期刊文献+
共找到7,381篇文章
< 1 2 250 >
每页显示 20 50 100
Control of Unit Power Factor PWM Rectifier
1
作者 Meifang Xue Mingzhi He 《Energy and Power Engineering》 2013年第4期121-124,共4页
To solve the problem of harmonic pollution to the power grid that caused by traditional diode rectifier and phase controlled rectifier, the unit power factor PWM rectifier is designed. The topology structure of the re... To solve the problem of harmonic pollution to the power grid that caused by traditional diode rectifier and phase controlled rectifier, the unit power factor PWM rectifier is designed. The topology structure of the rectifier circuit is introduced and the double closed-loop control strategy in three-phase stationary coordinate system is analyzed. For the deficiency of control strategy, the control strategy in two-phase synchronous rotating coordinate system is proposed. This makes the independent control of active current and reactive current to be realized. The simulation model of the PWM rectifier is built and the effectiveness of the control method proposed in this paper is verified by simulation. 展开更多
关键词 CONTROL PWM RECTIFIER unit power FACTOR d q COORDINATES
下载PDF
The Control System for the Unit Power with Time Delay Based on the H-infinity Observer
2
作者 Changqing Zhang Xiangyang Yu +1 位作者 Xinmin Yang Yongxuan Huang 《通讯和计算机(中英文版)》 2006年第7期68-73,共6页
关键词 运算方法 电力自动化 锅炉燃烧 自动化控制
下载PDF
Source-Load Coordinated Optimal Scheduling Considering the High Energy Load of Electrofused Magnesium and Wind Power Uncertainty
3
作者 Juan Li Tingting Xu +3 位作者 Yi Gu Chuang Liu Guiping Zhou Guoliang Bian 《Energy Engineering》 EI 2024年第10期2777-2795,共19页
In fossil energy pollution is serious and the“double carbon”goal is being promoted,as a symbol of fresh energy in the electrical system,solar and wind power have an increasing installed capacity,only conventional un... In fossil energy pollution is serious and the“double carbon”goal is being promoted,as a symbol of fresh energy in the electrical system,solar and wind power have an increasing installed capacity,only conventional units obviously can not solve the new energy as the main body of the scheduling problem.To enhance the systemscheduling ability,based on the participation of thermal power units,incorporate the high energy-carrying load of electro-melting magnesiuminto the regulation object,and consider the effects on the wind unpredictability of the power.Firstly,the operating characteristics of high energy load and wind power are analyzed,and the principle of the participation of electrofusedmagnesiumhigh energy-carrying loads in the elimination of obstructedwind power is studied.Second,a two-layer optimization model is suggested,with the objective function being the largest amount of wind power consumed and the lowest possible cost of system operation.In the upper model,the high energy-carrying load regulates the blocked wind power,and in the lower model,the second-order cone approximation algorithm is used to solve the optimizationmodelwithwind power uncertainty,so that a two-layer optimizationmodel that takes into account the regulation of the high energy-carrying load of the electrofused magnesium and the uncertainty of the wind power is established.Finally,the model is solved using Gurobi,and the results of the simulation demonstrate that the suggested model may successfully lower wind abandonment,lower system operation costs,increase the accuracy of day-ahead scheduling,and lower the final product error of the thermal electricity unit. 展开更多
关键词 High energy load of electrofused magnesium wind energy consumption thermal power unit wind power uncertainty two-layer optimization
下载PDF
Multi-model Predictive Control of Ultra-supercritical Coal-fired Power Unit 被引量:6
4
作者 王国良 阎威武 +2 位作者 陈世和 张曦 邵惠鹤 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2014年第7期782-787,共6页
The control of ultra-supercritical(USC) power unit is a difficult issue for its characteristic of the nonlinearity, large dead time and coupling of the unit. In this paper, model predictive control(MPC) based on multi... The control of ultra-supercritical(USC) power unit is a difficult issue for its characteristic of the nonlinearity, large dead time and coupling of the unit. In this paper, model predictive control(MPC) based on multi-model and double layered optimization is introduced for coordinated control of USC unit. The linear programming(LP) combined with quadratic programming(QP) is used in steady optimization for computation of the ideal value of dynamic optimization. Three inputs(i.e. valve opening, coal flow and feedwater flow) are employed to control three outputs(i.e. load, main steam temperature and main steam pressure). The step response models for the dynamic matrix control(DMC) are constructed using the three inputs and the three outputs. Piecewise models are built at selected operation points. Double-layered multi-model predictive controller is implemented in simulation with satisfactory performance. 展开更多
