期刊文献+
共找到2,485篇文章
< 1 2 125 >
每页显示 20 50 100
Overburden fracture evolution laws and water-controlling technologies in mining very thick coal seam under water-rich roof 被引量:8
1
作者 Zhang Youxi Tu Shihao +1 位作者 Bai Qingsheng Li Jianjun 《International Journal of Mining Science and Technology》 SCIE EI 2013年第5期693-700,共8页
Considering the danger of water inrush in mining very thick coal seam under water-rich roof in Majialiang Coal Mine,the universal discrete element(UDEC)software was used to simulate the overburden fracture evolution l... Considering the danger of water inrush in mining very thick coal seam under water-rich roof in Majialiang Coal Mine,the universal discrete element(UDEC)software was used to simulate the overburden fracture evolution laws when mining 4#coal seam.Besides,this study researched on the influence of face advancing length,speed and mining height on the height of the water flowing fractured zones(HWFFZ),and analyzed the correlation of face advancing length and change rules of aquifer water levels and goaf water inflow.Based on those mentioned above,this research proposed the following water-controlling technologies:draining the roof water before mining,draining goaf water,reasonable advancing speed and mining thickness.These water-controlling technologies were successfully used in the feld,thus ensured safely mining the very thick coal seam under water-rich roof. 展开更多
关键词 water-rich roof Very thick coal seam Mining induced fracture Evolution law Water-controlling technology
下载PDF
Seepage field distribution and water inflow laws of tunnels in water-rich regions 被引量:6
2
作者 LI Zheng CHEN Zi-quan +2 位作者 HE Chuan MA Chun-chi DUAN Chao-ran 《Journal of Mountain Science》 SCIE CSCD 2022年第2期591-605,共15页
Currently,the water inrush hazards during tunnel construction,the water leakage during tunnel operation,and the accompanying disturbances to the ecological environment have become the main problems that affect the str... Currently,the water inrush hazards during tunnel construction,the water leakage during tunnel operation,and the accompanying disturbances to the ecological environment have become the main problems that affect the structural safety of tunnels in water-rich regions.In this paper,a tunnel seepage model testing