The common problem of cold strip continuous annealing furnaces is high exhaust gas temperature and great energy consumption. Taking the cold-strip continuous annealing furnaces of Baosteel No. 4 cold mill plant as an ...The common problem of cold strip continuous annealing furnaces is high exhaust gas temperature and great energy consumption. Taking the cold-strip continuous annealing furnaces of Baosteel No. 4 cold mill plant as an example, several waste heat recovery systems in the annealing furnaces are compared and their advantages and disadvantages are analyzed through different energy-saving technologies.展开更多
An explosion-proof dual throttling air-conditioning system was put forward to solve the heat dissipation and internal dewing problems of explosion-proof frequency converter in the underground coal mine. This study inv...An explosion-proof dual throttling air-conditioning system was put forward to solve the heat dissipation and internal dewing problems of explosion-proof frequency converter in the underground coal mine. This study investigated the feasibility and benefits of explosion-proof dual throttling cooling and dehumidification air-conditioning system applied to the explosion-proof frequency converter. The physical model of dual throttling air-conditioning system was established and its performance parameter was described by mathematical method. The design calculation of the system has also been done. The experimental result showed that the system reached the steady state at the refrigeration mode after running 45 min, and the maximum internal temperature of the flame-proof cavity was 31.0 ℃. The system reached the steady state at the dehumidification mode after running 37 min. The maximum internal relative humidity and temperature of the flame-proof cavity were 33.4% and 36.3 ℃, respectively. Therefore, the proposed system had excellent ability of heat dissipation and avoided internal dewing. Compared with water cooling system, it was more energy-saving and economical. The airflow field of dual throttling air-conditioning system was also studied by CFD simulation. It was found that the result of CFD numerical simulation was highly consistent with the experimental data.展开更多
The building energy consumption is an important part among the total society energy consumption,in which the energy consumption for air conditioning occupies almost 70%.The energy consumption of the air conditioning s...The building energy consumption is an important part among the total society energy consumption,in which the energy consumption for air conditioning occupies almost 70%.The energy consumption of the air conditioning system for fresh air handling can be saved effectively when the exhaust air energy could be recovered to preheat or precool the fresh air.Considering the install locations requirements on field,the pump-driven heat pipes(PHP)were developed as heat recovery ventilators(HRVs)and used in an existing experiment building in Beijing Urban.The thermal performance of the PHP HRVs was tested in real operation time periods under winter running mode.Both the power and heat consumption of the modular air handling units with and without HRVs were monitored and obtained,as well as the hourly power and heat consumption.The energy savings of HRVs were analyzed.The results indicate that the PHP HRVs can work steadily and meet the energy recovery need well.The temperature effectiveness of the HRVs can be kept from 60%to 70%.The test total energy saving rate was 24.48%,and the average hourly heat consumption reduced by 28.54%.The daily energy consumption can be saved by 118 kWh,and the energy savings can reach to 9440 kWh for a whole winter.展开更多
文摘The common problem of cold strip continuous annealing furnaces is high exhaust gas temperature and great energy consumption. Taking the cold-strip continuous annealing furnaces of Baosteel No. 4 cold mill plant as an example, several waste heat recovery systems in the annealing furnaces are compared and their advantages and disadvantages are analyzed through different energy-saving technologies.
基金Supported by the National Basic Research Program of China("973"Program,No.2009CB219907)
文摘An explosion-proof dual throttling air-conditioning system was put forward to solve the heat dissipation and internal dewing problems of explosion-proof frequency converter in the underground coal mine. This study investigated the feasibility and benefits of explosion-proof dual throttling cooling and dehumidification air-conditioning system applied to the explosion-proof frequency converter. The physical model of dual throttling air-conditioning system was established and its performance parameter was described by mathematical method. The design calculation of the system has also been done. The experimental result showed that the system reached the steady state at the refrigeration mode after running 45 min, and the maximum internal temperature of the flame-proof cavity was 31.0 ℃. The system reached the steady state at the dehumidification mode after running 37 min. The maximum internal relative humidity and temperature of the flame-proof cavity were 33.4% and 36.3 ℃, respectively. Therefore, the proposed system had excellent ability of heat dissipation and avoided internal dewing. Compared with water cooling system, it was more energy-saving and economical. The airflow field of dual throttling air-conditioning system was also studied by CFD simulation. It was found that the result of CFD numerical simulation was highly consistent with the experimental data.
基金supported by the Project of Science and Technology Program of Beijing Municipal Chao Yang District(CYSF2005,Zhun Li,http://www.bjchy.gov.cn/dynamic/notice/8a24fe83722fa7180172360a3f46044c.html).
文摘The building energy consumption is an important part among the total society energy consumption,in which the energy consumption for air conditioning occupies almost 70%.The energy consumption of the air conditioning system for fresh air handling can be saved effectively when the exhaust air energy could be recovered to preheat or precool the fresh air.Considering the install locations requirements on field,the pump-driven heat pipes(PHP)were developed as heat recovery ventilators(HRVs)and used in an existing experiment building in Beijing Urban.The thermal performance of the PHP HRVs was tested in real operation time periods under winter running mode.Both the power and heat consumption of the modular air handling units with and without HRVs were monitored and obtained,as well as the hourly power and heat consumption.The energy savings of HRVs were analyzed.The results indicate that the PHP HRVs can work steadily and meet the energy recovery need well.The temperature effectiveness of the HRVs can be kept from 60%to 70%.The test total energy saving rate was 24.48%,and the average hourly heat consumption reduced by 28.54%.The daily energy consumption can be saved by 118 kWh,and the energy savings can reach to 9440 kWh for a whole winter.