关键词 Ultra-supercritical power unit Coordinated control Multi-model constrained predictive control
下载PDF
Power management unit chip design for automobile active-matrix organic light-emitting diode display module 被引量:4
5
作者 KIM J H PARK J H +7 位作者 KIM J H CAO T V LEE T Y BAN H J YANG K KIM H G HA P B KIM Y H 《Journal of Central South University》 SCIE EI CAS 2009年第4期621-628,共8页
A power management unit (PMU) chip supplying dual panel supply voltage, which has a low electro-magnetic interference (EMI) characteristic and is favorable for miniaturization, is designed. A two-phase charge pump... A power management unit (PMU) chip supplying dual panel supply voltage, which has a low electro-magnetic interference (EMI) characteristic and is favorable for miniaturization, is designed. A two-phase charge pump circuit using external pumping capacitor increases its pumping current and works out the charge-loss problem by using bulk-potential biasing circuit. A low-power start-up circuit is also proposed to reduce the power consumption of the band-gap reference voltage generator. And the ring oscillator used in the ELVSS power circuit is designed with logic devices by supplying the logic power supply to reduce the layout area. The PMU chip is designed with MagnaChip's 0.25 μ high-voltage process. The driving currents of ELVDD and ELVSS are more than 50 mA when a SPICE simulation is done. 展开更多
关键词 DC-DC converter AMOLED charge pumping power management unit (PMU) dual panel supply voltage
下载PDF
LVP Modeling and Dynamic Characteristics Prediction of A Hydraulic Power Unit in Deep-Sea 被引量:1
6
作者 曹学鹏 叶敏 +2 位作者 邓斌 张翠红 俞祖英 《China Ocean Engineering》 SCIE EI CSCD 2013年第1期17-32,共16页
A hydraulic power unit (HPU) is the driving "heart" of deep-sea working equipment. It is critical to predict its dynamic performances in deep-water before being immerged in the seawater, while the experimental tes... A hydraulic power unit (HPU) is the driving "heart" of deep-sea working equipment. It is critical to predict its dynamic performances in deep-water before being immerged in the seawater, while the experimental tests by simulating deep-sea environment have many disadvantages, such as expensive cost, long test cycles, and difficult to achieve low-temperature simulation, which is only used as a supplementary means for confirmatory experiment. This paper proposes a novel theoretical approach based on the linear varying parameters (LVP) modeling to foresee the dynamic performances of the driving unit. Firstly, based on the varying environment features, dynamic expressions of the compressibility and viscosity of hydranlic oil are derived to reveal the fluid performances changing. Secondly, models of hydraulic system and electrical system are accomplished respectively through studying the control process and energy transfer, and then LVP models of the pressure and flow rate control is obtained through the electro-hydraulic models integration. Thirdly, dynamic characteristics of HPU are obtained by the model simulating within bounded closed sets of varying parameters. Finally, the developed HPU is tested in a deep-sea imitating hull, and the experimental results are well consistent with the theoretical analysis outcomes, which clearly declare that the LVP modeling is a rational way to foresee dynamic performances of HPU. The research approach and model analysis results can be applied to the predictions of working properties and product designs for other deep-sea hydraulic pump. 展开更多
关键词 hydraulic power unit (HPLO linear varying parameters (L VP) modeling dynamic viscosity characteristics prediction
下载PDF
Unit Commitment under the Environment of Wind Power and Large-Scale Bilateral Transactions 被引量:1
7
作者 Fang Liu Yi Pan +2 位作者 Junfeng Yang Zhiqiang Luo Lihua Liu 《Energy and Power Engineering》 2017年第4期611-624,共14页