system was used to conduct experiments of the grouting circle and primary support with different permeability coefficients.The influences of the supporting structures on the water inflow laws and the distribution of the water pressure in the tunnel were analyzed.With the decrease in the permeability coefficient of the grouting circle or the primary support,the inflow rate of water into the tunnel showed a non-linear decreasing trend.In comparison,the water inflow reduction effect of grouting circle was much better than that of primary support.With the increase of the permeability coefficient of the grouting ring,the water pressure behind the primary lining increases gradually,while the water pressure behind the grouting ring decreases.Thus,the grouting of surrounding rock during the construction of water-rich tunnel can effectively weaken the hydraulic connection,reduce the influence range of seepage,and significantly reduce the decline of groundwater.Meanwhile,the seepage tests at different hydrostatic heads and hydrodynamic heads during tunnel operation period were also conducted.As the hydrostatic head decreased,the water pressure at each characteristic point decreased approximately linearly,and the water inflow rate also had a gradual downward trend.Under the action of hydrodynamic head,the water pressure had an obvious lagging effect,which was not conducive to the stability of the supporting structures,and it could be mitigated by actively regulating the drainage rate.Compared with the hydrostatic head,the hydrodynamic head could change the real-time rate of water inflow to the tunnel and broke the dynamic balance between the water pressure and water inflow rate,thereby affecting the stress state on the supporting structures. 展开更多
关键词 water-rich tunnel Seepage field distribution Water inflow law Construction period Operation period
下载PDF
Application of 3-D Parallel Electrical Technology Detecting the Water-Rich Areas
3
作者 Xuan Wang Liquan Guo 《Open Journal of Geology》 2014年第10期518-523,共6页
