期刊文献+
共找到436篇文章
< 1 2 22 >
每页显示 20 50 100
A Review on the Role of Risk Management (RM) and Value Engineering (VE) Tools for Project Successful Delivery 被引量:1
1
作者 Elysé Masengesho Ji Wei +1 位作者 Nadine Umubyeyi Rosette Niyirora 《World Journal of Engineering and Technology》 2021年第1期109-127,共19页
Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its gre... Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its great contributions to the national gross domestic product (GDP) of the country. Concerning construction processes, both risk management (RM) and value engineering (VE) techniques have commonalities from the beginning up to the completion of the project due to enhancing the project value/quality, meeting the project deadline, and reducing overall project cost. VE includes resolving the uncertainty of project objectives and ensuring that the project is delivered in a value for money way. The key point of RM is to solve the uncertainty of the project itself and its results to ensure that the specifications are achieved within the prescribed time, cost, and quality constraints. This review work is comparatively and collectively focus</span><span style="font-family:Verdana;">ed</span><span style="font-family:Verdana;"> on assessing the role of RM and VE tools for project successful delivery. It studies the points of difference and common features of the two aspects in terms of construction project delivery. So, this study concluded that in construction RM tool cannot be the chief aim of the all parties involved in the project execution because sometimes it produces itself negative results and reduces project management success. Therefore, RM needs a strong combination with VE due to the dependence of the target in identifying and assessing risks by considering the highest performance and lowest cost. The integration of RM and VE combination in a single study would avoid duplication of work and deliver better value for money thereby leading to better project outcomes. 展开更多
关键词 managing Projects Risk management value engineering Proper Project Delivery
下载PDF
Validation of a Value Management Approach Developed for the Saudi Public Sector
2
作者 Mohammed Auda S Alalshikh 《Journal of Civil Engineering and Architecture》 2014年第2期197-206,共10页
A VM (value management) approach was developed that better suits the culture and the context of the SPS (Saudi Public Sector). This approach provided a comprehensive assessment of VM at institutional, organization... A VM (value management) approach was developed that better suits the culture and the context of the SPS (Saudi Public Sector). This approach provided a comprehensive assessment of VM at institutional, organizational and project levels. This paper illustrates the procedures that were used to validate the developed VM approach. For the institutional and organizational levels, the VM approach was validated by conducting telephone interviews with three experts from three organizations that use VM and with two senior managers from the MOF (Ministry of Finance). Mainly, it was found that the MOF should be supported by experts to set up a centre of excellence that can set VM policy, guidelines and standards for the promotion of VM in the SPS, in order to ensure achieving value for money spent in SPS projects. The developed VM approach, as it would be applied at the project level, was presented to 11 experts, all of whom completed a validation questionnaire and presented their comments. Subsequently, the questionnaires were analyzed and the VM approach was amended to reflect the inputs provided by these experts. It was concluded that VM should be applied at least twice on SPS projects. Firstly, it is to review and structure strategic and project briefs to sort out soft issues, and secondly, it is to optimize project designs and sort out hard issues. 展开更多
关键词 value management value engineering project management Saudi public sector Saudi Arabia.
下载PDF
Application of Value Engineering in Construction Projects
3
作者 Senay Atabay and Niyazi Galipogullari 《Journal of Traffic and Transportation Engineering》 2013年第1期39-48,共10页
The current economic conditions have entailed the use of rational method and techniques and research and application of new techniques by utilizing advancements in technology in the field of production as well as in e... The current economic conditions have entailed the use of rational method and techniques and research and application of new techniques by utilizing advancements in technology in the field of production as well as in every field. Excess cost control requires to be maintained throughout the project life of building beginning from the initial stages of design. Scrutinizing the project well and considering all possible alternatives particularly in design stage are important for achieving optimum cost. In this study, how the principles of VE (value engineering) are applied in construction projects is explained, and by covering Bregana-Zagreb-Dubrovnik Motorway construction in Croatia by BECHTEL -ENKA joint venture as the sample project, practices of VE in this project are described. The satisfactory results of time and cost saving are achieved by applying value engineering principles through the VE team during the project preparation phase and project revision phase. Approximately 43,000,0005 and 12 months of time were saved in total thanks to all these VE works. This saving provided builder company with 6% financial saving and 17% work time reduction. 展开更多
关键词 value engineering value management motorway construction.
