The Xiaolangdi Reservoir has entered the later sediment-retaining period, and new sediment transport phenomena and channel re-estab- lishing behaviors are appearing. A physical model test was used to forecast the scou...The Xiaolangdi Reservoir has entered the later sediment-retaining period, and new sediment transport phenomena and channel re-estab- lishing behaviors are appearing. A physical model test was used to forecast the scouring and silting trends of the lower Yellow River. Based on water and sediment data from the lower Yellow River during the period from 1960 to 2012, and using a statistical method, this paper analyzed the sediment transport in sediment-laden flows with different discharges and sediment concentrations in the lower Yellow River. The results show that rational water-sediment regulation is necessary to avoid silting in the later sediment-retaining period. The combination of 3 000 m^3/s 〈 Q 〈 4 000 m^3/s and 20 kg/m^3 〈 S 〈 60 kg/m^3 (where Q is the discharge and S is the sediment concentration) at the Huayuankou section is considered an optimal combination for equilibrium sediment transport in the lower Yellow River over a long period of time.展开更多
The clear identification and quantification of the factors affecting groundwater systems is crucial for protecting groundwater resources and ensuring safety in agricultural production.The Lower Yellow River(LYR)is a s...The clear identification and quantification of the factors affecting groundwater systems is crucial for protecting groundwater resources and ensuring safety in agricultural production.The Lower Yellow River(LYR)is a suspended river that replenishes groundwater continuously due to clear differences in the water head,especially in the Xinxiang section.Since its construction,the Xiaolangdi Reservoir has reversed the LYR’s deposition.To accurately determine the factors influencing the groundwater level(GWL),the study area was divided into five subzones based on hydrogeology.A dynamic factor model(DFM),variational mode decomposition(VMD),and a multiple linear regression model were used to identify and quantify the factors influencing the GWL.The impact of the suspended river on the groundwater before and after the construction of the Xiaolangdi Reservoir was examined.The results show that:(1)The rate of decrease in the GWL was 8.53×10^(–4)m/month,and the rate of decrease in the Yellow River water level(RWL)was 4.63×10^(–4)m/month.(2)Mountain front recharge(MFR)(scale=3 months)and precipitation(scale=9 months)were the dominant factors in subzones I and II,accounting for more than 40%of the fluctuation in the GWL.Subzone III was dominated by exploitation(scale=7 months)and precipitation(scale=12months),accounting for 28.43%,and 23.44%of changes in the GWL,respectively.In subzone IV,agricultural irrigation(scale=12 months)was the major factor,accounting for32.47%of GWL changes,while in subzone V,the RWL(scale=12 months)accounted for52.52%of these changes.(3)The Xiaolangdi Reservoir has increased the lateral seepage of the suspended river and altered the inter-annual distribution.The results of this study can provide a valuable reference for controlling groundwater overexploitation and ensuring water supply security.展开更多
Based on the measured discharge,sediment load,and cross-sectional data from 1986 to 2015 for the lower Yellow River,changes in the morphological parameters(width,depth,and cross-sectional geomorphic coefficient)of the...Based on the measured discharge,sediment load,and cross-sectional data from 1986 to 2015 for the lower Yellow River,changes in the morphological parameters(width,depth,and cross-sectional geomorphic coefficient)of the main channel are analyzed in this paper.The results show that before the operation of the Xiaolangdi Reservoir(XLDR)from 1986 to 1999,the main channel shrunk continually,with decreasing width and depth.The rate of reduction in its width decreased along the river whereas that of depth increased in the downstream direction.Because the rate of decrease in the width of the main channel was greater than that in channel depth,the cross-sectional geomorphic coefficient decreased in the sub-reach above Gaocun.By contrast,for the sub-reach below Gaocun,the rate of decrease in channel width