期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
A method for computing unsupported roof distance in roadway advancement and its in-situ application 被引量:2
1
作者 Chen Yong Bai Jianbiao +2 位作者 Yan Shuai Hao Shengpeng Dao Viet Doan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期551-556,共6页
A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the ... A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the roof stress distribution and URD,obtained by the difference method,and roof stability according to the in-situ roof stress and rock mass strength was developed.We subsequently designed a proper range of URD,developed a testing method of URD with the function of mining protection,evaluated roof stability through analyzing the test data and then determined a reasonable URD.Considering the factors of the geological conditions,the immediate roof stability and the efficiency of the labor arrangement system,the URD of the advancing roadway of 9802 working face in Zhangshuanglou coal mine was determined to be 6 m using the proposed method.The results show that,when a 2 m length of roadway was reinforced by temporary support and high pre-stressed bolt support after the roadway advancement of 6 m per cycle,the speed and the security of the roadway development can be achieved and the advance rate can reach more than 400 m per month. 展开更多
关键词 井下巷道 现场应用 板间距 顶板稳定性 计算 护顶 稳定性评价 预应力锚杆
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部