下载PDF
Application of Earned Value Method in Project Cost Management and Schedule Management
4
作者 Wenjing Xu 《Proceedings of Business and Economic Studies》 2021年第4期146-152,共7页
At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role... At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role and value in improving the ability of project management.Earned value method,which is an important way in the field of project management,enables whole project management to rise to a new height.The specific principle of earned value method will be elaborated by fully introducing the specific role of earned value method in engineering projects to provide a reference and basis for practitioners to improve their management ability. 展开更多
关键词 Earned value method engineering project Cost management
下载PDF
Innovation and practice of petroleum engineering synergetic management for the development of difficult-to-produce reserves 被引量:1
5
作者 LIU Zhongyun 《Petroleum Exploration and Development》 2020年第6期1316-1324,共9页
Due to engineering technology and development costs,a considerable amount of proven oil and gas resources in China are difficult to develop,becoming reserves difficult to produce.Based on the successful development of... Due to engineering technology and development costs,a considerable amount of proven oil and gas resources in China are difficult to develop,becoming reserves difficult to produce.Based on the successful development of some domestic oil and gas reserves difficult to recover,this article summarizes the"four in one"petroleum engineering synergetic management model to promote the effective development of these reserves.This model draws on the essence of management theories,such as system theory,cybernetics and synergetic theory,and proposes the development idea of value creating and sharing for this type of reserves.By adopting the new management method of mechanism synergy,speciality synergy,process synergy and industrial chain synergy,this model effectively overcomes the decentralization of management responsibility,different management objectives,great risks of engineering and technological innovation,and the large number of uncertain factors in project construction,and can stimulate the vitality and power of active coordination of project participants,to effectively realize the synergetic innovation of engineering technology and synergetic cost reduction of the whole chain,reduction of the balanced oil price of the project,and dispersion of the project investment risk.By adopting this model,a large proportion of difficult-to-produce reserves have been liberated,realizing the effective utilization of the difficult-to-produce oil and gas resources,and making the reserves an important supplement to ensure national energy security. 展开更多
关键词 difficult-to-produce oil and gas reserves petroleum engineering engineering management synergetic innovation value creating and sharing energy security
下载PDF
Sustainability Index: An Application into Sustainable Engineering Infrastructure Management and Assessment
6
作者 Bassey Bassey Okon Taha Salih Elhag 《Journal of Mechanics Engineering and Automation》 2011年第1期18-31,共14页
A proper infrastructure assessment in the contemporary engineering world has become very crucial due to the palpable resources challenges. Therefore, from the design, construction, operation and maintenance stages of ... A proper infrastructure assessment in the contemporary engineering world has become very crucial due to the palpable resources challenges. Therefore, from the design, construction, operation and maintenance stages of the built infrastructural systems; cognizance must be taken of the associated factors and their significance. In considering these indices, the experts will save lots of resources wastage thereby integrating new technologies into the full life cycle of the infrastructure. In this paper, two sets of building infrastructure professionals were assessed. These are the corporate building organization (CBO) and the Operators from two shopping malls within the UK. Thirty-four factors regarding the sustainable building infrastructure appraisal were identified through literature reviews. These characteristics were accordingly classified into two factors (group I and II) and a comparative analysis of their influence conducted. Priority rating of the factors assessment on building infrastructure was through structured, administered survey amongst professionals within these organizations. Information of this survey revealed that the experts maintained a strong concordance in rating these factors. As a result, the associated factors have relatively substantial degree of influence in this context. Further indications of the result in groups I and II are that the CBO experts have indicated the infrastructure size, planning and design as the key factors. Also, the type of building characteristic was among others as the top and bottom marked cases. Similarly, the Operators too have maintained that a proper infrastructure design should incorporate a good policy framework for efficient energy saving fixtures and conservation. Additionally, the installation of quality equipment promotes cost savings of the resources and a just-in-time maintenance of the infrastructure at large. The maintain as-we-go philosophy characteristic was not strongly encouraged in this case. 展开更多
关键词 ASSESSMENT engineering development infrastructure management sustainability index values.
