The Shanghai Waigaoqiao Bonded Area Harbour Corporation has been developed for five years. In 1995, the corporation handled 2.26 million tons of cargo including 120,000 containers. The year 1996 also witnessed a sharp...The Shanghai Waigaoqiao Bonded Area Harbour Corporation has been developed for five years. In 1995, the corporation handled 2.26 million tons of cargo including 120,000 containers. The year 1996 also witnessed a sharp increase in cargo turnover. The Waigaoqiao Harbour, situated in the northeast corner of Pudong and facing the mouth of the Yangtze River,展开更多
The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storag...The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storage capacity and good thermal insulation, so the metal temperature of first stage of HP cylinder (FSMTI) may reach 400-450℃ after shut down and it takes 7-8 days to cool to 150℃ by natural cooling, Now with a forced cooling system the cooling time may be reduced to 40 hours, so that the turbine may be opened for repair work in about 5-6 days. The cooling system for #2 unit and test procedure are briefly described below.展开更多
This article discusses the planning and development Project of Waigaoqiao Tax-Ex-empt Zone, the first of its kind in China’s attempt to open up free ports, during the processof developing Pudong, Shanghai.
This year mark s the 20th anniversary of the establishment of CSSC Shanghai Waigaoqiao Shipbuilding Co., Ltd. In the past 20 years , under the leadership of CSSC, Waigaoqiao Shipbuilding has carried forward the entrep...This year mark s the 20th anniversary of the establishment of CSSC Shanghai Waigaoqiao Shipbuilding Co., Ltd. In the past 20 years , under the leadership of CSSC, Waigaoqiao Shipbuilding has carried forward the entrepreneurial spirit of taking the world first and built a beach in the Yangtze River Estuary into a modern ship assembly plant with beautiful environment, advanced facilities and world reputation.展开更多
Microbes play multiple roles in the marine ecosystem,with a variety of functions. Luchao Port,Yangshan Port and Waigaoqiao Port are three major ports near the coast of Shanghai,and it is necessary to study the abundan...Microbes play multiple roles in the marine ecosystem,with a variety of functions. Luchao Port,Yangshan Port and Waigaoqiao Port are three major ports near the coast of Shanghai,and it is necessary to study the abundance and water environment of microbes. The distribution of hydrological and chemical characteristics shows that the distribution of temperature,salinity,dissolved oxygen and nutrient salt exhibit certain seasonal characteristics in the surface waters. Correlation analysis indicates that the temperature of surface waters is positively correlated with the number of microbes,but not very clear; salinity is significantly positively correlated with it; dissolved oxygen is negatively correlated with it; the correlation between nutrient salt and abundance of microbes is complicated,but not very significant( P > 0. 05).展开更多
文摘The Shanghai Waigaoqiao Bonded Area Harbour Corporation has been developed for five years. In 1995, the corporation handled 2.26 million tons of cargo including 120,000 containers. The year 1996 also witnessed a sharp increase in cargo turnover. The Waigaoqiao Harbour, situated in the northeast corner of Pudong and facing the mouth of the Yangtze River,
文摘The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storage capacity and good thermal insulation, so the metal temperature of first stage of HP cylinder (FSMTI) may reach 400-450℃ after shut down and it takes 7-8 days to cool to 150℃ by natural cooling, Now with a forced cooling system the cooling time may be reduced to 40 hours, so that the turbine may be opened for repair work in about 5-6 days. The cooling system for #2 unit and test procedure are briefly described below.
文摘This article discusses the planning and development Project of Waigaoqiao Tax-Ex-empt Zone, the first of its kind in China’s attempt to open up free ports, during the processof developing Pudong, Shanghai.
文摘This year mark s the 20th anniversary of the establishment of CSSC Shanghai Waigaoqiao Shipbuilding Co., Ltd. In the past 20 years , under the leadership of CSSC, Waigaoqiao Shipbuilding has carried forward the entrepreneurial spirit of taking the world first and built a beach in the Yangtze River Estuary into a modern ship assembly plant with beautiful environment, advanced facilities and world reputation.
基金Supported by Social Development Fund of Shanghai Science and Technology Commission(09DZ120010C)
文摘Microbes play multiple roles in the marine ecosystem,with a variety of functions. Luchao Port,Yangshan Port and Waigaoqiao Port are three major ports near the coast of Shanghai,and it is necessary to study the abundance and water environment of microbes. The distribution of hydrological and chemical characteristics shows that the distribution of temperature,salinity,dissolved oxygen and nutrient salt exhibit certain seasonal characteristics in the surface waters. Correlation analysis indicates that the temperature of surface waters is positively correlated with the number of microbes,but not very clear; salinity is significantly positively correlated with it; dissolved oxygen is negatively correlated with it; the correlation between nutrient salt and abundance of microbes is complicated,but not very significant( P > 0. 05).