Xiangfan Coal-fired Power Plant - a matched large power plant for Three Gorges Project starts to construct
1
《Electricity》 1996年第4期44-44,共1页
Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November... Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November 29, 1996. 展开更多
关键词 project Xiangfan coal-fired power plant a matched large power plant for Three Gorges project starts to construct
下载PDF
基于模糊层次分析法的越南燃煤电厂BOT项目风险管理研究 被引量:3
2
作者 史馨萍 李伟亮 《工程造价管理》 2021年第1期72-78,共7页
越南作为我国友好邻邦,是“一带一路”沿线上的主要国家之一。其近年来加大了对外开放力度,促使越来越多国家和地区的资金向其涌入,也倍受我国电力企业的青睐。虽然越南与我国在文化、社会风俗、民族文化、生活方式、建设社会主义市场... 越南作为我国友好邻邦,是“一带一路”沿线上的主要国家之一。其近年来加大了对外开放力度,促使越来越多国家和地区的资金向其涌入,也倍受我国电力企业的青睐。虽然越南与我国在文化、社会风俗、民族文化、生活方式、建设社会主义市场经济等方面有许多相同点,但是在急速发展的社会、经济环境下,电力建设项目全寿命周期长造成管理过程中存在的不确定因素很多,这使得我国各企业提高了境外电力建设项目风险管理重视度。文章基于模糊层次分析法设计了越南燃煤电厂BOT项目风险评估方案与流程;建立了越南燃煤电厂BOT项目风险评估层次分析模型及其评价指标体系;将越南燃煤电厂BOT项目风险分为两国关系、恐怖事件、政策影响、行业改制和融资风险等21项风险因素,计算各风险因素权重,有效评价越南燃煤BOT项目风险,并基于项目管理全寿命周期理论,给出了风险防护措施及建议。 展开更多
关键词 越南燃煤电厂bot项目 风险管理 模糊层次分析法
下载PDF