TEQC is used to check the observations quality of 173 GPS campaign stations in the Northeast and North China. Each station was observed with an occupation of 4 days. The quality of the 692 data files is analyzed by th...TEQC is used to check the observations quality of 173 GPS campaign stations in the Northeast and North China. Each station was observed with an occupation of 4 days. The quality of the 692 data files is analyzed by the ratio of overall observations to possible observations, MP1, MP2 and the ratio of observations to slips. The reasons for multipath and cycle slips can be derived from the photos taken in the field. The results show that the coverage of trees and buildings/structures, and the interference of high-voltage power lines near the stations are the main reasons. In a small area, the horizontal velocity field in the period 2011-2013 is exemplified, where the magnitudes and directions of the 4 stations' rates are clearly different with that of other stations. It seems that the error caused by the worse environment cannot be mitigated through post processing. Therefore, these conclusions can help the establishment of GNSS stations, measurements, data processing and formulating standards in future.展开更多
Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjus...Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day. The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%-31.27%. Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%-5.79% by the schemes of adjusting blade angles when pumping certain discharge.展开更多
泵站机组运行受多种因素影响,导致泵站运行理论效率与实际效率误差较大。针对泵站机组运行效率精准模拟难题,运用基于高价多项式回归、回归树、多元线性回归、向量机回归、高斯过程回归、神经网络的10个回归算法,建立泵站机组效率模拟...泵站机组运行受多种因素影响,导致泵站运行理论效率与实际效率误差较大。针对泵站机组运行效率精准模拟难题,运用基于高价多项式回归、回归树、多元线性回归、向量机回归、高斯过程回归、神经网络的10个回归算法,建立泵站机组效率模拟模型并开展对比分析,优选出有效的泵站运行效率模拟建模方法。讨论分析采用“上下游水位+流量”代替传统“扬程+流量”开展泵站运行模拟的效果。以南水北调东线邳州站和遂宁二站共8台机组的历史数据开展实例分析,相关实验结果表明:在所有方法中,高斯过程回归(Gaussian process regression,GPR)模型在均方根误差(ERMS)、平均绝对误差(EMA)、均方误差(EMS)、决定系数(R2)和最大个体误差(EMI)指标上综合表现最佳,R2逼近0.95;使用站上、站下水位代替传统的扬程对模型进行训练,所有模型的综合评价指标整体有所改善。综合来看,使用GPR模型并使用上游、下游水位代替扬程进行模拟效率表现最好,以邳州站4号机为例,可将模拟效率的EMA和EMI分别从16.49%和20.40%减少至0.41%和2.30%,研究成果具有一定实际意义,可为我国调水工程泵站经济运行提供有力支撑。展开更多
基金supported by the China National Special Fund for Earthquake Scientific Research(201508003,201508009)
文摘TEQC is used to check the observations quality of 173 GPS campaign stations in the Northeast and North China. Each station was observed with an occupation of 4 days. The quality of the 692 data files is analyzed by the ratio of overall observations to possible observations, MP1, MP2 and the ratio of observations to slips. The reasons for multipath and cycle slips can be derived from the photos taken in the field. The results show that the coverage of trees and buildings/structures, and the interference of high-voltage power lines near the stations are the main reasons. In a small area, the horizontal velocity field in the period 2011-2013 is exemplified, where the magnitudes and directions of the 4 stations' rates are clearly different with that of other stations. It seems that the error caused by the worse environment cannot be mitigated through post processing. Therefore, these conclusions can help the establishment of GNSS stations, measurements, data processing and formulating standards in future.
基金supported by Author Special Foundation of National Excellent Doctoral Dissertation of China (Grant No. 2007B41)Jiangsu Provincial Foundation of "333 Talents Engineering" of ChinaJiangsu Provincial Academic Header Foundation of Qinglan Engineering of China
文摘Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day. The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%-31.27%. Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%-5.79% by the schemes of adjusting blade angles when pumping certain discharge.
文摘泵站机组运行受多种因素影响,导致泵站运行理论效率与实际效率误差较大。针对泵站机组运行效率精准模拟难题,运用基于高价多项式回归、回归树、多元线性回归、向量机回归、高斯过程回归、神经网络的10个回归算法,建立泵站机组效率模拟模型并开展对比分析,优选出有效的泵站运行效率模拟建模方法。讨论分析采用“上下游水位+流量”代替传统“扬程+流量”开展泵站运行模拟的效果。以南水北调东线邳州站和遂宁二站共8台机组的历史数据开展实例分析,相关实验结果表明:在所有方法中,高斯过程回归(Gaussian process regression,GPR)模型在均方根误差(ERMS)、平均绝对误差(EMA)、均方误差(EMS)、决定系数(R2)和最大个体误差(EMI)指标上综合表现最佳,R2逼近0.95;使用站上、站下水位代替传统的扬程对模型进行训练,所有模型的综合评价指标整体有所改善。综合来看,使用GPR模型并使用上游、下游水位代替扬程进行模拟效率表现最好,以邳州站4号机为例,可将模拟效率的EMA和EMI分别从16.49%和20.40%减少至0.41%和2.30%,研究成果具有一定实际意义,可为我国调水工程泵站经济运行提供有力支撑。