期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
Water pollution control planning for the Taizi River watershed
1
作者 Jiang Weigong Sun Hong(Benxi Environmental Monitoring Station, Liaoning Province ,Benxi 117021,China)Guo Huaicheng Song Guojun (Center for Environmental Sciences,Peking University.Beijing 100871.China) 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 1996年第1期110-119,共10页
Water pollution control planning for the Taizi River watershed,a typical Chinese case study,is presented in this paper. Based on comprehensive analysis.water quality in the watershed was assessed and predicated;water ... Water pollution control planning for the Taizi River watershed,a typical Chinese case study,is presented in this paper. Based on comprehensive analysis.water quality in the watershed was assessed and predicated;water quality models for the river and reservoir were built;and function of water bodies and environmental assimilative capacity were determined ;and then the planning for industrial pollution sources and concentrated sewage treatment were made respectively. 展开更多
关键词 water pollution control planning water quality model benefit-cost analysis.
下载PDF
System engineering for water pollution control at the watershed level in China 被引量:2
2
作者 Wei MENG 《Frontiers of Environmental Science & Engineering》 SCIE EI CSCD 2009年第4期443-452,共10页
The present water pollution situation at watershed level in China has been systematically analyzed.The causes of water pollution are attributed to the extensive economic developmental pattern,poor wastewater treatment... The present water pollution situation at watershed level in China has been systematically analyzed.The causes of water pollution are attributed to the extensive economic developmental pattern,poor wastewater treatment,and a lack of nonpoint pollution control.The problems of water pollution control at watershed level include a lack of thought and approach,developmental delay in the environmental standard system,an inadequate monitoring ability,and an inefficient implementation of laws and regulations.From 2006 to 2020,water pollution control and governance will be a national key specific project of science and technology in China.The strategies of this project include establishing a water pollution control system at watershed level,orienting a healthy aquatic ecosystem,conducting risk management,and using comprehensive methods.The goal is to establish and complete a technological system of pollution control and management in three five-year phases.The main tasks are to develop common technologies,management systems,and mechanisms for lake eutrophication control,river pollution control,urban water environmental pollution control,potable water safety,and water environmental management.The bottlenecks of water pollution control and management in China could be systematically removed,and the demonstration of the system engineering approach will be conducted at selected key watersheds. 展开更多
关键词 water pollution control waterSHED system engineering SUSTAINABILITY integrated watershed management key specific project of science and technology
原文传递
Post-evaluation of a water pollution control plan: methodology and case study 被引量:1
3
作者 Lin ZENG Xin DONG Siyu ZENG Tianzhu ZHANG Jing LI Jining CHEN 《Frontiers of Environmental Science & Engineering》 SCIE EI CAS CSCD 2015年第4期712-724,共13页
China has developed more than 20 water pollution control plans for river basins (RBWPs) since 1996. However, the implementation has generally lagged. This paper proposes a three-step, post-evaluation methodology to ... China has developed more than 20 water pollution control plans for river basins (RBWPs) since 1996. However, the implementation has generally lagged. This paper proposes a three-step, post-evaluation methodology to analyze the implementation result of a RBWP and its influential factors. First, a multi-attribute evaluation method based on an index system is established to score the enforcement results of a RBWP. Indicators measure how well a RBWP has achieved its objectives, which include water quality compliance, pollution load control, project construction, financial inputs, and related management requirements. Second, an interpretive structural model is used to detect the significant factors that affect RBWP implementation. This model can effectively analyze the cause-effect chain and hierarchical relationship among variables. Five groups of factors were identified, namely, plan preparation, water resource endowment, policy, institution, and management. Both qualitative and quantitative methods are employed in the third step to evaluate the extent to which these factors have influenced the execution result of a RBWP, including pre-post contrast, scenario analysis, and correlation analysis. This research then post-evaluated the implementation of the Huai River Basin water pollution control plans (H-RBWPs) over a period of 10 years as a case study. Results showed that the implementation of the H-RBWPs was unsatisfactory during 2001–2005, although it improved during 2006–2010. The poor execution of these plans was partially caused by the underestimation of regional economic development in combination with ineffective industrial structure adjustment policies. Therefore, this case study demonstrates the feasibility and flexibility of the proposed post-evaluation methodology. 展开更多