Coal working face is damaged more and more seriously by water below the coal face floor. Therefore, floor water detection is a must in the process of extraction. This article aims to introducing application and princi... Coal working face is damaged more and more seriously by water below the coal face floor. Therefore, floor water detection is a must in the process of extraction. This article aims to introducing application and principle of the two-gateways parallel 3-D electrical technology and the arrangement of the observation system. The authors use this method to detect the water under the floor of a mine in north of Anhui. The results show that the two-gateways parallel 3-D electrical technology can accurately locate the water-rich areas, providing the basis for drilling drainage and grouting construction. 展开更多
关键词 The Two-Gateways PARALLEL 3-D Electrical Technology Coal Face FLOOR water-rich Areas
下载PDF
Water shutoff model test in water-rich sandy stratum by phosphoric acid-water glass grout 被引量:3
4
作者 杨宇友 倪茂光 《Journal of Central South University》 SCIE EI CAS 2014年第10期4014-4020,共7页
The rheological behavior of phosphoric acid-water glass grout in different mixing ratios was studied. Grout made of water glass with Baume degree of 20° and 13.4% phosphoric acid by 1:1 volume ratio is found to b... The rheological behavior of phosphoric acid-water glass grout in different mixing ratios was studied. Grout made of water glass with Baume degree of 20° and 13.4% phosphoric acid by 1:1 volume ratio is found to be more effective in stopping water. Laboratory model test of water shutoff by grouting was conducted. Test results show that the diffusion length and water cutoff effect of the grout are significantly improved as the grout head is raised, due to the dilution of underground water, and it takes the grout longer than its gel time to cut off water. 展开更多
关键词 水模型试验 灌浆水 水玻璃 过磷酸 砂质地层 流变行为 混合比例 扩散长度
下载PDF
Numerical research on stability control of roofs of water-rich roadway 被引量:2
5
作者 Meng Chao Li Xuehua +1 位作者 Yao Qiangling Zhou Jian 《International Journal of Mining Science and Technology》 SCIE EI 2014年第3期409-416,共8页
In order to study the strength-weakening law of roofs of water-rich roadway, this study used FLAC software, and simulated and analyzed the failure characteristics of the surrounding rock of water-rich roadway under th... In order to study the strength-weakening law of roofs of water-rich roadway, this study used FLAC software, and simulated and analyzed the