In order to improve the reliability of fault identification of the double-circuit transmission lines on the same tower, a new algorithm for fast protection of double-circuit transmission lines on the same tower based ...In order to improve the reliability of fault identification of the double-circuit transmission lines on the same tower, a new algorithm for fast protection of double-circuit transmission lines on the same tower based on the reactive powers of traveling wave is proposed. With the implementation of S-transform, the initial traveling wave reactive powers are calculated and the change characteristics of reactive power under different fault conditions are studied. The protection criterion is constructed by analyzing the ratio of the reactive powers of the same end on double-circuit transmission lines and the ratio of the reactive powers at both ends on the same line. According to the ratio of reactive power on the same side of the line and both ends of the same line, it is possible to identify whether the faults of the double-circuit line of the same tower occurred in or out of the protection zone. A large number of simulation results show that the protection performance is sensitive and reliable, and quick to respond. The criterion is simple and is basically not affected by fault initial angles, fault types, and transitional resistances.展开更多
以国内首条20 mm重冰区500 k V同塔双回线路——茂茂线为依托,利用数值模拟方法对各种脱冰工况下导线脱冰动力响应进行研究,得出了导线脱冰跳跃高度和横摆距离工程实用化公式,并总结出脱冰过程中杆塔动力荷载变化规律。在此基础上对20 m...以国内首条20 mm重冰区500 k V同塔双回线路——茂茂线为依托,利用数值模拟方法对各种脱冰工况下导线脱冰动力响应进行研究,得出了导线脱冰跳跃高度和横摆距离工程实用化公式,并总结出脱冰过程中杆塔动力荷载变化规律。在此基础上对20 mm重冰区500 k V同塔双回线路路径选择、绝缘配置、塔头尺寸控制条件、铁塔荷载和铁塔型式等方面进行研究,基本理清了重冰区同塔双回线路的设计方法和思路,可为后续重冰同塔双回线路设计提供重要参考。展开更多
文摘In order to improve the reliability of fault identification of the double-circuit transmission lines on the same tower, a new algorithm for fast protection of double-circuit transmission lines on the same tower based on the reactive powers of traveling wave is proposed. With the implementation of S-transform, the initial traveling wave reactive powers are calculated and the change characteristics of reactive power under different fault conditions are studied. The protection criterion is constructed by analyzing the ratio of the reactive powers of the same end on double-circuit transmission lines and the ratio of the reactive powers at both ends on the same line. According to the ratio of reactive power on the same side of the line and both ends of the same line, it is possible to identify whether the faults of the double-circuit line of the same tower occurred in or out of the protection zone. A large number of simulation results show that the protection performance is sensitive and reliable, and quick to respond. The criterion is simple and is basically not affected by fault initial angles, fault types, and transitional resistances.
文摘以国内首条20 mm重冰区500 k V同塔双回线路——茂茂线为依托,利用数值模拟方法对各种脱冰工况下导线脱冰动力响应进行研究,得出了导线脱冰跳跃高度和横摆距离工程实用化公式,并总结出脱冰过程中杆塔动力荷载变化规律。在此基础上对20 mm重冰区500 k V同塔双回线路路径选择、绝缘配置、塔头尺寸控制条件、铁塔荷载和铁塔型式等方面进行研究,基本理清了重冰区同塔双回线路的设计方法和思路,可为后续重冰同塔双回线路设计提供重要参考。