期刊文献+
共找到2,163篇文章
< 1 2 109 >
每页显示 20 50 100
Wet-Dry Runoff Correlation in Western Route of South-to-North Water Diversion Project,China 被引量:2
1
作者 HUANG Xiao-rong ZHAO Jing-wei YANG Peng-peng 《Journal of Mountain Science》 SCIE CSCD 2015年第3期592-603,共12页
The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries(water-exporting area), to the upstrea... The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries(water-exporting area), to the upstream of the Yellow River(waterimporting area). The long-term hydrological data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow characteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, waterimporting area, and the stretch downstream of the water-exporting have synchronization in high–low flow relationship, whereas they display nonsynchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological compensation probability for rivers where water is diverted is about 25% to 10%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the waterexporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the waterexporting area. 展开更多
关键词 南水北调工程 径流相关 西线区域 跨流域引水工程 出口区域 干湿 中国 径流时间序列
下载PDF
LONG AND DEEP DIVERSION TUNNELS OF 1^(ST) STAGE PROJECT IN WEST ROUTE OF SOUTH-NORTH WATER TRANSFER PROJECT
2
作者 Shen Fengsheng,Liu Xin (Reconnaissance,Planning,Design and Research Institute,Yellow River Construction Commission, Ministry of Water Resources, Zhengzhou 450003 China) 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第9期1527-1532,共6页
West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze... West Route of South-North Water Transfer Project,situated in southeastern Qinghai-Tibet Plateau,is a giant project,which will deliver 17 billion m3 of water from the main stream and tributaries upstream of the Yangtze River to the upper reaches of the Yellow River. It is to be constructed in 3 stages, of which the 1st stage project includes delivering 4 billion m3 of water by gravity from two tributaries of Yalong River and three tributaries of Dadu River. The project consists of 5 dams,7 tunnels and a channel in series,with the dam height of 63~123 m and water transfer length of 260.3 km,of which the tunnels measure 244.1 km. The special climatic,environmental and geologic conditions make the project much more complicated in construction,especially 3 tunnels with the length longer than 50 km each create challenges to the technical requirements of engineering survey,design and construction. 展开更多
关键词 南水北调工程 西线工程 引水隧洞 TBM
下载PDF
Spatio-temporal distribution of phytoplankton in the Danjiangkou Reservoir, a water source area for the South-to-North Water Diversion Project (Middle Route), China 被引量:12
3
作者 殷大聪 郑凌凌 宋立荣 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2011年第3期531-540,共10页
One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR ar... One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR area before water diversion, as well as to estimate potential risks of water quality after water diversion, we conducted an investigation on phytoplankton in the DJKR from August 2008 to May 2009. The investigation included 10 sampling sites, each with four depths of 0.5, 5, 10, and 20 m. In this study, 117 taxa belonging to 76 genera were identified, consisting of diatoms (39 taxa), green algae (47 taxa), blue-green algae (19 taxa), and others (12 taxa). Annual average phytoplankton abundance was 2.01×106 ind./L, and the highest value was 14.72 × 106 ind/L (at site 3 in August 2008). Phytoplankton abundance in front of the Danjiangkou Dam (DJKD) was higher than that of the Danjiang Reservoir Basin. Phytoplankton distribution showed a vertical declining trend from 0.5 m to 20 m at most sites in August 2008 (especially at sites of 1, 2, 4 and 10), but no distinct pattern in other sampling months. In December 2008 and March 2009, Stephanodiscus sp. was the most abundant species, amounting to 55.23% and 72.34%, respectively. We propose that high abundance of Stephanodiscus sp. may have contributed greatly to the frequent occurrence of Stephanodiscus sp. blooms in middle-low reaches of the Hanjiang River during the early spring of 2009. In comparison with previous studies conducted from 1992 to 2006, annual average phytoplankton density, green algae and blue-green algae species, as well as major nutrient concentrations increased, while phytoplankton diversity indices declined. This indicates a gradual decline in water quality. More research should be conducted and countermeasures taken to prevent further deterioration of water quality in the DJKR. 展开更多
关键词 浮游植物密度 丹江口水库 南水北调工程 时空分布 水源区 南水北调西线工程 中线 中国
下载PDF
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:2
4
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification Middle route of the south-to-north water diversion project(MR-SNWDP) China
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
5
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably. 展开更多
关键词 南水北调东线工程 延迟模型 施工期 标段 罚款 南水北调工程 关键路径法 管理理论
下载PDF
IMPACTS OF THE SOUTH-TO-NORTH WATER DIVERSION PROJECTS (MIDDLE ROUTE)ON THE WATER ENVIRONMENT OF THE MIDDLE AND LOWER REACHES OF THE HANJIANG RIVER
6
作者 FAN Bei-Lin, WAN Jian-Rong, ZHANG Jie and LIN Qiu-Sheng (Yangtze River Scientific Research Institute,River Research Deparment, Wuhan 430010,China) 《水生生物学报》 CAS CSCD 北大核心 2006年第6期643-646,共4页