failure characteristics of the surrounding rock of water-rich roadway under the condition of different cross sections and support parameters, finally obtained the stress distribution of the principle stress of the roadway as well as the displacement variation of its surrounding rock. Results indicate that the roof stability of roadway with semicircular cross section is better than the roadway with inclined rectangular cross section under water-rich condition. Besides, the surrounding rock deformation of roadway under the action of water shows a pronounced increase compared to the roadway without the action of water due to the fact that water will obviously weaken the surrounding rock of roadway, especially its roof. It is very beneficial to control roof stability of water-rich roadway and guarantee the roadway stability during its service life by improving the pretension of bolt and cable as well as decreasing inter-row spacing of the bolt. 展开更多
关键词 巷道稳定性 稳定性控制 富水 数值研究 屋顶 矩形横截面 顶板稳定性 围岩变形
下载PDF
Stability analysis and grouting treatment of inclined shaft lining structure in water-rich strata: A case study
6
作者 Zhaopeng Ren Cun Zhang +2 位作者 Yongle Wang Shiyong Lan Shiqi Liu 《Geohazard Mechanics》 2023年第4期308-318,共11页
The stability of inclined shaft lining structure (ISLS) in complex water-rich strata is affected by many factors, suchas water pressure, joint, soft rock, lining corrosion and so on. The instability of the ISLS will a... The stability of inclined shaft lining structure (ISLS) in complex water-rich strata is affected by many factors, suchas water pressure, joint, soft rock, lining corrosion and so on. The instability of the ISLS will affect the safe andefficient coal mine production. Bathe sed on the geological conditions of the Xiaobaodang coal mine, this papertested the evolution characteristics of concrete composition in long-term water seepage areas and revealed theinfluence mechanism of corrosion weakening of shaft lining (SL) in water-rich strata. Meanwhile, transientelectromagnetic, ground penetrating radar, and infrared monitoring are used to detect the water-rich zones, anddamage zones of surrounding rock and lining water seepage zones, and a three-level safety evaluation model forthe instability risk of ISLS is