In order to improve the source water quality of drinking water and mitigate the load of drinking water treatment plant, a pilot test was conducted with integrated horizontal flow constructed wetlands to pretreat the w...In order to improve the source water quality of drinking water and mitigate the load of drinking water treatment plant, a pilot test was conducted with integrated horizontal flow constructed wetlands to pretreat the water supply in the reservoirs of Yellow River. Resuhs show that under the hydraulic loading rate of 4 m^3/( m^2 · d), the average removal rates of chemical oxygen demand (COD), total nitrogen (TN), ammonium nitrogen ( NH4 ^+ - N), nitrate nitrogen ( NO3 ^- - N), nitrite - nitrogen ( NO2^ - - N) and total phosphorus (TP) in the horizontal flow constructed wetlands are 49. 68% , 53.01%, 48.48%, 53.61% , 62. 57% and 49. 56%, re- spectively. The study on purifying mechanism of the constructed wetlands indicates that the disposal of contamination by subsurface wetlands is the combined actions of physical chemistry, plants and microorganism.展开更多
The Xiaolangdi Reservoir has entered the later sediment-retaining period, and new sediment transport phenomena and channel re-estab- lishing behaviors are appearing. A physical model test was used to forecast the scou...The Xiaolangdi Reservoir has entered the later sediment-retaining period, and new sediment transport phenomena and channel re-estab- lishing behaviors are appearing. A physical model test was used to forecast the scouring and silting trends of the lower Yellow River. Based on water and sediment data from the lower Yellow River during the period from 1960 to 2012, and using a statistical method, this paper analyzed the sediment transport in sediment-laden flows with different discharges and sediment concentrations in the lower Yellow River. The results show that rational water-sediment regulation is necessary to avoid silting in the later sediment-retaining period. The combination of 3 000 m^3/s 〈 Q 〈 4 000 m^3/s and 20 kg/m^3 〈 S 〈 60 kg/m^3 (where Q is the discharge and S is the sediment concentration) at the Huayuankou section is considered an optimal combination for equilibrium sediment transport in the lower Yellow River over a long period of time.展开更多
This note analyzes the change in water renewal time characteristics based on res- ervoir action and then establishes calculation models for the water renewal time in the Yellow River mainstream. The results indicate t...This note analyzes the change in water renewal time characteristics based on res- ervoir action and then establishes calculation models for the water renewal time in the Yellow River mainstream. The results indicate that the amount of renewable water with reservoir action can meet the annual water demand and that water flows naturally at the Lijin station near estuary. Initial storage dynamics is an important factor in water resource renewable capacity at a certain time, and rational reservoir action can promote sustainable water re- source utilization. When the initial storages in the Longyang Gorge reservoir are 9,343 and 5.343 billion m3, the water renewal times are 28 and 33.9 d, respectively. Flow stoppage appears in April and May.展开更多
Based on the measured discharge,sediment load,and cross-sectional data from 1986 to 2015 for the lower Yellow River,changes in the morphological parameters(width,depth,and cross-sectional geomorphic coefficient)of the...Based on the measured discharge,sediment load,and cross-sectional data from 1986 to 2015 for the lower Yellow River,changes in the morphological parameters(width,depth,and cross-sectional geomorphic coefficient)of the main channel are analyzed in this paper.The results show that before the operation of the Xiaolangdi Reservoir(XLDR)from 1986 to 1999,the main channel shrunk continually,with decreasing width and depth.The rate of reduction in its width decreased along the river whereas that of depth increased in the downstream direction.Because the rate of decrease in the width of the main channel was greater than that in channel depth,the cross-sectional geomorphic coefficient decreased in the sub-reach above Gaocun.By contrast,for the sub-reach below Gaocun,the rate of decrease in channel width was smaller than that in channel depth,and the cross-sectional geomorphic coefficient increased.Once the XLDR had begun operation,the main channel eroded continually,and both its width and depth increased from 2000 to 2015.The rate of increase in channel width decreased in the longitudinal direction,and the depth of the main channel in all sub-reaches increased by more than 2 m.Because the rate of increase in the depth of the main channel was clearly larger than that of its width,the cross-sectional geomorphic coefficient decreased in all sub-reaches.The cross-sectional geometry of the main-channel of the lower Yellow River exhibited different adjustment patterns before and after the XLDR began operation.Before its operation,the main channel mainly narrowed in the transverse direction and silted in the vertical direction in the sub-reach above Aishan;in the sub-reach below Aishan,it primarily silted in the vertical direction.After the XLDR began operation,the main channel adjusted by widening in the transverse direction and deepening in the vertical direction in the sub-reach above Aishan;in the sub-reach below it,the main channel adjusted mainly by deepening in the vertical direction.Compared with the rates of decrease in the width and depth of the main channel during the siltation period,the rate of increase in channel width during the scouring period was clearly smaller while the rate of increase in channel depth was larger.After continual siltation and scouring from 1986 to 2015,the cross-sectional geometry of the main-channel changed from wide and shallow to relatively narrow and deep.The pattern of adjustment in the main channel was closely related to the water and sediment conditions.For the braided reach,the cross-sectional geomorphic coefficient was negatively correlated with discharge and positively correlated with suspended sediment concentration(SSC)during the siltation period.By contrast,the cross-sectional geomorphic coefficient was positively correlated with discharge and negatively correlated with SSC during the scouring period.For the transitional and meandering reaches,the cross-sectional geomorphic coefficient was negatively correlated with discharge and positively correlated with SSC.展开更多
基金Sponsored by the National High Technology Research and Development Program (863) of China (Grant No.2006AA06Z303)the National Natural Sci-ence Foundation of China(Grant No.40671004)the Program for Young Academic Backbone of Harbin Normal University(Grant No.KGB200821)
文摘In order to improve the source water quality of drinking water and mitigate the load of drinking water treatment plant, a pilot test was conducted with integrated horizontal flow constructed wetlands to pretreat the water supply in the reservoirs of Yellow River. Resuhs show that under the hydraulic loading rate of 4 m^3/( m^2 · d), the average removal rates of chemical oxygen demand (COD), total nitrogen (TN), ammonium nitrogen ( NH4 ^+ - N), nitrate nitrogen ( NO3 ^- - N), nitrite - nitrogen ( NO2^ - - N) and total phosphorus (TP) in the horizontal flow constructed wetlands are 49. 68% , 53.01%, 48.48%, 53.61% , 62. 57% and 49. 56%, re- spectively. The study on purifying mechanism of the constructed wetlands indicates that the disposal of contamination by subsurface wetlands is the combined actions of physical chemistry, plants and microorganism.
