In this work,the Slacks-Based Measure(SBM)model within Data Envelopment Analysis was employed to establish a set of indicators for evaluating the energy efficiency of manufacturing workshops.The energy efficiency of 1...In this work,the Slacks-Based Measure(SBM)model within Data Envelopment Analysis was employed to establish a set of indicators for evaluating the energy efficiency of manufacturing workshops.The energy efficiency of 12 Company CW’s manufacturing workshops from 2016 to 2022 was assessed.The findings indicated that aside from a few workshops operating at the production frontier,the rest exhibit significant fluctuations in energy efficiency and generally low energy efficiency.Subsequently,a combined GRA-Tobit analysis model was introduced to identify factors influencing the energy efficiency of Company CW’s manufacturing workshops.Regression analysis revealed that technological investments,employee quality,workshop production scale,investment in clean energy,and the level of pollution control all significantly impact the energy efficiency of Company CW’s manufacturing workshops.By evaluating the energy efficiency of Company CW’s manufacturing workshops and studying their influencing factors,this research aids company managers in understanding the energy efficiency of the manufacturing process.It optimizes the combination of various production elements,thereby offering effective guidance for improving the energy efficiency issues of the company’s manufacturing workshops,which can contribute to enhancing the corporation’s overall energy efficiency.展开更多
为解决建筑设计课程中存在学生团队训练不足、设计课题内容滞后以及考核方式单一等现状问题,以“高层建筑设计”课程为例,探索基于成果导向教育(outcome based education,OBE)教学理念、以Workshop教学模式为核心的教学方式。通过学生...为解决建筑设计课程中存在学生团队训练不足、设计课题内容滞后以及考核方式单一等现状问题,以“高层建筑设计”课程为例,探索基于成果导向教育(outcome based education,OBE)教学理念、以Workshop教学模式为核心的教学方式。通过学生团队作业、行业专家带课题进课堂和校内校外联动评价等手段构建“设计项目导入—学生团队协作设计—多元评价”三步式教学设计。研究表明,采用三步式教学设计有利于提高学生的设计水平、实践能力以及团队协作等综合素质,实现应用型本科建筑学专业理论结合实践、紧密联系社会的教学目标。展开更多
Objective: This paper takes the example of a Panax notoginseng extraction workshop and designs an automated production workshop with advanced domestic capabilities. Methods: 1) Based on the small-scale Panax notoginse...Objective: This paper takes the example of a Panax notoginseng extraction workshop and designs an automated production workshop with advanced domestic capabilities. Methods: 1) Based on the small-scale Panax notoginseng extraction process, the feasibility of the workshop production process is demonstrated. 2) The workshop process design for Panax Notoginseng saponin extraction is completed, including production organization plans and the selection of key equipment. 3) For the Panax notoginseng extraction workshop process, an automated production control system is designed. Conclusion: Through optimized design of the production process and automation system, continuous and automated production of traditional Chinese medicine extraction is achieved, leading to improvements in drug quality and production efficiency.展开更多
On account of uneven distribution of water resources,population growth,climate change,etc.,the Asia-Pacific Economic Cooperation(APEC)economies generally face the challenge of water shortage and related problems.To en...On account of uneven distribution of water resources,population growth,climate change,etc.,the Asia-Pacific Economic Cooperation(APEC)economies generally face the challenge of water shortage and related problems.To enhance cooperation and exchanges in water-conservation standardization,the APEC Workshop on Best Practices Sharing of Water-Conservation Standards and Evaluation on Their Benefits was held virtually on February 2-3.展开更多
Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to...Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to the country.The role of workshop management is one of the most important factors in increasing the cost of these types of projects.Generally,workshop management plays a very important role in improving the quality and quantity of projects and has an important place in the project implementation process.Therefore,this study evaluated the impact of workshop management on the progress of road construction projects on a case-by-case basis in road construction projects in Tehran province.According to the purpose of the research,this study was a descriptive-survey type.In addition,the tool used in this research was a questionnaire.The statistical population of this research included all experts and specialists in road construction projects,among whom 65 people were selected by snowball method.Then the collected data were analyzed using SPSS software.The results of this study showed that the management of the workshop and its role in the control and implementation of projects is a complex process,which can be implemented at high levels and effectively by combining scientific and experimental training.And a very important point in the discussion of workshop management is applying scientific management to the use of valuable experiences from others.Because management knowledge not only does not negate the use of these experiences,but also emphasizes the necessity of using them.In other words,improving the knowledge of workshop management is one of the requirements for the implementation of value engineering in construction projects,especially road construction,and it is very important.展开更多