constructed. Water abundance of the surrounding rock, surrounding rock deterioration, and shaft lining seepage were the specific indicators in the model. The main inclined shaft (MIS) in thestudied coal mine is divided into three levels: non instability risk zone, potential instability risk zone, and highinstability risk zone. According to the evaluation results, comprehensive prevention and control measures of“hydrophobic hole drainage” and “back-lining grouting” are adopted for the water inrush source and the surrounding rock micro-crack water channel. The precise prevention and control of ISLS is realized. The researchresults also provide a reference for the stability evaluation of ISLS and the accurate prevention and control undersimilar conditions. 展开更多
关键词 Inclined shaft lining structure Stability evaluation water-rich strata Field measurement GROUTING
原文传递
富水裂隙围岩隧道涌水量计算方法与规律分析
7
作者 傅鹤林 安鹏涛 +2 位作者 伍毅敏 李鲒 陈龙 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2024年第3期110-116,共7页
富水裂隙区隧道涌水量预测精度较差,涌水问题尚未得到较好的解决。针对此问题,视裂隙围岩及注浆区为非均质各向异性介质,初期支护及二次支护结构为均质各向同性介质,构建了裂隙围岩下隧道涌水简化计算模型,基于地下水力学理论及流体质... 富水裂隙区隧道涌水量预测精度较差,涌水问题尚未得到较好的解决。针对此问题,视裂隙围岩及注浆区为非均质各向异性介质,初期支护及二次支护结构为均质各向同性介质,构建了裂隙围岩下隧道涌水简化计算模型,基于地下水力学理论及流体质量守恒定律推导了富水裂隙区隧道涌水量计算公式。通过退化分析及案例工程现场实测数据验证了构建富水裂隙区隧道涌水简化计算模型的合理性及涌水量计算式求解的正确性,最后基于解析解揭示了各特征参数对富水裂隙区隧道涌水的影响规律,探讨了富水裂隙区隧道涌水机制。结果表明:理论计算值与现场实测值最大相对误差为8.1%,验证了构建模型的合理性及公式推导的正确性;隧道涌水量随裂隙最大宽度的增加而增大,受堵水结构的联合制约,两者近似呈线性关系;注浆区厚度与隧道半径比值在2倍以内时,隧道涌水量受注浆区厚度的影响显著;富水裂隙区隧道涌水受裂隙分布规律及支护结构的制约,应重视对裂隙分布的调查。 展开更多
关键词 富水裂隙 涌水量 注浆加固 涌水灾害 支护结构
下载PDF
基于水平旋喷桩处置优化的地铁隧道施工变形控制分析
8
作者 王立新 高洋 +2 位作者 汪珂 李储军 邱军领 《河北工程大学学报(自然科学版)》 CAS 2024年第1期52-61,共10页
为研究富水砂层隧道中水平旋喷桩+超前小导管组合预加固的效果,以青岛地铁某区间段隧道为依托,采用有限元数值模拟方法,对比分析了无预加固、单独使用水平旋喷桩及旋喷桩配合超前小导管组合预加固三种工况的加固效果。结果表明,与无预... 为研究富水砂层隧道中水平旋喷桩+超前小导管组合预加固的效果,以青岛地铁某区间段隧道为依托,采用有限元数值模拟方法,对比分析了无预加固、单独使用水平旋喷桩及旋喷桩配合超前小导管组合预加固三种工况的加固效果。结果表明,与无预加固方案相比,单独使用水平旋喷桩预加固可使地表沉降、拱顶沉降、掌子面纵向位移分别相应减少约61%、59%、38%;而水平旋喷桩与超前小导管组合预加固方案可使地表沉降、拱顶沉降、掌子面纵向位移分别相应减少约66%、77.6%、38.9%,典型开挖断面处与拱脚处地下水渗流量分别减少93.4%、96.7%,预加固效果与止水效果显著。 展开更多
关键词 水平旋喷桩 富水砂层 数值模拟 止水效果 预加固
下载PDF
富水砂层地铁盾构隧道渣土混合改良的流塑性与渗透性
9
作者 郑选荣 刘莹 +4 位作者 丁鹏程 李鹏 郭峰 陆宏朝 李军锋 《城市轨道交通研究》 北大核心 2024年第3期37-42,共6页