was smaller than that in channel depth,and the cross-sectional geomorphic coefficient increased.Once the XLDR had begun operation,the main channel eroded continually,and both its width and depth increased from 2000 to 2015.The rate of increase in channel width decreased in the longitudinal direction,and the depth of the main channel in all sub-reaches increased by more than 2 m.Because the rate of increase in the depth of the main channel was clearly larger than that of its width,the cross-sectional geomorphic coefficient decreased in all sub-reaches.The cross-sectional geometry of the main-channel of the lower Yellow River exhibited different adjustment patterns before and after the XLDR began operation.Before its operation,the main channel mainly narrowed in the transverse direction and silted in the vertical direction in the sub-reach above Aishan;in the sub-reach below Aishan,it primarily silted in the vertical direction.After the XLDR began operation,the main channel adjusted by widening in the transverse direction and deepening in the vertical direction in the sub-reach above Aishan;in the sub-reach below it,the main channel adjusted mainly by deepening in the vertical direction.Compared with the rates of decrease in the width and depth of the main channel during the siltation period,the rate of increase in channel width during the scouring period was clearly smaller while the rate of increase in channel depth was larger.After continual siltation and scouring from 1986 to 2015,the cross-sectional geometry of the main-channel changed from wide and shallow to relatively narrow and deep.The pattern of adjustment in the main channel was closely related to the water and sediment conditions.For the braided reach,the cross-sectional geomorphic coefficient was negatively correlated with discharge and positively correlated with suspended sediment concentration(SSC)during the siltation period.By contrast,the cross-sectional geomorphic coefficient was positively correlated with discharge and negatively correlated with SSC during the scouring period.For the transitional and meandering reaches,the cross-sectional geomorphic coefficient was negatively correlated with discharge and positively correlated with SSC.展开更多
A mathematical model of river be d change downstream of the Xiaolangdi Reservoir was developed based on the most recent achievement of sediment theory in the Yellow River. The model was verified by the comparison of...A mathematical model of river be d change downstream of the Xiaolangdi Reservoir was developed based on the most recent achievement of sediment theory in the Yellow River. The model was verified by the comparison of computed results and measured data from 1986 to 1996. Num erical prediction of the erosion and deposition downstream of the Xiaolangdi Res ervoir in its first operation year was carried out, and a series of suggestions were given for reservoir operation mode in its early operation period.展开更多
基金supported by the National Natural Science Foundation of China(Grants No.51039004 and No.51079055)the High-Level Personnel Research Start-Up Funds of North China University of Water Resources and Electric Power(Grant No.201403)the Science and Technology Research Project of the Education Department of Henan Province(Grant No.14A570001)
文摘The Xiaolangdi Reservoir has entered the later sediment-retaining period, and new sediment transport phenomena and channel re-estab- lishing behaviors are appearing. A physical model test was used to forecast the scouring and silting trends of the lower Yellow River. Based on water and sediment data from the lower Yellow River during the period from 1960 to 2012, and using a statistical method, this paper analyzed the sediment transport in sediment-laden flows with different discharges and sediment concentrations in the lower Yellow River. The results show that rational water-sediment regulation is necessary to avoid silting in the later sediment-retaining period. The combination of 3 000 m^3/s 〈 Q 〈 4 000 m^3/s and 20 kg/m^3 〈 S 〈 60 kg/m^3 (where Q is the discharge and S is the sediment concentration) at the Huayuankou section is considered an optimal combination for equilibrium sediment transport in the lower Yellow River over a long period of time.