文摘In this work,the Slacks-Based Measure(SBM)model within Data Envelopment Analysis was employed to establish a set of indicators for evaluating the energy efficiency of manufacturing workshops.The energy efficiency of 12 Company CW’s manufacturing workshops from 2016 to 2022 was assessed.The findings indicated that aside from a few workshops operating at the production frontier,the rest exhibit significant fluctuations in energy efficiency and generally low energy efficiency.Subsequently,a combined GRA-Tobit analysis model was introduced to identify factors influencing the energy efficiency of Company CW’s manufacturing workshops.Regression analysis revealed that technological investments,employee quality,workshop production scale,investment in clean energy,and the level of pollution control all significantly impact the energy efficiency of Company CW’s manufacturing workshops.By evaluating the energy efficiency of Company CW’s manufacturing workshops and studying their influencing factors,this research aids company managers in understanding the energy efficiency of the manufacturing process.It optimizes the combination of various production elements,thereby offering effective guidance for improving the energy efficiency issues of the company’s manufacturing workshops,which can contribute to enhancing the corporation’s overall energy efficiency.
文摘为解决建筑设计课程中存在学生团队训练不足、设计课题内容滞后以及考核方式单一等现状问题,以“高层建筑设计”课程为例,探索基于成果导向教育(outcome based education,OBE)教学理念、以Workshop教学模式为核心的教学方式。通过学生团队作业、行业专家带课题进课堂和校内校外联动评价等手段构建“设计项目导入—学生团队协作设计—多元评价”三步式教学设计。研究表明,采用三步式教学设计有利于提高学生的设计水平、实践能力以及团队协作等综合素质,实现应用型本科建筑学专业理论结合实践、紧密联系社会的教学目标。
文摘Objective: This paper takes the example of a Panax notoginseng extraction workshop and designs an automated production workshop with advanced domestic capabilities. Methods: 1) Based on the small-scale Panax notoginseng extraction process, the feasibility of the workshop production process is demonstrated. 2) The workshop process design for Panax Notoginseng saponin extraction is completed, including production organization plans and the selection of key equipment. 3) For the Panax notoginseng extraction workshop process, an automated production control system is designed. Conclusion: Through optimized design of the production process and automation system, continuous and automated production of traditional Chinese medicine extraction is achieved, leading to improvements in drug quality and production efficiency.
文摘On account of uneven distribution of water resources,population growth,climate change,etc.,the Asia-Pacific Economic Cooperation(APEC)economies generally face the challenge of water shortage and related problems.To enhance cooperation and exchanges in water-conservation standardization,the APEC Workshop on Best Practices Sharing of Water-Conservation Standards and Evaluation on Their Benefits was held virtually on February 2-3.
文摘Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to the country.The role of workshop management is one of the most important factors in increasing the cost of these types of projects.Generally,workshop management plays a very important role in improving the quality and quantity of projects and has an important place in the project implementation process.Therefore,this study evaluated the impact of workshop management on the progress of road construction projects on a case-by-case basis in road construction projects in Tehran province.According to the purpose of the research,this study was a descriptive-survey type.In addition,the tool used in this research was a questionnaire.The statistical population of this research included all experts and specialists in road construction projects,among whom 65 people were selected by snowball method.Then the collected data were analyzed using SPSS software.The results of this study showed that the management of the workshop and its role in the control and implementation of projects is a complex process,which can be implemented at high levels and effectively by combining scientific and experimental training.And a very important point in the discussion of workshop management is applying scientific management to the use of valuable experiences from others.Because management knowledge not only does not negate the use of these experiences,but also emphasizes the necessity of using them.In other words,improving the knowledge of workshop management is one of the requirements for the implementation of value engineering in construction projects,especially road construction,and it is very important.