关键词 river basin water pollution control plan postplan evaluation multi-attribute comprehensive evaluation interpretive structural model combined qualitative/quantitative method
原文传递
Implications of Declining Ground Water and Water Quality in the Greater Okefenokee Swamp Basin for Survival and Recovery of Federally Endangered and Threatened Marine and Aquatic Species and Critical Habitat in the US Southeastern Coastal Plain Ecoregion—Part 2
4
作者 Sydney T. Bacchus 《Journal of Geoscience and Environment Protection》 2023年第4期86-156,共71页
The Floridan aquifer system underlies the United States (US) Southeastern Coastal Plain Physiographic Region. Anthropogenic groundwater declines in that regional karst aquifer system, via semi-confining zones, have be... The Floridan aquifer system underlies the United States (US) Southeastern Coastal Plain Physiographic Region. Anthropogenic groundwater declines in that regional karst aquifer system, via semi-confining zones, have been documented in published literature for decades. These anthropogenic groundwater declines reduce surfacewater levels and flows, which increases saltwater intrusion and alters the physical, chemical, and biological integrity of the nation’s waters, in violation of the US Clean Water Act (CWA) of 1972. Historic groundwater declines from mining and other anthropogenic groundwater withdrawals from this regional karst aquifer system already threaten the survival and recovery of marine and aquatic federally endangered and threatened species, as well as existing and proposed critical habitat for those species within the Southeastern Coastal Plain Ecoregion. Examples of marine and aquatic species and their designated critical habitat adversely affected by groundwater declines in the Greater Okefenokee Swamp Basin of this ecoregion include the federally endangered south Atlantic Distinct Population Segments (DPS) of the Atlantic sturgeon (Acipenser oxyrinchus oxyrinchus), shortnose sturgeon (Acipenser brevirostrum), and oval pigtoe mussel (Pleurobema pyriforme), as well as the federally threatened Gulf subspecies of the Atlantic sturgeon (Acipenser oxyrinchus desotoi) and Suwannee moccasinshell (Medionidus walkeri). In 2020, rules were adopted by two federal agencies allowing significant further degradation of the physical, chemical, and biological integrity of the nation’s waters that are essential for maintaining federally listed species and their habitat in this Ecoregion. The US Fish and Wildlife Service (USFWS) has acknowledged the harm to these species and critical habitat from mining and additional groundwater alterations, but no comprehensive Areawide Environmental Impact Statement (AEIS), similar to the AEIS required for mining within the Peace River Basin, has been conducted for any of the numerous mining projects that are expanding and proposed within the Greater Okefenokee Swamp Basin to evaluate all indirect and cumulative adverse impacts to all federally listed species. 展开更多
关键词 Environmental Laws and Regulations Federal water pollution control Act Groundwater Capture Induced Recharge Inter-Basin Flow
下载PDF
STUDY ON THE POLLUTION OF URBAN SCENIC WATER BODY BY MUNICIPAL DRAINAGE IN FLOOD SEASON AND ITS CONTROL PLANNING 被引量:3
5
作者 TIAN Yi-mei ZHOU Ying +2 位作者 Li Hong LIU Zhi-qiang PENG Xiu-hua 《Journal of Hydrodynamics》 SCIE EI CSCD 2008年第6期797-803,共7页
In this article, based on river quality simulation and system optimization, a water quality model was established for scenic river after rainfall discharge in flood season, with the target of making water pollutants m... In this article, based on river quality simulation and system optimization, a water quality model was established for scenic river after rainfall discharge in flood season, with the target of making water pollutants meet the standard in priority and saving expenditure on pollution control. With the principle of reducing sewage from combined sewage pumping station and heavily polluted initial rainwater, a mathematical multiobjective planning model was constructed for rain sewage pollution control in flood season, and one scenic river in a northern city was taken for simulation example. The results show that: the optimization result meets the requirements of planning, among which, sewage reduction from the combined pumping station accounts for 17.38% in the total reduction of rain sewage, and the reduction in the heavily polluted rain water accounts for 77.24% in the total reduction of rainwater pumping station. The planning scheme can provide theoretical basis for pollution control of scenic river in flood season, and for rational reconstruction and layout of outfalls along two banks of the river. 展开更多
关键词 scenic river flood season water quality simulation water pollutant controlling multiobjective planning
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部