In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well... In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well as their impacts on the environment of the middle and lower reaches of the Hanjiang River. The results showed that the 95×10 8m 3 water diversion scheme will cause less erosion and water level decrease than the 15×10 8m 3 water diversion scheme. Using a water diversion scheme of 95×10 8m 3, the decrease of water quantity can impact the river hydrodynamic regime substantially and the environments of the middle and lower reaches of the Hanjiang River will be greatly affected. It is therefore necessary to develop new water resources or build projects to meet the need of the environment and the needs for navigation. 展开更多
关键词 south-to-north water diversion project River regime water environment Mathematical model
下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
7
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project,the classification method for surrounding rocks is discussed by combining with the construction method of tunnel ... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project,the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine(TBM).The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices.Damage,deformation and evolution of surrounding rocks induced by TBM excavation are discussed.Meanwhile,the long-term deformation mechanisms and stability of surrounding rocks are also studied.On this basis,a three-dimensional constitutive model for interbedded sandstone slate and a flat shell-joint element-foundation system for calculating internal forces of segment lining are established.The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented.Finally,the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 南水北调工程 特殊地质条件 力学问题 西线 隧道掘进机 岩石 变形机制 衬砌内力
下载PDF
Estimating minimum ecological water required of the western route first stage project of China's south-to-north water transfer scheme for water exporting rivers
8
作者 MEN Bao-hui 《Journal of Environmental Science and Engineering》 2007年第1期19-24,共6页
下载PDF
Impact of the eastern water diversion from the south to the north project on the saltwater intrusion in the Changjiang Estuary in China 被引量:10
9
作者 XU Kun ZHU Jianrong GU Yuliang 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2012年第3期47-58,共12页
The south to the north project(WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensional(3D) numerical model.The net unit width flux in the Changjiang Estuary as well as th... The south to the north project(WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensional(3D) numerical model.The net unit width flux in the Changjiang Estuary as well as the sectional salt flux is calculated in the North Branch(NB),the South Branch(SB),the North Channel(NC),the South Channel(SC),the North Passage(NP) and the South Passage(SP),respectively.The net seaward water flux in the SB is reduced,and the net water flux spilling over from the NB to the SB is enhanced after the eastern WDP.Under the mean river discharge condition in the dry season,the net salt flux spilling over from the NB to the SB is increased by 2.09 t/s and 0.52 t/s during the spring and neap tides,respectively,due to the eastern WDP.The saltwater intrusion in the Changjiang Estuary is enhanced by the eastern WDP.Compared with that during the spring tide,the net water diversion ratio during the neap tide in the NC is smaller,and thus the enhancement of the saltwater intrusion by the eastern WDP is smaller in the NC,and larger in the NP and the SP.The tidally averaged surface salinity at the water intakes of the Dongfengxisha Reservoir,the Chenhang Reservoir and the Qingcaosha Reservoir rises both during the spring and neap tides. 展开更多
关键词 eastern water diversion from the south to the north project saltwater intrusion Changjiang Estuary numerical calculation the water resource
下载PDF
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period 被引量:3
10
作者 Feng Jingchun Zhou Yang +2 位作者 Hong Yuzhen Zhao Shixin Ren Xiaoqiang 《Water Science and Engineering》 EI CAS 2008年第4期107-113,共7页
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection a... In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up. 展开更多
关键词 可靠性模型 引水工程 管理链 组织 施工期 连接状态 可靠性分析 南水北调
下载PDF
Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project 被引量:2
11
作者 Jing-chun FENG Lei LI +4 位作者 Nan YANG Yu-zhen HONG Min PANG Xiong YAO Li-cheng WANG 《Water Science and Engineering》 EI CAS 2011年第2期225-236,共12页
Recently,the critical chain study has become a hot issue in the project management research field.The construction of the critical chain with multi-resource constraints is a new research subject.According to the syste... Recently,the critical chain study has become a hot issue in the project management research field.The construction of the critical chain with multi-resource constraints is a new research subject.According to the system analysis theory and project portfolio theory,this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis.A model with multi-resource constraints,which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project,was proposed.Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out.This paper also makes suggestions for further research directions and subjects,which will be useful in improving the theories in relevant research fields. 展开更多