下载PDF
半个世纪以来VE/VM在发达国家实践应用的发展沿革 被引量:4
7
作者 张彩江 《价值工程》 2007年第3期1-5,共5页
对半个多世纪以来的价值工程/价值管理(Value Engineering/Value Management,VE/VM)的实践发展作了概要性回顾。指出:VE/VM的产生具有深刻的社会和经济背景,而发达国家企业、政府层面的高度重视,国家普遍崇尚科学,普遍尊重创新的社会价... 对半个多世纪以来的价值工程/价值管理(Value Engineering/Value Management,VE/VM)的实践发展作了概要性回顾。指出:VE/VM的产生具有深刻的社会和经济背景,而发达国家企业、政府层面的高度重视,国家普遍崇尚科学,普遍尊重创新的社会价值观念,在VA/VE早期的实践兴起和发展阶段起着重要的推动作用;VE/VM在发达国家半个多世纪的持久深入应用,在创造巨大价值的同时,也深深影响了管理理念和价值观;直到迎接21世纪以创新导向的知识经济的到来,其影响是深远的。 展开更多
关键词 价值分析(value Analvsis VA) 价值工程(value engineering ve) 价值管理(value management vm) ve/vm实践应用 ve/vm发展沿革
下载PDF
世界范围VE/VM学术组织的建设及其对实践应用的推动 被引量:4
8
作者 王春生 张彩江 《价值工程》 2007年第4期1-9,共9页
价值工程/价值管理(Value Engineering/Value Management,VE/VM)问世以来,许多国家和地区相继建立了学术性的组织机构,尤其在发达国家。这些组织名称各异,形式不同,但成立的宗旨、目的都相似。它们在普及VE/VM知识,开展技能培训和职业认... 价值工程/价值管理(Value Engineering/Value Management,VE/VM)问世以来,许多国家和地区相继建立了学术性的组织机构,尤其在发达国家。这些组织名称各异,形式不同,但成立的宗旨、目的都相似。它们在普及VE/VM知识,开展技能培训和职业认证,制定标准规范,引导政府/企业界开展VE/VM实践应用,倡导学术研究和学者交流等方面,起到了重要作用。这些国家深入持久开展VE/VM活动,与这些组织机构的巨大推动作用是分不开的。文中对世界范围的这些VE/VM学术性组织的建设及其对实践应用的推动进行了综述,指出与发达国家的情况相比,中国目前在这一领域尚有很大的差距;如何学习发达国家在VE/VM领域的组织建设经验,对提升中国的VE/VM理论研究和实践发展,具有借鉴作用。 展开更多
关键词 价值工程/价值管理(value engineering/value management ve/vm) 美国价值工程师协会(SAve) 日本价值工程协会(SJve) 职业认证 标准/规范
下载PDF
VE/VM的理论发展:困惑、机遇和挑战(Ⅱ)——国外VE/VM的理论和应用研究进展 被引量:3
9
作者 黄声优 李坚 +1 位作者 张彩江 王春生 《价值工程》 2007年第10期1-7,共7页
在国外,VE/VM理论研究进展的一个主要方面就是将现有的VE/VM与当今新出现的一些创新管理理念和方法结合起来,这些理论和方法包括:环境成本生命周期分析方法(Life Cycle Environmental Cost Analysis,LCECA)、信息支持思维方法(Informati... 在国外,VE/VM理论研究进展的一个主要方面就是将现有的VE/VM与当今新出现的一些创新管理理念和方法结合起来,这些理论和方法包括:环境成本生命周期分析方法(Life Cycle Environmental Cost Analysis,LCECA)、信息支持思维方法(Information Support Process-based Thinking,ISP/T)、6 Sigma管理方法、组织和团队理论、创造性问题解决策略(Creative Problem Solving Strategies,CPSS)、发明性问题解决(Theory of Inventive Problem Solving,TRIZ)方法、复杂生产系统(Complex product systems,CoPS)、战略管理、系统方法论(SM)、等。通过这种结合,开阔了VE/VM原有的思维模式和视野。同时在提升VE/VM的应用绩效上比较明显。 展开更多