[目的]盾构在富水砂层中掘进时,易产生刀盘扭矩过高、磨损严重以及螺旋运输机喷涌等问题。为了保证施工的安全性,需对渣土进行改良。[方法]以西安地铁16号线某盾构区间工程为依托,根据砂土地层自稳性差、摩擦性高、渗透率高的特点选取... [目的]盾构在富水砂层中掘进时,易产生刀盘扭矩过高、磨损严重以及螺旋运输机喷涌等问题。为了保证施工的安全性,需对渣土进行改良。[方法]以西安地铁16号线某盾构区间工程为依托,根据砂土地层自稳性差、摩擦性高、渗透率高的特点选取渣土改良剂。通过渣土坍落度试验、渗透试验、现场试验相结合的方式,采用泡沫单独改良、泡沫及膨润土泥浆混合改良两种方案开展富水砂层渣土改良试验研究。[结果及结论]实际盾构掘进施工中,在考虑安全、高效、经济的前提下,结合室内试验所得数据,确定采用膨润土泥浆、泡沫混合改良的方案。当膨润土与水质量比为1/8,发泡液质量分数为3%时,改良剂性能满足施工要求;泡沫单独改良渣土受含水率影响大,含水率越高,泡沫最佳注入率越小。中砂的最佳改良方案是BIR(膨润土泥浆注入比)为10%,FIR(泡沫注入率)为20%~25%;砾砂的最佳改良方案是BIR为10%,FIR为35%~40%。工程实践表明,渣土混合改良效果良好,盾构掘进参数平稳。 展开更多
关键词 地铁 盾构隧道 渣土混合改良 流塑性 渗透性 富水砂层
下载PDF
富水砂层中盾构始发穿越既有地铁线路的结构稳定性研究
10
作者 麻凤海 张强强 《城市轨道交通研究》 北大核心 2024年第4期150-154,共5页
[目的]富水砂层地质条件下,新建地铁线路盾构始发穿越既有地铁线路时,对既有地铁线路结构稳定性的研究较为鲜见,需总结类似工程的相关规律。[方法]以新建的郑州地铁7号线黄河迎宾馆站—英才街站区间盾构始发穿越既有地铁2号线结构工程... [目的]富水砂层地质条件下,新建地铁线路盾构始发穿越既有地铁线路时,对既有地铁线路结构稳定性的研究较为鲜见,需总结类似工程的相关规律。[方法]以新建的郑州地铁7号线黄河迎宾馆站—英才街站区间盾构始发穿越既有地铁2号线结构工程为依托,根据实际工况采用有限元软件MIDAS GTS NX建立了施工区间的三维数值模型,并利用软件的结果提取功能得到了该工程对应模型的模拟结果。选取现场2个监测点位,将2个测点的现场实测值与模拟计算值进行对比,证实了该模型的准确性。在此基础上,进一步研究了盾构始发穿越、一般下穿施工两种穿越方式下对既有地铁线路结构稳定性的影响,以及始发洞门与既有地铁结构间竖向距离d的4个取值对既有地铁线路结构稳定性的影响。[结果及结论]所建三维模型在一定程度上可反映实际工况。在既有地铁线路结构、材料、加固方式等因素均不变的情况下,既有地铁线路结构的稳定性因穿越方式的不同而有所差异,与一般下穿施工相比,采用盾构始发下穿方式时对既有地铁线路结构的影响较小。采用盾构始发下穿方式时,d的取值不同,对既有地铁线路结构稳定性的影响有较大差异。d=2.00 m对既有地铁线路结构的影响较小,工程成本也较小。建议在工程条件允许下采用盾构始发下穿方式,且推荐d值取2.00 m。 展开更多
关键词 地铁 盾构施工 富水砂层 盾构始发穿越 结构稳定性
下载PDF
基于DNN的煤矿富水区探测反演方法研究
11
作者 韩晓冰 王鑫磊 +1 位作者 周远国 刘洋 《煤炭技术》 CAS 2024年第4期140-145,共6页
提出了一种基于DNN的煤矿富水区探测反演算法,该算法可以快速准确地实现煤矿富水区二维分布模型的重建。首先,利用时域有限差分方法(FDTD)获得不同分布模型的数值解;随后,依据数据样本搭建网络框架,网络的输入主要为电场分量,输出为相... 提出了一种基于DNN的煤矿富水区探测反演算法,该算法可以快速准确地实现煤矿富水区二维分布模型的重建。首先,利用时域有限差分方法(FDTD)获得不同分布模型的数值解;随后,依据数据样本搭建网络框架,网络的输入主要为电场分量,输出为相应的模型电导率参数。通过对神经网络进行训练,得到网络的最优系数,随后对富水区分布进行反演预测;结果表明:DNN算法在单个小目标异常体反演中,可以有效克服BP神经网络模型失效的问题,且对于多目标异常体的反演效果更加准确。另外,相同数据集下,DNN的训练耗时与预测耗时也少于BP神经网络。实验结果表明,该算法可以有效提高煤矿富水区探测效率。 展开更多
关键词 煤矿富水区探测 二维反演 DNN 时域有限差分法
下载PDF
山西省五台县发现天然矿泉水开发潜力区
12
作者 孙岐发 王宏利 +10 位作者 凌昕 卢兵 国林 胡宸 孙靖尧 周龙 李昌 赵剑 刘昌吉 王旭 崔大鹏 《地质与资源》 CAS 2024年第1期131-134,共4页
利用调查、取样、化验、物探和钻探等方法手段,对山西五台地区的水文地质条件和地下水质现状进行了研究,发现该地区水质状态良好,部分区域锌(Zn)、锶(Sr)含量达到矿泉水标准,Zn最大值2.3 mg/L、Sr最大值1.17 mg/L,富Zn面积73.71 km^(2)... 利用调查、取样、化验、物探和钻探等方法手段,对山西五台地区的水文地质条件和地下水质现状进行了研究,发现该地区水质状态良好,部分区域锌(Zn)、锶(Sr)含量达到矿泉水标准,Zn最大值2.3 mg/L、Sr最大值1.17 mg/L,富Zn面积73.71 km^(2),富含Sr面积134.25 km^(2),实施探采结合井最终钻获高品质的水资源,在五台县实现了天然矿泉水潜力区的新突破,有力支撑了地方的健康饮水工程. 展开更多
关键词 地下水 矿泉水 富锌 富锶 五台县 山西省
下载PDF
