Due to pollution in second water supply system (SWSS),nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this...Due to pollution in second water supply system (SWSS),nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this paper. Comparisons of advantages and disadvantages among the plans of SWSS renovations provided solid foundation for selecting the most appro-priate plan for engineering projects. In addition,a mathematical model of the optimal combination of renovation plans has been set up and software Lingo was used to solve the model. As a case study,the paper analyzed 15 buildings in Tianjin City. After simulation of the SWSS renovation system,an optimal scheme was obtained,the result of which indicates that 10 out of those 15 buildings need be renovated in priority. The renovation plans selected for each building are the ones ranked higher in the com-prehensive analysis. The analysis revealed that the optimal scheme,compared with two other randomly calculated ones,increased the percentage of service population by 19.6% and 13.6% respectively,which significantly improved social and economical benefits.展开更多
This study developed a systematic decision-making process for water supply capacity expansion using the analytic hierarchy process. The decision-making criteria were categorized into environmental, economic, technical...This study developed a systematic decision-making process for water supply capacity expansion using the analytic hierarchy process. The decision-making criteria were categorized into environmental, economic, technical and socio-cultural aspects. Capacity expansion of three water resources (Kpong, Weija and Teshie plants) of Accra-Tema Metropolitan Area (Ghana) was studied as a test case. The research resulted in the environmental criterion with the highest priority weight (52.4%), followed by the economic (30.6%), technical (11.3%) and socio-cultural criteria (5.8%). The overall analysis ranked the Kpong plant with a score of 36.1% followed by the Weija and Teshie plants with scores 33.8% and 30.2%, respectively.展开更多
Pipeline network of oil fi eld water is established on the basis of GIS geographic information and SCADA platform, and monitorthe running state of water supply system in oil fi eld mining area in real time through dat...Pipeline network of oil fi eld water is established on the basis of GIS geographic information and SCADA platform, and monitorthe running state of water supply system in oil fi eld mining area in real time through data acquisition, instrument measurement and control,wireless network, water quantity, water pressure and other on-line monitoring equipment. The water supply system is formed, and the informationof mass water supply system is analyzed and processed in a timely manner. The system manages the entire production, management and serviceprocesses of the water supply system in a dynamic manner in order to ensure water supply safety management, and realize the modernization,intelligence and information mode operation of the water supply system in the mining area.展开更多
基金Project (No.033113111) supported by Tianjin Science Association Key Project,China
文摘Due to pollution in second water supply system (SWSS),nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this paper. Comparisons of advantages and disadvantages among the plans of SWSS renovations provided solid foundation for selecting the most appro-priate plan for engineering projects. In addition,a mathematical model of the optimal combination of renovation plans has been set up and software Lingo was used to solve the model. As a case study,the paper analyzed 15 buildings in Tianjin City. After simulation of the SWSS renovation system,an optimal scheme was obtained,the result of which indicates that 10 out of those 15 buildings need be renovated in priority. The renovation plans selected for each building are the ones ranked higher in the com-prehensive analysis. The analysis revealed that the optimal scheme,compared with two other randomly calculated ones,increased the percentage of service population by 19.6% and 13.6% respectively,which significantly improved social and economical benefits.
文摘This study developed a systematic decision-making process for water supply capacity expansion using the analytic hierarchy process. The decision-making criteria were categorized into environmental, economic, technical and socio-cultural aspects. Capacity expansion of three water resources (Kpong, Weija and Teshie plants) of Accra-Tema Metropolitan Area (Ghana) was studied as a test case. The research resulted in the environmental criterion with the highest priority weight (52.4%), followed by the economic (30.6%), technical (11.3%) and socio-cultural criteria (5.8%). The overall analysis ranked the Kpong plant with a score of 36.1% followed by the Weija and Teshie plants with scores 33.8% and 30.2%, respectively.
文摘Pipeline network of oil fi eld water is established on the basis of GIS geographic information and SCADA platform, and monitorthe running state of water supply system in oil fi eld mining area in real time through data acquisition, instrument measurement and control,wireless network, water quantity, water pressure and other on-line monitoring equipment. The water supply system is formed, and the informationof mass water supply system is analyzed and processed in a timely manner. The system manages the entire production, management and serviceprocesses of the water supply system in a dynamic manner in order to ensure water supply safety management, and realize the modernization,intelligence and information mode operation of the water supply system in the mining area.