A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to...A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.展开更多
To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cas...To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cases demonstrate thatan I-ORA is necessary because it provides accurate handlingof the coupling between transmission and distribution networks,accurate analysis of power supply mode (PSM) changes ofimportant users and helps to improve security and stability ofpower grid operations. Two key technical requirements in theI-ORA algorithm are realized, i.e., integrated topology analysisand integrated power flow calculation. Under a certain contingency, integrated topology analysis is used to assess the risksof substation power cuts, network split and PSM changes ofimportant users, while the integrated power flow calculation,based on the self-adaptive Levenburg-Marquard method andNewton method, can be implemented to assess risks of heavyload/overload and voltage deviation. In addition, the graphicsprocessing unit is used to parallelly process some computationintensive steps. Numerical experiments show that the proposedI-ORA algorithm can realize accurate assessment for the entireI-T&D. In addition, the efficiency and convergence are satisfying,indicating the proposed I-ORA algorithm can significantly benefitreal practice in the coordination operation of I-T&D in the future.展开更多
为解决作业工具管理与使用效率不高的问题,提高配网不停电作业精益化工作水平,以某市10 k V配电线路检修改造项目为例,介绍了配网不停电作业的适用范围与技术难点,结合工程实际情况,分析了传统电缆挂板装置存在的弊端,进而对旁路作业绝...为解决作业工具管理与使用效率不高的问题,提高配网不停电作业精益化工作水平,以某市10 k V配电线路检修改造项目为例,介绍了配网不停电作业的适用范围与技术难点,结合工程实际情况,分析了传统电缆挂板装置存在的弊端,进而对旁路作业绝缘挂板进行优化改造,提出具体的设计目标与装置构造方案。此外,为保证其使用效果,还开展了工具管理及试验工作,有效提高了配网不停电作业实施成效。展开更多
文摘A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.
基金the State Grid Zhejiang Electric Power Co.,Ltd.(Science and Technology Project under Grant 5211JH180081:Research on security evaluation and control technology of smart platform based on dispatch cloud.)。
文摘To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cases demonstrate thatan I-ORA is necessary because it provides accurate handlingof the coupling between transmission and distribution networks,accurate analysis of power supply mode (PSM) changes ofimportant users and helps to improve security and stability ofpower grid operations. Two key technical requirements in theI-ORA algorithm are realized, i.e., integrated topology analysisand integrated power flow calculation. Under a certain contingency, integrated topology analysis is used to assess the risksof substation power cuts, network split and PSM changes ofimportant users, while the integrated power flow calculation,based on the self-adaptive Levenburg-Marquard method andNewton method, can be implemented to assess risks of heavyload/overload and voltage deviation. In addition, the graphicsprocessing unit is used to parallelly process some computationintensive steps. Numerical experiments show that the proposedI-ORA algorithm can realize accurate assessment for the entireI-T&D. In addition, the efficiency and convergence are satisfying,indicating the proposed I-ORA algorithm can significantly benefitreal practice in the coordination operation of I-T&D in the future.
文摘为解决作业工具管理与使用效率不高的问题,提高配网不停电作业精益化工作水平,以某市10 k V配电线路检修改造项目为例,介绍了配网不停电作业的适用范围与技术难点,结合工程实际情况,分析了传统电缆挂板装置存在的弊端,进而对旁路作业绝缘挂板进行优化改造,提出具体的设计目标与装置构造方案。此外,为保证其使用效果,还开展了工具管理及试验工作,有效提高了配网不停电作业实施成效。