大定源回线装置瞬变电磁法在煤矿采空区探测中的应用
13
作者 潘纪顺 张鑫 +2 位作者 陈世仲 张嘉乐 张允涛 《科技创新与应用》 2024年第14期137-140,共4页
该文通过研究大定源回线装置瞬变电磁法在煤矿采空区探测中的应用,旨在提高煤矿采空区探测的效率和准确性。深入探讨大定源回线装置瞬变电磁法的原理和工作机制。在此基础上,设计并实施适用于煤矿采空区的探测方案,并通过试验进行验证... 该文通过研究大定源回线装置瞬变电磁法在煤矿采空区探测中的应用,旨在提高煤矿采空区探测的效率和准确性。深入探讨大定源回线装置瞬变电磁法的原理和工作机制。在此基础上,设计并实施适用于煤矿采空区的探测方案,并通过试验进行验证。结果表明,大定源回线装置瞬变电磁法在煤矿采空区探测中取得显著的效果。大定源回线装置瞬变电磁法具有高效、准确、可靠的特点,能够快速识别采空区位置,为后续生产建设提供保障,同时也为其他煤矿采空区勘察提供参考。 展开更多
关键词 大定源回线装置 瞬变电磁法 煤矿采空区 富水 视电阻率
下载PDF
南京地铁7号线中胜站密贴下穿运营站MJS+水平冻结施工与实测研究
14
作者 耿天霜 张静 +2 位作者 赵记领 杨平 何文龙 《隧道建设(中英文)》 CSCD 北大核心 2024年第1期172-180,共9页
为解决南京新建地铁7号线在承压富水砂层近贴下穿既有10号线中胜站开挖时易发生涌砂涌水现象及冻结对既有线变形的影响问题,提出一种全方位高压喷射工法(metro jet system,MJS)+水平冻结法联合加固承压富水砂性地层的施工方法。根据实... 为解决南京新建地铁7号线在承压富水砂层近贴下穿既有10号线中胜站开挖时易发生涌砂涌水现象及冻结对既有线变形的影响问题,提出一种全方位高压喷射工法(metro jet system,MJS)+水平冻结法联合加固承压富水砂性地层的施工方法。根据实际工程,确定MJS+水平冻结加固工艺、加固参数、加固范围及冻结的方案,并通过数值模拟方法预测冻结温度场的变化规律、计算开始冻结的合理时间和积极冻结时间。对冻结过程中的土体温度、冻结及开挖过程中的既有车站底板位移进行监测,并在此基础上对暗挖方案进行优化。工程实践表明:1)冻结过程中中部MJS加固体温度一直高于端部MJS加固体温度,应当加强对中部位置温度的监测;2)冻土帷幕范围应控制在MJS加固体范围内,否则土体冻结会对冻胀变形影响较大,为此提出了上部钻孔取土泄压及间歇冻结的方案,可在一定程度上减小冻胀;3)本工程冻结及开挖阶段既有车站结构变形较小,减小了对近贴既有车站结构的影响;4)优化后的暗挖方案可加快施工进度,原开挖时间约80 d,优化后开挖时间缩短至66 d。 展开更多
关键词 地铁车站 富水砂层 MJS 水平冻结法 冻胀变形
下载PDF
侧部承压溶洞与深埋隧道间隔水岩体安全厚度研究
15
作者 乔栋磊 李文杰 +1 位作者 安艳军 梁斌 《长江科学院院报》 CSCD 北大核心 2024年第5期162-170,共9页
为保证深埋隧道安全通过侧部高压富水溶洞区段,在隧道突水发生机制分析与隔水岩体最小安全厚度划分的基础上,结合突变理论、鲁宾涅特方程及相关工程经验对隧道边墙岩体安全厚度进行研究,导出最小安全厚度计算公式,建立突水判据,分析相... 为保证深埋隧道安全通过侧部高压富水溶洞区段,在隧道突水发生机制分析与隔水岩体最小安全厚度划分的基础上,结合突变理论、鲁宾涅特方程及相关工程经验对隧道边墙岩体安全厚度进行研究,导出最小安全厚度计算公式,建立突水判据,分析相关影响因素对隧道边墙隔水岩体最小安全厚度的影响规律。结果表明:隔水岩体最小安全厚度H_(min)与围岩力学参数弹性模量E、内摩擦角φ呈正相关,与溶洞水压力q_(w)、岩梁跨度L及隧道埋深h呈负相关;各因素对H_(min)影响程度由大到小依次为h、φ、E、L与q_(w),其中h与φ影响程度相近,E在超过3 GPa的情况下H_(min)变化趋于平缓,E的影响程度与L相近;结合有限元模拟结果和工程实例分析,验证了H_(min)理论计算公式及突水判据的准确性与可行性,对相关工程建设具有指导意义。 展开更多
关键词 深埋岩溶隧道 富水溶洞 最小安全厚度 突变理论 突水判据
下载PDF
电解水作为饮用水在畜禽生产中的应用研究进展
16
作者 卢顾伟 臧一天 +1 位作者 欧阳克蕙 李艳娇 《中国畜牧杂志》 CAS CSCD 北大核心 2024年第2期23-29,共7页
饮用水是畜禽水分的主要来源,干净、充足的饮水是畜禽健康的重要保证之一。电解水具有抗菌性、无残留、无污染、价格低等特点,并具有一定的药理作用,在食品加工、医用消毒及畜禽栏舍消毒等方面有广泛应用。近来,可饮用电解水代替普通地... 饮用水是畜禽水分的主要来源,干净、充足的饮水是畜禽健康的重要保证之一。电解水具有抗菌性、无残留、无污染、价格低等特点,并具有一定的药理作用,在食品加工、医用消毒及畜禽栏舍消毒等方面有广泛应用。近来,可饮用电解水代替普通地下水作为畜禽饮用水成为研究的新焦点。本文综述了目前常用饮用类电解水的种类及其在畜禽生产中的主要应用,为电解水在畜禽生产中的安全应用提供参考。 展开更多
关键词 酸性电解水 碱性电解水 中性电解水 富氢水 畜禽生产
下载PDF
强富水区山岭隧道穿越断层破碎带施工技术研究
17