Bilateral electric power contract is settled based on contract output curve. This paper considered the bilateral transactions execution, new energy accommodation, power grid security and generation economy, considerin... Bilateral electric power contract is settled based on contract output curve. This paper considered the bilateral transactions execution, new energy accommodation, power grid security and generation economy, considering the executive priority of different power components to establish a multi-objective coordination unit commitment model. Through an example to verify the effectiveness of the model in promoting wind power consumption, guaranteeing trade execution, and improving power generation efficiency, and analyzed the interactions to each other among the factors of wind power, trading and blocking. According to the results, when wind power causes reverse power flow in the congestion line, it will promote the implementation of contracts, the influence of wind power accommodation to trade execution should be analyzed combined with the grid block, the results can provide reference for wind power planning. 展开更多
关键词 Bilateral Electric power CONTRACT unit COMMITMENT Wind power ACCOMMODATION TRANSACTION Execution CONGESTION
下载PDF
Unit stream power,minimum energy dissipation rate,and river engineering
8
作者 Chih Ted Yang 《水道港口》 2010年第5期317-317,共1页
Unit stream power is the most important and dominant parameter for the determination of transport rate of sand,gravel,and hyper-concentrated sediment with wash load.Minimum energy dissipation rate theory,or its simpli... Unit stream power is the most important and dominant parameter for the determination of transport rate of sand,gravel,and hyper-concentrated sediment with wash load.Minimum energy dissipation rate theory,or its simplified minimum unit stream power and minimum stream power theories,can provide engineers the needed theoretical basis for river morphology and river engineering studies.The Generalized Sediment Transport model for Alluvial River Simulation computer mode series have been developed based on the above theories.The computer model series have been successfully applied in many countries.Examples will be used to illustrate the applications of the computer models to solving a wide range of river morphology and river engineering problems. 展开更多
关键词 computer model minimum energy dissipation rate river engineering river morphology sediment transport unit stream power
下载PDF
ELECTRONIC CONTROL OF TURBINE POWER UNITS
9
作者 Wang Daobo(Department of Science and Technology,NUAA 29 Yudao Street,Nanjing 210016,P.R.China) 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI 1994年第2期177-182,共6页
This paper is concerned with the development of electronic controller for turbine POwer units. In order to increase the reliability of the POwer unit, three control loops working in the hi-backup mode have been employ... This paper is concerned with the development of electronic controller for turbine POwer units. In order to increase the reliability of the POwer unit, three control loops working in the hi-backup mode have been employed. This control strategy is able to satisfy the demands of the application of the power unit to the aviation fields. 展开更多
关键词 ELECTRONIC CONTROL power unitS AUXILIARY power supply TURBINE power unitS
下载PDF
Effect of Angle of Attack and Blade Tip Vortex on the Noise Level of Tandem Wind Rotors of an Intelligent Wind Power Unit
10
作者 Fumiha Odo Ahmed Mohamed Galal +1 位作者 Akira Enishi Toshiaki Kanemoto 《Journal of Environmental Science and Engineering(A)》 2013年第12期736-743,共8页
The authors have invented a superior wind power unit, which is composed of tandem wind rotors and double rotational armature type generator without the traditional stator. This unit is called "intelligent wind power ... The authors have invented a superior wind power unit, which is composed of tandem wind rotors and double rotational armature type generator without the traditional stator. This unit is called "intelligent wind power unit". At upwind type unit, the large-sized front wind rotor and the small-sized rear wind rotor drive the inner and the outer rotational armatures respectively, in keeping the rotational torque counter-balance between both wind rotors/armatures. This paper discusses the acoustic noise emitted from the tandem wind rotors. As for tandem wind rotors, the tip vortex shedding from the front wind rotor may make a loud acoustic noise if the vortex attacks the rear wind rotor. Intelligent wind power unit, however, has no chance to increase the acoustic noise level by the tip vortex because the diameter of the front wind rotor is reasonably larger than the diameter of the rear wind rotor. The vorticity generated in the boundary layer on the blade can be observed obviously at wake flow and can be evaluated quantitatively at flow conditions measured by a hot-wire anemometer at a wind tunnel. The flow conditions have shown that the radial and axial components of vorticities contribute to emit the acoustic noise. 展开更多
关键词 Acoustic noise INTELLIGENT TANDEM wind power unit.
