Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- d...Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.展开更多
The loss of life risk evaluation model for dam break is built in this paper.By using an improved Monte Carlo method,the overtopping probability induced by concurrent flood and wind is calculated,and the Latin Hypercub...The loss of life risk evaluation model for dam break is built in this paper.By using an improved Monte Carlo method,the overtopping probability induced by concurrent flood and wind is calculated,and the Latin Hypercube Sampling is used to generate random numbers.The Graham method is used to calculate the loss of life resulting from dam failure.With Dongwushi reservoir located at Hebei Province taken as an example,the overtopping probability induced by concurrent flood and wind is calculated as 4.77×10-6.Los...展开更多
文摘Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.
基金Supported by Tianjin Natural Science Foundation(No.08JCZDJC25400,No.09JCYBJC08700)Major State Basic Research Development Program of China ("973" Program,No.2007CB714101)
文摘The loss of life risk evaluation model for dam break is built in this paper.By using an improved Monte Carlo method,the overtopping probability induced by concurrent flood and wind is calculated,and the Latin Hypercube Sampling is used to generate random numbers.The Graham method is used to calculate the loss of life resulting from dam failure.With Dongwushi reservoir located at Hebei Province taken as an example,the overtopping probability induced by concurrent flood and wind is calculated as 4.77×10-6.Los...