem with generalized multiple time windows (PMGMTW) positive/negative adaptive subsequence adjustment (p/n-ASA) evolutionary asymmetric key-path-relinking (EvAKPR)
下载PDF
ANALYSIS AND IMPROVEMENT OF LEAD TIME FOR JOB SHOP UNDER MIXED PRODUCTION SYSTEM 被引量:1
2
作者 CHE Jianguo HE Zhen EDWARD M Knod 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2006年第4期487-491,共5页
Firstly an overview of the potential impact on work-in-process (WIP) and lead time is provided when transfer lot sizes are undifferentiated from processing lot sizes. Simple performance examples are compared to thos... Firstly an overview of the potential impact on work-in-process (WIP) and lead time is provided when transfer lot sizes are undifferentiated from processing lot sizes. Simple performance examples are compared to those from a shop with one-piece transfer lots. Next, a mathematical programming model for minimizing lead time in the mixed-model job shop is presented, in which one-piece transfer lots are used. Key factors affecting lead time are found by analyzing the sum of the longest setup time of individual items among the shared processes (SLST) and the longest processing time of individual items among processes (LPT). And lead time can be minimized by cutting down the SLST and LPT. Reduction of the SLST is described as a traveling salesman problem (TSP), and the minimum of the SLST is solved through job shop scheduling. Removing the bottleneck and leveling the production line optimize the LPT. If the number of items produced is small, the routings are relatively short, and items and facilities are changed infrequently, the optimal schedule will remain valid. Finally a brief example serves to illustrate the method. 展开更多
关键词 Lead time Work-in-process(WIP) Mixed production system Job shop scheduling problem Traveling salesman problem(TSP)
下载PDF
Adaptive subsequence adjustment with evolutionary asymmetric path-relinking for TDRSS scheduling 被引量:12
3
作者 Peng Lin Linling Kuang +3 位作者 Xiang Chen Jian Yan Jianhua Lu Xiaojuan Wang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2014年第5期800-810,共11页
Due to the limited transmission resources for data relay in the tracking and data relay satellite system (TDRSS), there are many job requirements in busy days which will be discarded in the conventional job scheduli... Due to the limited transmission resources for data relay in the tracking and data relay satellite system (TDRSS), there are many job requirements in busy days which will be discarded in the conventional job scheduling model. Therefore, the improvement of scheduling efficiency in the TDRSS can not only help to increase the resource utilities, but also to reduce the scheduling failure ratio. A model of nonhomogeneous parallel machines scheduling problems with time window (NPM-TW) is firstly built up for the TDRSS, considering the distinct features of the variable preparation time and the nonhomogeneous transmission rates for different types of antennas on each tracking and data relay satellite (TDRS). Then, an adaptive subsequence adjustment (ASA) framework with evolutionary asymmetric path-relinking (EvAPR) is proposed to solve this problem, in which an asymmetric progressive crossover operation is involved to overcome the local optima by the conventional job inserting methods. The numerical results show that, compared with the classical greedy randomized adaptive search procedure (GRASP) algorithm, the scheduling failure ratio of jobs can be reduced over 11% on average by the proposed ASA with EvAPR. 展开更多
关键词 nonhomogeneous parallel machines scheduling problem with time window (NPM-TW) adaptive subsequence adjustment (ASA) asymmetric path-relinking (APR) evolutionary asymmetric path-relinking (EvAPR).
下载PDF
Self-adaptive large neighborhood search algorithm for parallel machine scheduling problems 被引量:7
4
作者 Pei Wang Gerhard Reinelt Yuejin Tan 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2012年第2期208-215,共8页
A self-adaptive large neighborhood search method for scheduling n jobs on m non-identical parallel machines with mul- tiple time windows is presented. The problems' another feature lies in oversubscription, namely no... A self-adaptive large neighborhood search method for scheduling n jobs on m non-identical parallel machines with mul- tiple time windows is presented. The problems' another feature lies in oversubscription, namely not all jobs can be scheduled within specified scheduling horizons due to the limited machine capacity. The objective is thus to maximize the overall profits of processed jobs while respecting machine constraints. A first-in- first-out heuristic is applied to find an initial solution, and then a large neighborhood search procedure is employed to relax and re- optimize cumbersome solutions. A machine learning mechanism is also introduced to converge on the most efficient neighborhoods for the problem. Extensive computational results are presented based on data from an application involving the daily observation scheduling of a fleet of earth observing satellites. The method rapidly solves most problem instances to optimal or near optimal and shows a robust performance in sensitive analysis. 展开更多
关键词 non-identical parallel machine scheduling problem with multiple time windows (NPMSPMTW) oversubscribed self- adaptive large neighborhood search (SALNS) machine learning.
下载PDF
RECONFIGURABLE PRODUCTION LINE MODELING AND SCHEDULING USING PETRI NETS AND GENETIC ALGORITHM 被引量:8
5
作者 XIE Nan LI Aiping 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2006年第3期362-367,共6页
In response to the production capacity and functionality variations, a genetic algorithm (GA) embedded with deterministic timed Petri nets(DTPN) for reconfigurable production line(RPL) is proposed to solve its s... In response to the production capacity and functionality variations, a genetic algorithm (GA) embedded with deterministic timed Petri nets(DTPN) for reconfigurable production line(RPL) is proposed to solve its scheduling problem. The basic DTPN modules are presented to model the corresponding variable structures in RPL, and then the scheduling model of the whole RPL is constructed. And in the scheduling algorithm, firing sequences of the Petri nets model are used as chromosomes, thus the selection, crossover, and mutation operator do not deal with the elements in the problem space, but the elements of Petri nets model. Accordingly, all the algorithms for GA operations embedded with Petri nets model are proposed. Moreover, the new weighted single-objective optimization based on reconfiguration cost and E/T is used. The results of a DC motor RPL scheduling suggest that the presented DTPN-GA scheduling algorithm has a significant impact on RPL scheduling, and provide obvious improvements over the conventional scheduling method in practice that meets duedate, minimizes reconfiguration cost, and enhances cost effectivity. 展开更多
关键词 Reconfigurable production line Deterministic timed Petri nets (DTPN) Modeling Scheduling Genetic algorithm(GA)
下载PDF
Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times 被引量:2
6
作者 Pankaj SHARMA Ajai JAIN 《Frontiers of Mechanical Engineering》 SCIE CSCD 2014年第4期380-389,共10页
Stochastic dynamic job shop scheduling pro- blem with consideration of sequence-dependent setup times are among the most difficult classes of scheduling problems. This paper assesses the performance of nine dispatchin... Stochastic dynamic job shop scheduling pro- blem with consideration of sequence-dependent setup times are among the most difficult classes of scheduling problems. This paper assesses the performance of nine dispatching rules in such shop from makespan, mean flow time, maximum flow time, mean tardiness, maximum tardiness, number of tardy jobs, total setups and mean setup time performance measures viewpoint. A discrete event simulation model of a stochastic dynamic job shop manufacturing system is developed for investigation purpose. Nine dispatching rules identified from literature are incorporated in the simulation model. The simulation experiments are conducted under due date tightness factor of 3, shop utilization percentage of 90 % and setup times less than processing times. Results indicate that shortest setup time (SIMSET) rule provides the best performance for mean flow time and number of tardy jobs measures. The job with similar setup and modified earliest due date (JMEDD) rule provides the best performance for make- span, maximum flow time, mean tardiness, maximum tardiness, total setups and mean setup time measures. 展开更多
关键词 scheduling sequence-dependent setuptionstochastic dynamic job shop times dispatching rule SIMULATION
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部