作者 谭艳臣 李德 +5 位作者 唐亮 常泽洲 王富春 宋健 王志浩 金熙宾 《科技创新与应用》 2024年第12期173-176,共4页
为降低隧道穿越断层破碎带施工中的涌水突泥风险,该文依托古兜山隧道实体工程,采用“TSP+地质雷达+超前地质钻孔”的地质超前预报技术,探明隧道掌子面前方的地层状况和富水程度,提出富水区隧道穿越断层破碎带施工关键技术。提出隧道洞... 为降低隧道穿越断层破碎带施工中的涌水突泥风险,该文依托古兜山隧道实体工程,采用“TSP+地质雷达+超前地质钻孔”的地质超前预报技术,探明隧道掌子面前方的地层状况和富水程度,提出富水区隧道穿越断层破碎带施工关键技术。提出隧道洞口明挖法与隧道洞内光面爆破技术及洞内围岩段的双侧壁导坑法、单侧壁导坑法、三台阶七部法的开挖方式;采用S-Ⅴb型隧道衬砌结构型式与全断面帷幕注浆、加强泄水等技术相结合的支护方式,其中的整体承载结构为初期支撑系统和二次模筑衬砌的组合结构。该施工关键技术可有效避免古兜山隧道施工的突水涌泥现象,可指导类似工程的施工。 展开更多
关键词 强富水区 断层破碎带 隧道 施工技术 超前探测
下载PDF
东胜气田致密高含水气藏合采气井层间干扰影响因素
18
作者 李阳 《天然气技术与经济》 2024年第2期14-19,共6页
为了明确鄂尔多斯盆地北缘致密高含水气藏合采气井层间干扰及其影响因素,指导同类型气藏合采气井高效开发,以该盆地北缘东胜气田致密高含水气藏为研究对象,分析了储集层地质条件、储集层改造对合采井产层段贡献的影响,指出了该类合采气... 为了明确鄂尔多斯盆地北缘致密高含水气藏合采气井层间干扰及其影响因素,指导同类型气藏合采气井高效开发,以该盆地北缘东胜气田致密高含水气藏为研究对象,分析了储集层地质条件、储集层改造对合采井产层段贡献的影响,指出了该类合采气井层间干扰的主控因素。研究结果表明:(1)合采井各产层段贡献率主要受各产层段的孔隙度、渗透率及含气饱和度控制,其产层段孔隙度占主导地位;(2)储层压裂改造对于提高气井产量具有较大的作用,但对合采井各产层段的贡献率却很小;(3)对于致密高含水气藏而言,含气饱和度是合采井产层段贡献率及层间干扰的一个重要影响因子;(4)合采井各产层段之间的孔隙度级差、渗透率级差及含气饱和度级差直接影响着合采井层间干扰程度。结论认为:(1)合采井产层段的孔隙度越大、渗透性越好、含气饱和度越高,则产层段的产量贡献率越大;(2)合采井孔隙度、渗透率及含气饱和度3个参数的级差越大,层间干扰程度越大,当孔隙度级差大于1.248或渗透率级差大于2.69或含气饱和度级差大于1.22时,合采井层间干扰已经非常严重,亟需开展治理。 展开更多
关键词 鄂尔多斯盆地北缘 东胜气田 致密高含水气藏 合采气井 层间干扰 影响因素
下载PDF
富水超大断面隧道开挖方法比选研究
19
作者 汪成竹 寇学超 +2 位作者 冯冀蒙 甘海峰 张俊儒 《建筑技术开发》 2024年第3期54-56,共3页
韶新高速公路的松山隧道穿越富水区域,开挖过程中出现了明显的涌水现象。基于该隧道地质的资料,利用有限元软件FLAC 3D分别模拟全断面法和上下台阶法2种开挖方法。研究结果表明:当水压较小时,宜采用全断面开挖法;当水压力较大时,宜采用... 韶新高速公路的松山隧道穿越富水区域,开挖过程中出现了明显的涌水现象。基于该隧道地质的资料,利用有限元软件FLAC 3D分别模拟全断面法和上下台阶法2种开挖方法。研究结果表明:当水压较小时,宜采用全断面开挖法;当水压力较大时,宜采用上下台阶法施工。研究结论对富水超大断面隧道开挖方法的选择具有一定的参考意义。 展开更多
关键词 富水 超大断面 开挖方法 数值模拟
下载PDF
富水环境下强–中风化硅质板岩吸水特性及微观演化规律
20
作者 杨志全 李飞洋 +6 位作者 甘进 赵鹏飞 付梦 闫煜 谭皓 张建 朱颖彦 《采矿与岩层控制工程学报》 EI 北大核心 2024年第1期137-148,共12页
为探讨富水环境下强–中风化硅质板岩的吸水特性及吸水过程微观演化规律,以玉溪至楚雄段国家高速公路旧寨隧道中的强–中风化硅质板岩为研究对象,开展浸水试验、电镜扫描试验和X射线衍射试验。试验结果表明:富水环境下强–中风化硅质板... 为探讨富水环境下强–中风化硅质板岩的吸水特性及吸水过程微观演化规律,以玉溪至楚雄段国家高速公路旧寨隧道中的强–中风化硅质板岩为研究对象,开展浸水试验、电镜扫描试验和X射线衍射试验。试验结果表明:富水环境下强–中风化硅质板岩吸水过程可分为急速吸水阶段(0~2 h)、缓速吸水阶段(2~24 h)和平衡吸水阶段(超过24 h)等3个阶段。急速吸水阶段,岩石结构变得较为松散、孔隙及微裂隙逐步延伸发展;缓速吸水阶段,胶结物溶解、脱落,岩石结构进一步松散、孔隙及裂隙进一步发育,逐渐形成显著的贯穿性裂隙;动态平衡吸水阶段,岩石结构松散程度、孔隙及裂隙发育程度基本达到稳定状态。强–中风化硅质板岩主要矿物组成为石英和黏土矿物,随着浸水试验的进行,石英相对含量增加,黏土矿物含量不断减小;伊利石、伊蒙混层等黏土矿物遇水极不稳定,既能与水发生化学反应,转化成石英和其他黏土矿物,又能与水发生物理反应,表现出膨胀、破碎和分解等特性。研究成果可为开展强–中风化硅质板岩吸水软化特性的理论研究提供参考。 展开更多
关键词 富水环境 强–中风化硅质板岩 吸水特性 微观演化规律
下载PDF
上一页 1 2 125 下一页 到第
使用帮助 返回顶部