基金The Foundation of High-level Talents of Zhengzhou University,No.13432340370,No.134-32340364,No.135-32340122Project of the Ecological Environment Monitoring and Safety Center of Henan Province,No.SJCAQ-HT-2023-036。
文摘The clear identification and quantification of the factors affecting groundwater systems is crucial for protecting groundwater resources and ensuring safety in agricultural production.The Lower Yellow River(LYR)is a suspended river that replenishes groundwater continuously due to clear differences in the water head,especially in the Xinxiang section.Since its construction,the Xiaolangdi Reservoir has reversed the LYR’s deposition.To accurately determine the factors influencing the groundwater level(GWL),the study area was divided into five subzones based on hydrogeology.A dynamic factor model(DFM),variational mode decomposition(VMD),and a multiple linear regression model were used to identify and quantify the factors influencing the GWL.The impact of the suspended river on the groundwater before and after the construction of the Xiaolangdi Reservoir was examined.The results show that:(1)The rate of decrease in the GWL was 8.53×10^(–4)m/month,and the rate of decrease in the Yellow River water level(RWL)was 4.63×10^(–4)m/month.(2)Mountain front recharge(MFR)(scale=3 months)and precipitation(scale=9 months)were the dominant factors in subzones I and II,accounting for more than 40%of the fluctuation in the GWL.Subzone III was dominated by exploitation(scale=7 months)and precipitation(scale=12months),accounting for 28.43%,and 23.44%of changes in the GWL,respectively.In subzone IV,agricultural irrigation(scale=12 months)was the major factor,accounting for32.47%of GWL changes,while in subzone V,the RWL(scale=12 months)accounted for52.52%of these changes.(3)The Xiaolangdi Reservoir has increased the lateral seepage of the suspended river and altered the inter-annual distribution.The results of this study can provide a valuable reference for controlling groundwater overexploitation and ensuring water supply security.
基金Key Program of National Natural Science Foundation of China,No.51639005National Key R&D Program of China,No.2017YFC0405202,No.2016YFC0402406。
文摘Based on the measured discharge,sediment load,and cross-sectional data from 1986 to 2015 for the lower Yellow River,changes in the morphological parameters(width,depth,and cross-sectional geomorphic coefficient)of the main channel are analyzed in this paper.The results show that before the operation of the Xiaolangdi Reservoir(XLDR)from 1986 to 1999,the main channel shrunk continually,with decreasing width and depth.The rate of reduction in its width decreased along the river whereas that of depth increased in the downstream direction.Because the rate of decrease in the width of the main channel was greater than that in channel depth,the cross-sectional geomorphic coefficient decreased in the sub-reach above Gaocun.By contrast,for the sub-reach below Gaocun,the rate of decrease in channel width was smaller than that in channel depth,and the cross-sectional geomorphic coefficient increased.Once the XLDR had begun operation,the main channel eroded continually,and both its width and depth increased from 2000 to 2015.The rate of increase in channel width decreased in the longitudinal direction,and the depth of the main channel in all sub-reaches increased by more than 2 m.Because the rate of increase in the depth of the main channel was clearly larger than that of its width,the cross-sectional geomorphic coefficient decreased in all sub-reaches.The cross-sectional geometry of the main-channel of the lower Yellow River exhibited different adjustment patterns before and after the XLDR began operation.Before its operation,the main channel mainly narrowed in the transverse direction and silted in the vertical direction in the sub-reach above Aishan;in the sub-reach below Aishan,it primarily silted in the vertical direction.After the XLDR began operation,the main channel adjusted by widening in the transverse direction and deepening in the vertical direction in the sub-reach above Aishan;in the sub-reach below it,the main channel adjusted mainly by deepening in the vertical direction.Compared with the rates of decrease in the width and depth of the main channel during the siltation period,the rate of increase in channel width during the scouring period was clearly smaller while the rate of increase in channel depth was larger.After continual siltation and scouring from 1986 to 2015,the cross-sectional geometry of the main-channel changed from wide and shallow to relatively narrow and deep.The pattern of adjustment in the main channel was closely related to the water and sediment conditions.For the braided reach,the cross-sectional geomorphic coefficient was negatively correlated with discharge and positively correlated with suspended sediment concentration(SSC)during the siltation period.By contrast,the cross-sectional geomorphic coefficient was positively correlated with discharge and negatively correlated with SSC during the scouring period.For the transitional and meandering reaches,the cross-sectional geomorphic coefficient was negatively correlated with discharge and positively correlated with SSC.
基金Project supported by the National Natural Science Foundation of China. (No:59890200)
文摘A mathematical model of river be d change downstream of the Xiaolangdi Reservoir was developed based on the most recent achievement of sediment theory in the Yellow River. The model was verified by the comparison of computed results and measured data from 1986 to 1996. Num erical prediction of the erosion and deposition downstream of the Xiaolangdi Res ervoir in its first operation year was carried out, and a series of suggestions were given for reservoir operation mode in its early operation period.