Han River to Wei River Water Diversion Project in Shaanxi Province is an inter-basin water diversion project approved by the State Council in 2005,which is a key hydraulic project in the 12th Five-Year Plan of China.I...Han River to Wei River Water Diversion Project in Shaanxi Province is an inter-basin water diversion project approved by the State Council in 2005,which is a key hydraulic project in the 12th Five-Year Plan of China.It is expected to solve water resources shortage in the Guanzhong area of Shaanxi Province,effectively curb the deterioration of ecological environment in Wei River and reduce environmental geological disasters in the Guanzhong area.It is a strategic project for optimal allocation of water resources by adjusting the distribution of water resources in Shaanxi Province and promoting the economic development of the Guanzhong-Tianshui Economic Zone.Implementation of the project is of great importance to the sustainable economic and social development of the Guanzhong area.The project crosses the Yangtze River and Yellow River basins and passes through the Qinling Mountain.The huge-scale project has a profound historic impact on the economic development in the region.展开更多
In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well...In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well as their impacts on the environment of the middle and lower reaches of the Hanjiang River. The results showed that the 95×10 8m 3 water diversion scheme will cause less erosion and water level decrease than the 15×10 8m 3 water diversion scheme. Using a water diversion scheme of 95×10 8m 3, the decrease of water quantity can impact the river hydrodynamic regime substantially and the environments of the middle and lower reaches of the Hanjiang River will be greatly affected. It is therefore necessary to develop new water resources or build projects to meet the need of the environment and the needs for navigation.展开更多
The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries(water-exporting area), to the upstrea...The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries(water-exporting area), to the upstream of the Yellow River(waterimporting area). The long-term hydrological data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow characteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, waterimporting area, and the stretch downstream of the water-exporting have synchronization in high–low flow relationship, whereas they display nonsynchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological compensation probability for rivers where water is diverted is about 25% to 10%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the waterexporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the waterexporting area.展开更多
文摘Han River to Wei River Water Diversion Project in Shaanxi Province is an inter-basin water diversion project approved by the State Council in 2005,which is a key hydraulic project in the 12th Five-Year Plan of China.It is expected to solve water resources shortage in the Guanzhong area of Shaanxi Province,effectively curb the deterioration of ecological environment in Wei River and reduce environmental geological disasters in the Guanzhong area.It is a strategic project for optimal allocation of water resources by adjusting the distribution of water resources in Shaanxi Province and promoting the economic development of the Guanzhong-Tianshui Economic Zone.Implementation of the project is of great importance to the sustainable economic and social development of the Guanzhong area.The project crosses the Yangtze River and Yellow River basins and passes through the Qinling Mountain.The huge-scale project has a profound historic impact on the economic development in the region.
文摘In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well as their impacts on the environment of the middle and lower reaches of the Hanjiang River. The results showed that the 95×10 8m 3 water diversion scheme will cause less erosion and water level decrease than the 15×10 8m 3 water diversion scheme. Using a water diversion scheme of 95×10 8m 3, the decrease of water quantity can impact the river hydrodynamic regime substantially and the environments of the middle and lower reaches of the Hanjiang River will be greatly affected. It is therefore necessary to develop new water resources or build projects to meet the need of the environment and the needs for navigation.
基金supported by the China Meteorological Data Sharing Service System,the Bureau of Hydrology,and Water Resources of Sichuan Province,China
文摘The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries(water-exporting area), to the upstream of the Yellow River(waterimporting area). The long-term hydrological data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow characteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, waterimporting area, and the stretch downstream of the water-exporting have synchronization in high–low flow relationship, whereas they display nonsynchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological compensation probability for rivers where water is diverted is about 25% to 10%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the waterexporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the waterexporting area.