下载PDF
Research on the Prediction of Load Regulation Capacity for Supercritical Thermal Power Unit
11
作者 Yong He Zhuo Huang +3 位作者 Yaohua Tang Weimin Guo Yuanli Cai Haonan Jiang 《Journal of Power and Energy Engineering》 2020年第8期23-36,共14页
Both the modeling and the load regulation capacity prediction of a supercritical power plant are investigated in this paper. Firstly, an indirect identification method based on subspace identification method is propos... Both the modeling and the load regulation capacity prediction of a supercritical power plant are investigated in this paper. Firstly, an indirect identification method based on subspace identification method is proposed. The obtained identification model is verified by the actual operation data and the dynamic characteristics of the system are well reproduced. Secondly, the model is used to predict the load regulation capacity of thermal power unit. The power, main steam pressure, main steam temperature and other parameters are simulated respectively when the unit load is going up and down. Under the actual constraints, the load regulation capacity of thermal power unit can be predicted quickly. 展开更多
关键词 Supercritical Thermal power unit Subspace Identification Indirect Identification Load Regulation
下载PDF
Maximal loads acting on legs of powered roof support unit in longwalls with bumping hazards
12
作者 Stanislaw Szweda(Silesian Technical University Faculty of Mining and Geology Mining Mechanization Institute Gliwice, Poland) 《Journal of Coal Science & Engineering(China)》 2001年第2期1-15,共15页
In the article the results of measurements of the resultant force in the legs of a powered roof support unit, caused by a dynamic interaction of the rock mass, are discussed. The measurements have been taken in the lo... In the article the results of measurements of the resultant force in the legs of a powered roof support unit, caused by a dynamic interaction of the rock mass, are discussed. The measurements have been taken in the longwalls mined with a roof fall, characterized by the highest degree of bumping hazard. It has been stated that the maximal force in the legs F m, recorded during a dynamic interaction of the rock mass, is proportional to the initial static force in the legs F st,p . Therefore a need for a careful selection of the initial load of the powered roof support, according to the local mining and geological conditions, results from such a statement. Setting the legs with the supporting load exceeding the indispensable value for keeping the direct roof solids in balance, deteriorating the operational parameters of a longwall system also has a disadvantageous influence on the value of the force in the legs and the rate of its increase, caused by a dynamic interaction of the rock mass. A correct selection of the initial load causes a decrease in the intensity of a dynamic interaction of the rock mass on powered roof supports, which also has an advantageous influence on their life. Simultaneously with the measurements of the resultant force in the legs, the vertical acceleration of the canopy was also recorded. It has enabled to prove that the external dynamic forces may act on the unit both from the roof as well as from the floor. The changes of the force in the legs caused by dynamic phenomena intrinsically created in the roof and changes of the force in the legs caused by blasting explosives in the roof of the working, have been analyzed separately. It has been stated that an increase in the loads of legs, caused by intrinsic phenomena is significantly higher than a force increase in the legs caused by blasting. It means that powered roof supports, to be operated in the workings, where the bumping hazard occurs, will also transmit the loads acting on a unit during blasting. The majority of recorded force changes in the legs has been caused by a dynamic interaction of the roof. They are characterized by a load increase coefficient K d, satisfying the inequality 1 06<K d =F m /F st,p <1 24. A much smaller number of cases, when the external load acted on the bases, was recorded. Individual, recorded results of measurements indicate that changes of the force in the legs, caused by external loads of this type, run more intensively due to roof loads (1 08< K d<1 80),particularly in these cases when the near the roof layer of the seam is under mining. A determination of more precise relations among the changes of forces in the legs, caused by a dynamic interaction of the floor and the bases and the mining and geological conditions requires a performance of additional underground tests. 展开更多
关键词 LONGWALL bumping hazard powered roof support unit
下载PDF
2-MW wind power unit successfully manufactured
13
《Electricity》 2008年第2期13-,共1页
As of the end of April, by autonomous research anddevelopment on the basis of imported technologies,Beijing Beizhong Steam-Turbo Machinery Company Ltd.had successfully completed trial production of a 2-MWlow-temperatu... As of the end of April, by autonomous research anddevelopment on the basis of imported technologies,Beijing Beizhong Steam-Turbo Machinery Company Ltd.had successfully completed trial production of a 2-MWlow-temperature type wind power generating unit; andnow the company has put the new type of wind 展开更多
关键词 MW wind power unit successfully manufactured AS
下载PDF