关键词 价值工程/价值管理(ve/vm) 创新管理理念和方法 方法结合
下载PDF
Value Management Practices on Major Construction Projects and Green Building
10
作者 Ru-jiang Zhao Wung Hee Moh 《Frontiers of Engineering Management》 2016年第2期147-157,共11页
The paper starts with background information on value management(VM) in the construction industry and current development situation of the green building industry, and costs and profitability of green buildings. The p... The paper starts with background information on value management(VM) in the construction industry and current development situation of the green building industry, and costs and profitability of green buildings. The paper continues with detailed analyses of the findings,covering new developments and perceptions of VM, and applications of VM in the industry. The paper also reports case studies on the practices adopted in the planning and design management phase of SIPO Guangdong Patent Examination Cooperation Center and in the construction management phase of Guangzhou International Bio-Island Standard Property Unit II project. As revealed by the practices, the value-adds and savings in construction costs through the application of VM are important for the developers, and the contributions of VM application in green building projects are significant to achieving the expected targets and to resolving the design and construction challenges encountered in the development of green building industry. And the paper presents, findings on how VM can improve construction management and coordination of several ongoing construction projects and on how VM can be systematically implemented by phases, and discussions on other potential benefits of using VM systems. 展开更多
关键词 value management(vm) vm theory and practices Chinese construction industry green buildings