关键词 多资源约束 关键链 组合技术 引水工程 基础 投资组合理论 南水北调工程 相似性原理
下载PDF
Eco-environmental benefit assessment of China's South-North Water Transfer Scheme——the middle route project
12
作者 DUANGuang-ming ZHAOJing-zhu LIUGuo-hua KEBing XIAOHan WUGang DENGHong-bing 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2004年第2期308-315,共8页
This paper assess the eco-environmental benefits that may come from the middle route project of China’s South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNW... This paper assess the eco-environmental benefits that may come from the middle route project of China’s South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT’s middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors. 展开更多
关键词 中国 南水北调工程 生态系统 货币指标 环境评价 经济评价 水循环
下载PDF
Coupling interaction between biodiversity and aquatic habitat area in Western Route Project vicinity
13
作者 Shi-min TIAN Zhao-yin WANG +1 位作者 Xiang-jun LIU Shi-kui LIANG 《Water Science and Engineering》 EI CAS 2010年第3期354-360,共7页
The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries,the Dadu River and Yalong River,to the upper Yellow River.The project may ease the wate... The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries,the Dadu River and Yalong River,to the upper Yellow River.The project may ease the water shortage in the Yellow River Basin.However,it may also have some effects on the ecosystem in the upper Yangtze River Basin.Benthic invertebrates play an important role in the river ecosystem,particularly in the circulation of materials and nutrition.Benthic invertebrates are widely used to quickly assess river ecosystems because of their rapid response to changes in the water environment.The diversity of benthic invertebrates is closely associated with the aquatic habitat area.This study examined this interaction by sampling the benthic invertebrates in an expanding area.The conclusions are that the diversity of benthic invertebrates begins to decrease when the aquatic habitat area is reduced to 45% of the original area,and decreases dramatically when the aquatic habitat area is reduced to 10% of the original area.The aquatic habitat area should be kept at more than 45% of the original area in order to maintain the significant diversity of benthic invertebrates. 展开更多
关键词 南水北调西线工程 生物多样性 相互作用 栖息地 水生 底栖无脊椎动物 河流生态系统 耦合
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
14
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 南水北调工程 临界流量 枯水期 大同 大型调水工程 盐水入侵 运作 控制
下载PDF
Price Analysis of Water Supply for South-to-North Water Transfer Project
15
作者 QIU Zhong enProfessor, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China Tan Chang liSenior Engineer, Design Institute, Changjiang Water Resources Commission, Wuhan 430010, China ZHU Qin Engineer, Design Institute, Chan 《人民长江》 北大核心 2001年第S1期29-32,共4页
The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from ... The factors influencing the water supply price of a hydraulic project include natural conditions and economic policies. This paper thoroughly demonstrates the water price of South-to-North Water Transfer Project from the viewpoint of economic policies. It is considered that if the project is assigned as a profitable one and built depending on commercial loan from bank completely or mostly, the water price will be too high to be undertaken by users,and if the project places the public good at first while considering the economic benefit, its investment mainly relies on the state (national or local governments) appropriation and self-raised funds and a little from the bank loan on favorable terms, the price determined according to the principle of satisfying the cost and reasonable profit will be relatively lower and can be undertaken by the users in the North China where water shortage is serious. The problem of higher water price of agricultural irrigation to the north of the Yellow River can be tackled by taking measures such as "compensating agriculture by industry" according to foreign practical experiences and relevant suggestions. 展开更多
关键词 PRICE of water supply water PRICE estimation FUND RAISING schemes water TRANSFER cost Middle-route project of south-to-north water TRANSFER
下载PDF
Computing payment for ecosystem services in watersheds: An analysis of the Middle Route Project of South-to-North Water Diversion in China 被引量:12
16
作者 Zhengju Dong Yan Yan +5 位作者 Jing Duan Xiao Fu Qingrong Zhou Xiang Huang Xiangen Zhu Jingzhu Zhao 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2011年第12期2005-2012,共8页
Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechanism... Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechanism by the central government, rapid progress on PES research and practice has been achieved. However PES still faces many difficulties. A key issue is the lack of a fully-fledged theory and method to clearly define the design scope, accounting and feasibility of PES criteria. An improved watershed criteria model was developed in light of research on PES practices in China, investigations on the water source area for the Middle Route Project of South-to-North Water Diversion and ecosystem services outflows theory. The basic principle of assessment is the direct and opportunity cost for ecological conservation and environmental protection in the water source area deduct nationally-financed PES and internal effect. Then the scope and the criteria methods were determined, and internal effect was put forward to define benefits brought from water source area. Finally, Shiyan City, which is the main water source area for the Project of Water Diversion, was analyzed by this model and its payment was calculated. The results showed that: (1) during 2003-2050, the total direct cost and opportunity cost would reach up to 262.70 billion and 256.33 billion Chinese Yuan (CNY, 2000 constant prices), i.e., 50.61% and 49.38% of total cost, respectively; (2) Shiyan City would gain 0.23, 0.06 and 0.03 CNY/m3 in 2014-2020, 2021-2030, and 2031-2050, respectively. 展开更多
