With the increase of wind power capacity in China, the situation of curtailment of wind power is getting worse. An annual sequence production simulation model is established with maximum wind power consumption as the ...With the increase of wind power capacity in China, the situation of curtailment of wind power is getting worse. An annual sequence production simulation model is established with maximum wind power consumption as the objective function. The calculation of specific power grid operation in 2013 verifies the precision of this model. The impact of different factors on wind power accommodation as well as the impact of power grid reserve, wind resources and load on wind power curtailment is analyzed. The calculation results quantify the impact of different factors from power system to the accommodation of wind power and provide reference to solving the problem of wind power curtailment.展开更多
To solve the severe problem of wind power curtailment in the winter heating period caused by "power determined by heat" operation constraint of cogeneration units, this paper analyzes thermoelectric load, wind power...To solve the severe problem of wind power curtailment in the winter heating period caused by "power determined by heat" operation constraint of cogeneration units, this paper analyzes thermoelectric load, wind power output distribution and fluctuation characteristics at different time scales, and finally proposes a two level coordinated control strategy based on electric heat storage and pumped storage. The optimization target of the first level coordinated control is the lowest operation cost and the largest wind power utilization rate. Based on prediction of thermoelectric load and wind power, the operation economy of the system and wind power accommodation level are improved with the cooperation of electric heat storage and pumped storage in regulation capacity. The second level coordinated control stabilizes wind power real time fluctuations by cooperating electric heat storage and pumped storage in control speed. The example results of actual wind farms in Jiuquan, Gansu verifies the feasibility and effectiveness of the proposed coordinated control strategy.展开更多
在风-火-核-碳捕集多源联合系统中,核电机组在参与电网调峰时存在调峰深度选择不精确的问题。此外,该多源联合系统还存在风电消纳不足的问题。为此,构建了一种计及线性化核电机组调峰深度模型的电转气(power to gas,P2G)-风-火-核-碳捕...在风-火-核-碳捕集多源联合系统中,核电机组在参与电网调峰时存在调峰深度选择不精确的问题。此外,该多源联合系统还存在风电消纳不足的问题。为此,构建了一种计及线性化核电机组调峰深度模型的电转气(power to gas,P2G)-风-火-核-碳捕集多源联合系统,并对该系统进行了日前优化调度。首先,基于核电机组负荷跟踪模式,通过引入连续变量,提高了调峰深度选择的准确性;然后,分析了碳捕集电厂-P2G联合运行模式及需求响应资源对促进风电消纳的积极作用;最后,以系统综合运行成本最低为目标函数,同时考虑碳交易机制,在Matlab平台搭建仿真模型,验证了所构建多源联合系统的有效性。结果表明,相较于核电机组采用固定调峰档位的多源联合系统,所构建的多源联合系统能够在保证核电机组安全稳定运行的同时,实现风电完全消纳,系统碳排放量与综合运行成本分别下降了13.74%与6.27%,提高了系统运行的低碳性与经济性。展开更多
文摘With the increase of wind power capacity in China, the situation of curtailment of wind power is getting worse. An annual sequence production simulation model is established with maximum wind power consumption as the objective function. The calculation of specific power grid operation in 2013 verifies the precision of this model. The impact of different factors on wind power accommodation as well as the impact of power grid reserve, wind resources and load on wind power curtailment is analyzed. The calculation results quantify the impact of different factors from power system to the accommodation of wind power and provide reference to solving the problem of wind power curtailment.
基金National Natural Science Foundation of China(No.61663019)
文摘To solve the severe problem of wind power curtailment in the winter heating period caused by "power determined by heat" operation constraint of cogeneration units, this paper analyzes thermoelectric load, wind power output distribution and fluctuation characteristics at different time scales, and finally proposes a two level coordinated control strategy based on electric heat storage and pumped storage. The optimization target of the first level coordinated control is the lowest operation cost and the largest wind power utilization rate. Based on prediction of thermoelectric load and wind power, the operation economy of the system and wind power accommodation level are improved with the cooperation of electric heat storage and pumped storage in regulation capacity. The second level coordinated control stabilizes wind power real time fluctuations by cooperating electric heat storage and pumped storage in control speed. The example results of actual wind farms in Jiuquan, Gansu verifies the feasibility and effectiveness of the proposed coordinated control strategy.
文摘在风-火-核-碳捕集多源联合系统中,核电机组在参与电网调峰时存在调峰深度选择不精确的问题。此外,该多源联合系统还存在风电消纳不足的问题。为此,构建了一种计及线性化核电机组调峰深度模型的电转气(power to gas,P2G)-风-火-核-碳捕集多源联合系统,并对该系统进行了日前优化调度。首先,基于核电机组负荷跟踪模式,通过引入连续变量,提高了调峰深度选择的准确性;然后,分析了碳捕集电厂-P2G联合运行模式及需求响应资源对促进风电消纳的积极作用;最后,以系统综合运行成本最低为目标函数,同时考虑碳交易机制,在Matlab平台搭建仿真模型,验证了所构建多源联合系统的有效性。结果表明,相较于核电机组采用固定调峰档位的多源联合系统,所构建的多源联合系统能够在保证核电机组安全稳定运行的同时,实现风电完全消纳,系统碳排放量与综合运行成本分别下降了13.74%与6.27%,提高了系统运行的低碳性与经济性。