原文传递
基于VE的车辆装备寿命周期费用分析研究 被引量:1
11
作者 刘增勇 李伟 +2 位作者 崔益烽 齐志鹏 张旭涛 《军事交通学院学报》 2009年第5期48-51,共4页
运用价值工程的理论和方法,分析了价值工程在车辆装备寿命周期费用中运用的合理性和可行性,描述了价值工程在车辆装备寿命周期费用中的实施步骤,以优化车辆装备科研、订购、生产的全过程。
关键词 价值工程 车辆装备 寿命周期费用
下载PDF
价值工程(VE)与建筑节能 被引量:6
12
作者 刘玲 《工业建筑》 CSCD 北大核心 2006年第8期24-26,41,共4页
价值工程(VE)是从合理利用资源发展起来的一门软科学技术,是一种提升产品价值的有效方法。通过对运用价值工程原理进行建筑节能设计的必要性、可行性、合理性进行分析;阐述了建筑节能投资和建筑节能使用费用、寿命期成本三者之间辩证的... 价值工程(VE)是从合理利用资源发展起来的一门软科学技术,是一种提升产品价值的有效方法。通过对运用价值工程原理进行建筑节能设计的必要性、可行性、合理性进行分析;阐述了建筑节能投资和建筑节能使用费用、寿命期成本三者之间辩证的对立统一关系;结合案例对普通建筑和节能建筑的围护结构价值(即功能和费用匹配)进行对比,提出实现围护结构节能的途径。进而运用价值工程进行整个建筑节能设计。 展开更多
关键词 价值工程 建筑节能 围护结构
下载PDF
基于EPC的BIM技术在设计-施工一体化中的综合应用 被引量:1
13
作者 孙浩 姜安庆 +2 位作者 缪仁卿 范玮武 杨焰 《建筑结构》 北大核心 2024年第8期152-158,151,共8页
近年来,在建筑业高质量发展需求的驱动下,EPC工程总承包蓬勃发展。在EPC模式下,总承包单位需对建设项目的设计、采购、施工等全要素进行管控,与此同时,项目风险更多地从业主单位向总承包单位转移,这对总承包单位的综合管理能力提出了更... 近年来,在建筑业高质量发展需求的驱动下,EPC工程总承包蓬勃发展。在EPC模式下,总承包单位需对建设项目的设计、采购、施工等全要素进行管控,与此同时,项目风险更多地从业主单位向总承包单位转移,这对总承包单位的综合管理能力提出了更为苛刻的要求。在设计阶段,提前考虑项目需求,采用多种BIM技术对关键问题开展研究,通过BIM技术间的融合与互补,有助于打破传统发包模式下设计与施工“各自为战”的窘境,进而实现“设计-施工一体化”。通过研究某EPC项目,介绍多种BIM技术在设计、商务、施工中的综合应用,针对关键问题利用BIM技术提出更合理的解决方案,加强设计与商务、施工的深度融合,体现EPC工程总承包“协同、高效、共赢”的价值属性。 展开更多
关键词 EPC工程总承包 设计-施工一体化 BIM技术 设计管理 价值工程
下载PDF
基于VE理论的绿色建筑节能技术费用效益研究 被引量:3
14
作者 李辉山 范相弟 《建筑节能(中英文)》 CAS 2021年第7期127-132,共6页
增强绿色建筑节能技术的应用符合我国节约资源和保护环境的战略国策,但目前行业缺乏对绿色建筑节能技术费用和效益的客观评价和认识,对我国绿色建筑节能技术的推广和应用造成了一定的负面影响,制约了我国绿色建筑的发展。在对绿色建筑... 增强绿色建筑节能技术的应用符合我国节约资源和保护环境的战略国策,但目前行业缺乏对绿色建筑节能技术费用和效益的客观评价和认识,对我国绿色建筑节能技术的推广和应用造成了一定的负面影响,制约了我国绿色建筑的发展。在对绿色建筑节能技术的费用和效益定量分析的基础上,从全生命周期的视角出发,基于价值工程理论构建绿色建筑节能技术的费用效益评价模型,并结合实际案例研究绿色建筑节能技术的费用和效益之间的关系。案例分析结果与实际相符,即应用绿色建筑节能技术可以节约能源,为建设项目创造显著的社会效益和经济效益。 展开更多
关键词 绿色建筑 节能技术 费用 效益 价值工程
下载PDF
VE在中国的实践应用实证分析:成就和困惑 被引量:11
15
作者 张彩江 《价值工程》 2007年第6期1-5,共5页
