期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Trial Demonstration of SupervisionDuring the Quality Guaranteed Period in Construction of Power Plant
1
作者 Peng Shumei Yu Baoxing(Northwest Electric Beijing-Sargent & LundyPower Design Institute Power Engineering Co.. Ltd.) 《Electricity》 1998年第3期34-37,共4页
The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the mon... The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the monitor of the operation and maintenance of power plant,organization of subcontractor to treat the problems and defects occurred in the field in time, technical consultancy and communication in time, delivery of spare parts, and assistance of clearing Contractor’s quality deposit. It is proved by the practice that it is necessary to early out the supervision during quality guaranteed period. 展开更多
关键词 trial demonstration of SupervisionDuring the Quality Guaranteed Period in Construction of Power Plant
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部