Repacking practice for G-3 engineering driller power unit with drive shaft of dual channel reverse circulation
14
作者 Lihong ZHU Kun YIN Qingyan WANG Yong HUANG 《Global Geology》 2008年第1期42-46,共5页
In order to satisfy operating requirements for constant core drilling technology in reverse circulation with hollow-through DTH,the power unit of G-3 engineering driller was ameliorated. The new one with dual channel ... In order to satisfy operating requirements for constant core drilling technology in reverse circulation with hollow-through DTH,the power unit of G-3 engineering driller was ameliorated. The new one with dual channel drive shaft, achieved the perfect assemble with transmission structure of the original power unit. It could interconvert according to need by using two sets of drive shafts with direct and reverse circulation. The repacked G-3 engineering driller carried on experiment in the field test in Luanchuan molybdenum mine of Henan, whose effect was very good. 展开更多
关键词 power unit drive shaft reverse circulation constant core drilling technique G-3 engineering driller
下载PDF
1133.5 MW Small Thermal Power Units to be Shut Down in Jiangsu
15
《Electricity》 1999年第3期51-51,共1页
关键词 MW Small Thermal power units to be Shut Down in Jiangsu DOWN
下载PDF
Contribution of UHV Grid to United National Power Market
16
作者 Guo Lei1, Wei Bin1,, Ma Li1 and Cheng Wen2 1. State Power Economic Research Institute 2. North China Electric Power University 《Electricity》 2010年第2期26-29,共4页
Power market construction is an important part of the marketization reform in China's electric power industry and an essential part of the economic system reform in China. With the social and economic development,... Power market construction is an important part of the marketization reform in China's electric power industry and an essential part of the economic system reform in China. With the social and economic development, the contradiction between distribution of energy resources and development of regional economies gets increasingly noticeable, and a united national power market is consequentially required to optimize the allocation of energy resources over the whole country. Analyses indicate that the development of UHV grid will provide a strong material support for the united national power market by expanding market coverage, lowering load fluctuation and promoting diversif ication of power resources. 展开更多
关键词 Contribution of UHV Grid to united National power Market
下载PDF
Unit 2 of Tianjin Beijiang Power Plant commissioned
17
《Electricity》 2010年第1期29-,共1页
Tianjin Beijiang Power Plant, one of the first series of Circular Economy Demonstration Project in the country, successfully put its second unit into operation on November 30, 2009
关键词 unit 2 of Tianjin Beijiang power Plant commissioned PROJECT
下载PDF
Sensitivity Analysis of a 50+ Coal-Fired Power Unit Efficiency
18
作者 Katarzyna Stepczyńska-Drygas Slawomir Dykas Krystian Smolka 《Journal of Power and Energy Engineering》 2015年第12期19-31,共13页
The coal-fired power unit integration with a CO2 capture and compression installation involves a considerable rise in the costs of electricity generation. Therefore, there is a need for a continuous search for methods... The coal-fired power unit integration with a CO2 capture and compression installation involves a considerable rise in the costs of electricity generation. Therefore, there is a need for a continuous search for methods of improving the electricity generation efficiency in steam power plants. One technology which is especially promising is the advanced ultra-supercritical (A-USC) power unit. Apart from steam parameters upstream the turbine, the overall efficiency also depends on the efficiency values of individual elements of the plant and the size of energy consumption of the process of CO2 sequestration from the boiler flue gases. These problems are considered herein to emphasize that without specifying the efficiency values of the power plant main elements the information concerning its electricity generation efficiency is incomplete. This paper presents the influence of the efficiency of individual elements of the power plant on its electricity generation efficiency. The lack of information of the efficiencies of the power plant individual elements, by presenting its overall efficiency, may lead to the false conclusions. 展开更多
关键词 Sensitivity Analysis A-USC power unit Efficiency CO_(2) Capture
下载PDF
The Largest Thermal Power Unit in Northwest Network Starts Construction Soon
19
《Electricity》 1997年第3期50-50,共1页
关键词 The Largest Thermal power unit in Northwest Network Starts Construction Soon
下载PDF
500 MW Unit Simulator for Panshan Thermal Power Plant Passed Acceptance
20
《Electricity》 1996年第4期36-36,共1页
After a thorough demonstration in Panshan Thermal Power Plant, the 500 MW super critical pressure unit simulator developed by the Simulation & Control Institute under the North China University of Electric Power w... After a thorough demonstration in Panshan Thermal Power Plant, the 500 MW super critical pressure unit simulator developed by the Simulation & Control Institute under the North China University of Electric Power was accepted by experts from the North China Electric Power Group Company on 3rd August 1996. 展开更多
关键词 MW unit Simulator for Panshan Thermal power Plant Passed Acceptance IP
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部