自价值工程(VE)引入中国后,曾被迅速推广应用,并在20世纪80年代和90年代初达到一个高潮。此后,VE应用便进入了一个相对低谷阶段。首先从VE推广应用的模式、VE应用的领域分布、VE学习培训以及VE的组织建设方面回顾了VE在中国的应用实践沿... 自价值工程(VE)引入中国后,曾被迅速推广应用,并在20世纪80年代和90年代初达到一个高潮。此后,VE应用便进入了一个相对低谷阶段。首先从VE推广应用的模式、VE应用的领域分布、VE学习培训以及VE的组织建设方面回顾了VE在中国的应用实践沿革,并指出其局限性;其次,从理论上对这种应用作了阶段性划分,揭示出VE在中国应用发展所遭遇的瓶颈。 展开更多
关键词 价值工程(ve) 应用模式 发展沿革 成就和困惑
下载PDF
价值管理(VM):基于价值创造的新型企业管理理念 被引量:5
16
作者 莫少颖 《价值工程》 2005年第11期55-57,共3页
价值管理是以价值创造为核心的新型企业管理理念,从战略的角度对企业的资源进行系统的整合和优化,以求实现企业整体价值最大化。
关键词 企业价值 价值管理 价值创造
下载PDF
工业工程与质量工程在产业园区价值管理中的作用
17
作者 肖泽 高春彦 《价值工程》 2024年第13期17-19,共3页
随着全球经济的快速发展和竞争加剧,产业园区在推动经济增长和创造就业机会方面发挥着至关重要的作用。产业园区作为集成企业、资源和服务的重要平台,扮演着协调和促进各种产业活动的角色,进一步推动了现代经济体系的发展。本论文旨在... 随着全球经济的快速发展和竞争加剧,产业园区在推动经济增长和创造就业机会方面发挥着至关重要的作用。产业园区作为集成企业、资源和服务的重要平台,扮演着协调和促进各种产业活动的角色,进一步推动了现代经济体系的发展。本论文旨在探讨工业工程和质量工程在产业园区价值管理中的作用。重点关注它们如何共同协作,提高生产效率、降低生产成本、改善产品和服务质量,以及增强客户满意度。 展开更多
关键词 工业工程 质量工程 产业园区 价值管理
下载PDF
计算机辅助价值工程(CAVE)的研析 被引量:4
18
作者 陈洁 《价值工程》 2005年第12期61-63,共3页
本文在分析价值工程工作流程的基础上,研究应用信息技术辅助管理价值工程项目的必要性、可行性及重大意义,并提出了一个实现价值工程工作流程计算机辅助管理的解决方案。
关键词 价值工程 辅助管理 信息技术
下载PDF
首尔图书馆新建项目全寿命周期设计阶段成本管理中VE的应用 被引量:1
19
作者 方光秀 林弘喆 《建筑管理现代化》 2009年第5期413-417,共5页
以韩国首尔图书馆新建项目的全寿命周期设计阶段成本管理中VE的应用为例,着重论述其在建设项目的主体结构和建筑外墙装饰设计方案优选中的应用,并结合权重分析和敏感度分析使方案优选更具科学性,为提高图书馆建设项目的科学决策提供了... 以韩国首尔图书馆新建项目的全寿命周期设计阶段成本管理中VE的应用为例,着重论述其在建设项目的主体结构和建筑外墙装饰设计方案优选中的应用,并结合权重分析和敏感度分析使方案优选更具科学性,为提高图书馆建设项目的科学决策提供了部分参考,实际应用表明其全寿命期中设计阶段应用价值工程进行成本管理,可以优化设计,从而使工程设计质量得以提高,同时也降低建设成本、增强市场竞争能力,赢得业主的信任。 展开更多
关键词 价值工程 全寿命周期成本 成本分析 敏感度分析 维持管理
下载PDF
工程建设产业价值流与资金流融合管理研究
20
作者 霍如路 孟帅 《建筑经济》 2024年第10期84-90,共7页
在传统的工程建设产业管理模式下,产业的价值流和资金流呈现出分离的状态,这种状态是造成产业资金周转周期长的原因,而当下的解决方案是添加诸如预付款、材料专项款、垫资中介、农民工工资管理制度等制度补丁。首先重新定义产业价值,继... 在传统的工程建设产业管理模式下,产业的价值流和资金流呈现出分离的状态,这种状态是造成产业资金周转周期长的原因,而当下的解决方案是添加诸如预付款、材料专项款、垫资中介、农民工工资管理制度等制度补丁。首先重新定义产业价值,继而对产业价值和资金的转换过程进行分析,在此基础上提出两种新的价值流和资金流的管理模式,最终达到让产业价值和资金从分离到融合,从相互制约到相互赋能的目的。 展开更多
关键词 融合管理 工程 价值流 资金流 产业
下载PDF
上一页 1 2 22 下一页 到第
使用帮助 返回顶部