Based on a simulation model of a semiconductor manufacturer, operator-machine ratio (OMR) analysis is made using work study and time study. Through sensitivity analysis, it is found that labor utilization decreases ...Based on a simulation model of a semiconductor manufacturer, operator-machine ratio (OMR) analysis is made using work study and time study. Through sensitivity analysis, it is found that labor utilization decreases with the increase of lot size. Meanwhile, it is able to identify that the OMR for this company should be improved from 1 : 3 to 1 : 5. An application result shows that the proposed model can effectively improve the OMR by 33%.展开更多
Work study is an area of construction production rationalization in which with scientific, logical, holistic and system analysis methods of the process we gain optimum in way of work and time of work. Chronometry meth...Work study is an area of construction production rationalization in which with scientific, logical, holistic and system analysis methods of the process we gain optimum in way of work and time of work. Chronometry method is one of the work study methods which is appropriate for recording shorter cyclic processes and is based on statistical sampling theory. Determination of cyclic times and work performances of standard cyclic construction machines (SCCM) is one of key assumptions of dynamic planning of machine work on every construction site. Calculation methods of SCCM work performances arc one of basic research objects in the field of construction organization and technology. Study shows applied chronometry method in work of standard cyclic construction machine. Goal of this study is to accomplish regulation through measured time cycle and compare measured effects with effects obtained with standard methodology of calculating hydraulic excavator practical achievement for gaining regulation in order to determine main reasons which effect work performance on site.展开更多
文摘Based on a simulation model of a semiconductor manufacturer, operator-machine ratio (OMR) analysis is made using work study and time study. Through sensitivity analysis, it is found that labor utilization decreases with the increase of lot size. Meanwhile, it is able to identify that the OMR for this company should be improved from 1 : 3 to 1 : 5. An application result shows that the proposed model can effectively improve the OMR by 33%.
文摘Work study is an area of construction production rationalization in which with scientific, logical, holistic and system analysis methods of the process we gain optimum in way of work and time of work. Chronometry method is one of the work study methods which is appropriate for recording shorter cyclic processes and is based on statistical sampling theory. Determination of cyclic times and work performances of standard cyclic construction machines (SCCM) is one of key assumptions of dynamic planning of machine work on every construction site. Calculation methods of SCCM work performances arc one of basic research objects in the field of construction organization and technology. Study shows applied chronometry method in work of standard cyclic construction machine. Goal of this study is to accomplish regulation through measured time cycle and compare measured effects with effects obtained with standard methodology of calculating hydraulic excavator practical achievement for gaining regulation in order to determine main reasons which effect work performance on site.