关键词 南水北调中线工程 生态系统服务 引水工程 价格计算 中国 流域 自然资源管理 标准模型
原文传递
Potential Ecological Benefits of the Middle Route for the South-North Water Diversion Project 被引量:2
17
作者 杜鹏飞 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第5期715-719,共5页
This paper presents a study of the middle route of the South-North Water Diversion Project. The middle route runs through the Northern China plain, where the water shortages are the most severe. There is not only a sh... This paper presents a study of the middle route of the South-North Water Diversion Project. The middle route runs through the Northern China plain, where the water shortages are the most severe. There is not only a shortage of water for human usage, but also a shortage of ecological water. Although the cur-rent plan for the middle route is strictly focused on supplying water for residential and industrial use, the water can also potentially be used for ecological purposes. This paper evaluates the potential ecological benefits that can be brought to the fragile ecology in northern China by the middle route, in addition to the water supplied to residences and industry. The study describes ecological benefits of the middle route pro-ject, such as mitigation of groundwater extraction in the region and positive influences on the climate, the ecological uses of the middle route project itself, such as creating artificial niches along the channel and di-rectly using the channel for ecological purposes, and the ecological uses of the water along the middle route, such as diversion of the water into river channels that have suffered from drought conditions for decades. 展开更多
关键词 南水北调工程 经济效益 中国 中部沿线地区
原文传递
On conservation and development of architecture and environment in the construction of large-scale national infrastructure——Exemplified by the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project 被引量:1
18
作者 DUAN Jin ,LUO JianLi,WANG XingPing,TANG Jun&YU Gang School of Architecture,Southeast University,Nanjing 210096,China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第12期3613-3625,共13页
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ... The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined. 展开更多
关键词 Jiangsu Section of Eastern route south-to-north water diversion project CANAL culture routes water resources heritage CORRIDORS landscape and RECREATION CORRIDORS town economic CORRIDORS synthetical ZONING and grading
原文传递
Simulation of Transport Channel in China's Middle Route South-to-North Water Transfer Project 被引量:3
19
作者 方神光 魏加华 +1 位作者 吴保生 尚毅梓 《Tsinghua Science and Technology》 SCIE EI CAS 2009年第3期367-377,共11页
The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate t... The unsteady flow in the Middle Route South-to-North Water Transfer Channel was simulated numerically using an implicit solution procedure for the Saint Venant equations. An equivalent roughness was used to simulate the effect of many transfer structures on the water levels in the main channel. Various gate operating and control methods were analyzed to study the response to disturbances produced by varying the flow rates through the Tianjin outlet. The results show that when the inflow at the head changes in the same way as the sum of the flow rates through all the outlets, the transition time and the fluctuation of the water levels using the timed gate operation method are less than when using the simultaneous gate operation method, but the variations of the gate openings and flow rates through each control gate are much larger. The flow disturbances produced by the Tianjin outlet can be rectified within several channel sections and the transition time can be greatly shortened by allowing the water levels immediately upstream of the control gates to vary within proscribed ranges, rather than being held constant. 展开更多
关键词 南水北调 数值模拟 调水工程 传输通道 中线 中国 操作方法 过渡时间
原文传递
南水北调西线工程水源区可调水量“十问”
20
作者 胡鹏 王浩 +13 位作者 赵勇 宁远 蒋云钟 刘欢 曾庆慧 杨泽凡 周毓彦 董宁澎 闫龙 阿膺兰 张丰博 唐家璇 王玉莲 王建华 《中国工程科学》 CSCD 北大核心 2024年第2期210-223,共14页
南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区... 南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区及其下游水资源开发利用、水生态环境、水力发电、航运等方面影响的角度,提出了与水源区可调水量相关的10个问题;以长江上游分布式水文模型为基础,建立了南水北调西线工程水源区可调水量模拟分析模型,力图系统、定量地回答所提问题。本文的主要研究结论有:在仅考虑满足水源区河道内外生态环境和经济社会需水的前提下,“上线+下线”组合方案多年平均可调水量为1.59×10^(10)m^(3),“完全下线”方案在建设岗托水库进行联调时,多年平均可调水量将达到1.74×10^(10)m^(3);在综合考虑调水对水源区水平衡、水力发电和航运影响及其可接受程度后,南水北调西线水源区可调水量为1.22×10^(10)~1.26×10^(10)m^(3)。长远来看,应谋划西南片区水网与国家水网主骨架、“大动脉”的连接与融合,在减小南水北调西线工程调水影响的同时,提高南水北调西线工程的整体供水能力以及对气候变化等外部条件的适应性。 展开更多
关键词 南水北调西线工程 水源区 可调水量 生态需水 跨流域调水
下载PDF
上一页 1 2 109 下一页 到第
使用帮助 返回顶部