基金supported by the National Natural Science Foundation of China(Grants No.51039004 and No.51079055)the High-Level Personnel Research Start-Up Funds of North China University of Water Resources and Electric Power(Grant No.201403)the Science and Technology Research Project of the Education Department of Henan Province(Grant No.14A570001)
文摘The Xiaolangdi Reservoir has entered the later sediment-retaining period, and new sediment transport phenomena and channel re-estab- lishing behaviors are appearing. A physical model test was used to forecast the scouring and silting trends of the lower Yellow River. Based on water and sediment data from the lower Yellow River during the period from 1960 to 2012, and using a statistical method, this paper analyzed the sediment transport in sediment-laden flows with different discharges and sediment concentrations in the lower Yellow River. The results show that rational water-sediment regulation is necessary to avoid silting in the later sediment-retaining period. The combination of 3 000 m^3/s 〈 Q 〈 4 000 m^3/s and 20 kg/m^3 〈 S 〈 60 kg/m^3 (where Q is the discharge and S is the sediment concentration) at the Huayuankou section is considered an optimal combination for equilibrium sediment transport in the lower Yellow River over a long period of time.
基金National Key Basic Research Development of China (973 Program), No.2011CB40330305
文摘This note analyzes the change in water renewal time characteristics based on res- ervoir action and then establishes calculation models for the water renewal time in the Yellow River mainstream. The results indicate that the amount of renewable water with reservoir action can meet the annual water demand and that water flows naturally at the Lijin station near estuary. Initial storage dynamics is an important factor in water resource renewable capacity at a certain time, and rational reservoir action can promote sustainable water re- source utilization. When the initial storages in the Longyang Gorge reservoir are 9,343 and 5.343 billion m3, the water renewal times are 28 and 33.9 d, respectively. Flow stoppage appears in April and May.
基金Key Program of National Natural Science Foundation of China,No.51639005National Key R&D Program of China,No.2017YFC0405202,No.2016YFC0402406。
文摘Based on the measured discharge,sediment load,and cross-sectional data from 1986 to 2015 for the lower Yellow River,changes in the morphological parameters(width,depth,and cross-sectional geomorphic coefficient)of the main channel are analyzed in this paper.The results show that before the operation of the Xiaolangdi Reservoir(XLDR)from 1986 to 1999,the main channel shrunk continually,with decreasing width and depth.The rate of reduction in its width decreased along the river whereas that of depth increased in the downstream direction.Because the rate of decrease in the width of the main channel was greater than that in channel depth,the cross-sectional geomorphic coefficient decreased in the sub-reach above Gaocun.By contrast,for the sub-reach below Gaocun,the rate of decrease in channel width was smaller than that in channel depth,and the cross-sectional geomorphic coefficient increased.Once the XLDR had begun operation,the main channel eroded continually,and both its width and depth increased from 2000 to 2015.The rate of increase in channel width decreased in the longitudinal direction,and the depth of the main channel in all sub-reaches increased by more than 2 m.Because the rate of increase in the depth of the main channel was clearly larger than that of its width,the cross-sectional geomorphic coefficient decreased in all sub-reaches.The cross-sectional geometry of the main-channel of the lower Yellow River exhibited different adjustment patterns before and after the XLDR began operation.Before its operation,the main channel mainly narrowed in the transverse direction and silted in the vertical direction in the sub-reach above Aishan;in the sub-reach below Aishan,it primarily silted in the vertical direction.After the XLDR began operation,the main channel adjusted by widening in the transverse direction and deepening in the vertical direction in the sub-reach above Aishan;in the sub-reach below it,the main channel adjusted mainly by deepening in the vertical direction.Compared with the rates of decrease in the width and depth of the main channel during the siltation period,the rate of increase in channel width during the scouring period was clearly smaller while the rate of increase in channel depth was larger.After continual siltation and scouring from 1986 to 2015,the cross-sectional geometry of the main-channel changed from wide and shallow to relatively narrow and deep.The pattern of adjustment in the main channel was closely related to the water and sediment conditions.For the braided reach,the cross-sectional geomorphic coefficient was negatively correlated with discharge and positively correlated with suspended sediment concentration(SSC)during the siltation period.By contrast,the cross-sectional geomorphic coefficient was positively correlated with discharge and negatively correlated with SSC during the scouring period.For the transitional and meandering reaches,the cross-sectional geomorphic coefficient was negatively correlated with discharge and positively correlated with SSC.