On November 1973, about one month after the cease-fire at the end of the Yom Kippur War, the Arab League decided that the Palestine Liberation Organization (PLO) was the sole representative of the Palestinian people...On November 1973, about one month after the cease-fire at the end of the Yom Kippur War, the Arab League decided that the Palestine Liberation Organization (PLO) was the sole representative of the Palestinian people. This article examines the contribution of the PLO to the war effort of the Arab countries during the Yom Kippur War, the influence of the war upon the Palestinian problem, the Palestinian military contribution to the Arab war effort, Jordan's non-participation in the Yom Kippur War and the Egyptian attempt to include the PLO as the representative of the Palestinian people in future negotiations with Israel and the U.S. which enabled the PLO recognition as the Palestinians sole representative for 30 years.展开更多
The study area is located in the Lower Yom River Basin covering an area of about 970 km^2 in the lower part of Northern Thailand, which is underlain by sequences of unconsolidated alluvial deposits derived from the Yo...The study area is located in the Lower Yom River Basin covering an area of about 970 km^2 in the lower part of Northern Thailand, which is underlain by sequences of unconsolidated alluvial deposits derived from the Yom and Nan River floodplains. Groundwater has been heavily exploited largely for agriculture from the shallow gravel, sand and silt aquifer in the basin. Drastically declining water levels, up to 10 m in some areas, has been observed within the past decade, creating difficulties with lift irrigation for the local farmers. Therefore, the Department of Groundwater Resources, Thailand, considers that groundwater artificial recharge may be useful for recovering the static water levels within the most hydrogeological suitable areas. The objective of the paper is to rank the suitability of sub-watershed in the Lower Yom River Basin for conducting a pilot-scale testing of MAR (managed aquifer recharge) by ponding system. Hydrogeological and non-hydrogeological parameters were used to formulate the site selection criteria. Boolean logic and Fuzzy logic were used for delineating the 19 sub-watersheds in the Lan Ba watershed. Detailed hydrogeological investigations were conducted in the 10 most prospective sub-watersheds. Of these, the Nong Na 3 sub-watershed covering an area of about 500 hectares was determined to be the most appropriate site for the MAR pilot construction and testing.展开更多
突发疫情引发着对成熟的线上教学技术的诉求。社会对本科人才的多元需求,本科毕业人才需要具有较强的适应性,同时学生知识基础差异增大。该文提出一种过程性考核方式——动态学情分析平台,是对线上、线下教学均适配的闭环反馈体系,重视...突发疫情引发着对成熟的线上教学技术的诉求。社会对本科人才的多元需求,本科毕业人才需要具有较强的适应性,同时学生知识基础差异增大。该文提出一种过程性考核方式——动态学情分析平台,是对线上、线下教学均适配的闭环反馈体系,重视启发与激励学生的多样思维,并给出教师团队的标准化评核回馈。通过课前YOM(Yesterday Once More)与课后多周期循环学情分析的方式,接纳各种形式的思考,并予以等级评价,给出细则评论。反复交互中不断完善学生思考过程,直至产生可见性结果。积分制使得教学积累得以实现,增加过程性考核模式。专业教师团队针对两届工程类专业学生进行了教学初步实践,数据分析与问卷调查表明,初步试行的学情分析与排行榜,在成绩评定公正认定、期末成绩提升、学生毕业设计选择中,均起到正面、积极的显著作用。展开更多
文摘On November 1973, about one month after the cease-fire at the end of the Yom Kippur War, the Arab League decided that the Palestine Liberation Organization (PLO) was the sole representative of the Palestinian people. This article examines the contribution of the PLO to the war effort of the Arab countries during the Yom Kippur War, the influence of the war upon the Palestinian problem, the Palestinian military contribution to the Arab war effort, Jordan's non-participation in the Yom Kippur War and the Egyptian attempt to include the PLO as the representative of the Palestinian people in future negotiations with Israel and the U.S. which enabled the PLO recognition as the Palestinians sole representative for 30 years.
文摘The study area is located in the Lower Yom River Basin covering an area of about 970 km^2 in the lower part of Northern Thailand, which is underlain by sequences of unconsolidated alluvial deposits derived from the Yom and Nan River floodplains. Groundwater has been heavily exploited largely for agriculture from the shallow gravel, sand and silt aquifer in the basin. Drastically declining water levels, up to 10 m in some areas, has been observed within the past decade, creating difficulties with lift irrigation for the local farmers. Therefore, the Department of Groundwater Resources, Thailand, considers that groundwater artificial recharge may be useful for recovering the static water levels within the most hydrogeological suitable areas. The objective of the paper is to rank the suitability of sub-watershed in the Lower Yom River Basin for conducting a pilot-scale testing of MAR (managed aquifer recharge) by ponding system. Hydrogeological and non-hydrogeological parameters were used to formulate the site selection criteria. Boolean logic and Fuzzy logic were used for delineating the 19 sub-watersheds in the Lan Ba watershed. Detailed hydrogeological investigations were conducted in the 10 most prospective sub-watersheds. Of these, the Nong Na 3 sub-watershed covering an area of about 500 hectares was determined to be the most appropriate site for the MAR pilot construction and testing.
文摘突发疫情引发着对成熟的线上教学技术的诉求。社会对本科人才的多元需求,本科毕业人才需要具有较强的适应性,同时学生知识基础差异增大。该文提出一种过程性考核方式——动态学情分析平台,是对线上、线下教学均适配的闭环反馈体系,重视启发与激励学生的多样思维,并给出教师团队的标准化评核回馈。通过课前YOM(Yesterday Once More)与课后多周期循环学情分析的方式,接纳各种形式的思考,并予以等级评价,给出细则评论。反复交互中不断完善学生思考过程,直至产生可见性结果。积分制使得教学积累得以实现,增加过程性考核模式。专业教师团队针对两届工程类专业学生进行了教学初步实践,数据分析与问卷调查表明,初步试行的学情分析与排行榜,在成绩评定公正认定、期末成绩提升、学生毕业设计选择中,均起到正面、积极的显著作用。