In the background of the construction of Sutong Yangtze River Bridge(short as Sutong Bridge),the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced.Some key construct...In the background of the construction of Sutong Yangtze River Bridge(short as Sutong Bridge),the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced.Some key construction techniques,such as outspreading cable on deck,installing cable at pylon,pulling and fixing cable at the attachment with decks and cable PE sheath protection are discussed.展开更多
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de...Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.展开更多
基金National Science and Technology Support Program of China(No.2006BAG04B02)
文摘In the background of the construction of Sutong Yangtze River Bridge(short as Sutong Bridge),the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced.Some key construction techniques,such as outspreading cable on deck,installing cable at pylon,pulling and fixing cable at the attachment with decks and cable PE sheath protection are discussed.
文摘Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.