期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Precast steel—UHPC lightweight composite bridge for accelerated bridge construction 被引量:1
1
作者 Shuwen DENG Xudong SHAO +2 位作者 Xudong ZHAO Yang WANG Yan WANG 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2021年第2期364-377,共14页
In this study,a fully precast steel—ultrahigh performance concrete(UHPC)lightweight composite bridge(LWCB)was proposed based on Mapu Bridge,aiming at accelerating construction in bridge engineering.Cast-in-place join... In this study,a fully precast steel—ultrahigh performance concrete(UHPC)lightweight composite bridge(LWCB)was proposed based on Mapu Bridge,aiming at accelerating construction in bridge engineering.Cast-in-place joints are generally the controlling factor of segmental structures.Therefore,an innovative girder-to-girder joint that is suitable for LWCB was developed.A specimen consisting of two prefabricated steel—UHPC composite girder parts and one post-cast joint part was fabricated to determine if the joint can effectively transfer load between girders.The flexural behavior of the specimen under a negative bending moment was explored.Finite element analyses of Mapu Bridge showed that the nominal stress of critical sections could meet the required stress,indicating that the design is reasonable.The fatigue performance of the UHPC deck was assessed based on past research,and results revealed that the fatigue performance could meet the design requirements.Based on the test results,a crack width prediction method for the joint interface,a simplified calculation method for the design moment,and a deflection calculation method for the steel—UHPC composite girder in consideration of the UHPC tensile stiffness effect were presented.Good agreements were achieved between the predicted values and test results. 展开更多
关键词 accelerated bridge construction ultrahigh-performance concrete steel—uhpc composite bridge uhpc girder-to-girder joint
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部