An iterative method was developed for incorporating the well bore boundary into the finite difference model of water flow in variably saturated porous media. Six cases were presented involving groundwater pumping or i...An iterative method was developed for incorporating the well bore boundary into the finite difference model of water flow in variably saturated porous media. Six cases were presented involving groundwater pumping or injection to demonstrate the advantages of the iterative method over the traditional method. For the iterative method, the total flux gradually approached the well discharge and the flux profile was non-uniform. And the iterative method took into account the variation of well bore water table. Compared to the traditional method, the iterative method can simulate the variably saturated flow caused by pumping or injection more realistically.展开更多
At present,the optimization of the plunger mechanism is shale gas wells is mostly based on empirical methods,which lack a relevant rationale and often are not able to deal with the quick variations experienced by the ...At present,the optimization of the plunger mechanism is shale gas wells is mostly based on empirical methods,which lack a relevant rationale and often are not able to deal with the quick variations experienced by the production parameters of shale gas wells in comparison to conventional gas wells.In order to mitigate this issue,in the present work,a model is proposed to loosely couple the dynamics of gas inflow into shale gas wells with the dynamics of the liquid inflow.Starting from the flow law that accounts for the four stages of movement of the plunger,a dynamic model of the plunger lift based on the real wellbore trajectory is introduced.The model is then tested against 5 example wells,and it is shown that the accuracy level is higher than 90%.The well‘switch’,optimized on the basis of simulations based on such a model,is tested through on-site experiments.It is shown that,compared with the original switch configuration,the average production of the sample well can be increased by about 15%.展开更多
基金Supported by National Natural Science Foundation of China (No. 51079068)
文摘An iterative method was developed for incorporating the well bore boundary into the finite difference model of water flow in variably saturated porous media. Six cases were presented involving groundwater pumping or injection to demonstrate the advantages of the iterative method over the traditional method. For the iterative method, the total flux gradually approached the well discharge and the flux profile was non-uniform. And the iterative method took into account the variation of well bore water table. Compared to the traditional method, the iterative method can simulate the variably saturated flow caused by pumping or injection more realistically.
基金The authors would like to acknowledge the National Natural Science Fund Project(62173049)for Key Projectthe Open Fund Project“Study on Transient Flow Mechanism of Fluid Accumulation in Shale Gas Wells”of the Sinopec Key Laboratory of Shale Oil/Gas Exploration and Production Technology.
文摘At present,the optimization of the plunger mechanism is shale gas wells is mostly based on empirical methods,which lack a relevant rationale and often are not able to deal with the quick variations experienced by the production parameters of shale gas wells in comparison to conventional gas wells.In order to mitigate this issue,in the present work,a model is proposed to loosely couple the dynamics of gas inflow into shale gas wells with the dynamics of the liquid inflow.Starting from the flow law that accounts for the four stages of movement of the plunger,a dynamic model of the plunger lift based on the real wellbore trajectory is introduced.The model is then tested against 5 example wells,and it is shown that the accuracy level is higher than 90%.The well‘switch’,optimized on the basis of simulations based on such a model,is tested through on-site experiments.It is shown that,compared with the original switch configuration,the average production of the sample well can be increased by about 15%.