Air channeling in the annulus between the casing and the cement sheath and/or between the cement sheath and formation is the main factor affecting the safe operation of natural gas wells at high temperatures and press...Air channeling in the annulus between the casing and the cement sheath and/or between the cement sheath and formation is the main factor affecting the safe operation of natural gas wells at high temperatures and pressures.Prevention of this problem requires,in general,excellent anti-channeling performances of the cement sheath.Three methods to predict such anti-channeling performances are proposed here,which use the weightless pressure of cement slurry,the permeability of cement stone and the volume expansion rate of cement sheath as input parameters.Guided by this approach,the anti-channeling performances of the cement slurry are evaluated by means of indoor experiments,and the cement slurry is optimized accordingly.The results show that the dangerous transition time of the cement slurry with optimized dosage of admixture is only 76 min,the permeability of cement stone is 0.005 md,the volume shrinkage at final setting is only 0.72%,and the anti-channeling performances are therefore maximized.The effective utilization of the optimized cement slurry in some representative wells(LD10–1-A1 and LD10–1-A2 in LD10–1 gas field)is also discussed.展开更多
Organic rich dark shale of Q Formation can be found in many areas(e.g.,in the North of S Basin).The shale target stratum is easy to hydrate and often undergoes spallation.Therefore,centering the casing in the horizont...Organic rich dark shale of Q Formation can be found in many areas(e.g.,in the North of S Basin).The shale target stratum is easy to hydrate and often undergoes spallation.Therefore,centering the casing in the horizontal section of the irregular borehole is relatively difficult.Similarly,achieving a good cementflushing efficiency under complex borehole conditions is a complex task.Through technologies such as centralizer,efficient preflushing,multi-stageflushing and ductile cement slurry,better performances can be achieved.In this study,it is shown that the cementing rate in the DY2H horizontal section is 97.8%,which is more than 34%higher than that of adjacent wells.This cementing matching technology for sidetracking horizontal wells can be used to improve the cementing quality of continental shale and provides a reference for future applications in thisfield.展开更多
基金funded by the CNOOC Scientific Research Project“Study of cementing key properties and its matching technology of LD-10 gas field”(Grant No.CCL2019ZJFN1227).
文摘Air channeling in the annulus between the casing and the cement sheath and/or between the cement sheath and formation is the main factor affecting the safe operation of natural gas wells at high temperatures and pressures.Prevention of this problem requires,in general,excellent anti-channeling performances of the cement sheath.Three methods to predict such anti-channeling performances are proposed here,which use the weightless pressure of cement slurry,the permeability of cement stone and the volume expansion rate of cement sheath as input parameters.Guided by this approach,the anti-channeling performances of the cement slurry are evaluated by means of indoor experiments,and the cement slurry is optimized accordingly.The results show that the dangerous transition time of the cement slurry with optimized dosage of admixture is only 76 min,the permeability of cement stone is 0.005 md,the volume shrinkage at final setting is only 0.72%,and the anti-channeling performances are therefore maximized.The effective utilization of the optimized cement slurry in some representative wells(LD10–1-A1 and LD10–1-A2 in LD10–1 gas field)is also discussed.
基金funded by the CNPC Science and Technology Department Project(2021ZZ10-03)。
文摘Organic rich dark shale of Q Formation can be found in many areas(e.g.,in the North of S Basin).The shale target stratum is easy to hydrate and often undergoes spallation.Therefore,centering the casing in the horizontal section of the irregular borehole is relatively difficult.Similarly,achieving a good cementflushing efficiency under complex borehole conditions is a complex task.Through technologies such as centralizer,efficient preflushing,multi-stageflushing and ductile cement slurry,better performances can be achieved.In this study,it is shown that the cementing rate in the DY2H horizontal section is 97.8%,which is more than 34%higher than that of adjacent wells.This cementing matching technology for sidetracking horizontal wells can be used to improve the cementing quality of continental shale and provides a reference for future applications in thisfield.