期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Image-Aided Analysis of Ballast Particle Movement Along a High-Speed Railway
1
作者 Xuecheng Bian Wenqing Cai +2 位作者 Zheng Luo Chuang Zhao Yunmin Chen 《Engineering》 SCIE EI CAS CSCD 2023年第8期161-177,共17页
As a core infrastructure of high-speed railways,ballast layers constituted by graded crushed stones feature noteworthy particle movement compared with normal railways,which may cause excessive settlement and have detr... As a core infrastructure of high-speed railways,ballast layers constituted by graded crushed stones feature noteworthy particle movement compared with normal railways,which may cause excessive settlement and have detrimental effects on train operation.However,the movement behavior remains ambiguous due to a lack of effective measurement approaches and analytical methods.In this study,an image-aided technique was developed in a full-scale model test using digital cameras and a colorbased identification approach.A total of 1274 surface ballast particles were manually dyed by discernible colors to serve as tracers in the test.The movements of the surface ballast particles were tracked using the varied pixels displaying tracers in the photos that were intermittently taken during the test in the perpendicular direction.The movement behavior of ballast particles under different combinations of train speeds and axle loads was quantitatively evaluated.The obtained results indicated that the surface ballast particle movements were slight,mainly concentrated near sleepers under low-speed train loads and greatly amplified and extended to the whole surface when the train speed reached 360 km.h-1.Additionally,the development of ballast particle displacement statistically resembled its rotation.Track vibration contributed to the movements of ballast particles,which specifically were driven by vertical acceleration near the track center and horizontal acceleration at the track edge.Furthermore,the development trends of ballast particle movements and track settlement under long-term train loading were similar,and both stabilized at nearly the same time.The track performance,including the vibration characteristics,accumulated settlement,and sleeper support stiffness,was determined to be closely related to the direction and distribution of ballast particle flow,which partly deteriorated under high-speed train loads. 展开更多
关键词 High-speed railway Full-scale model test Image-aided technique Ballast particle movement Track vibration accumulated settlement
下载PDF
Accumulative deformation in railway track induced by high-speed traffic loading of the trains 被引量:18
2
作者 Bian Xuecheng Jiang Hongguang Chen Yunmin 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2010年第3期319-326,共8页
Prediction and control of the permanent settlement of a track caused by traffic loading from trains is crucial to high-speed railway design and maintenance. In this study, a unified prediction model of accumulative de... Prediction and control of the permanent settlement of a track caused by traffic loading from trains is crucial to high-speed railway design and maintenance. In this study, a unified prediction model of accumulative deformation of geomaterials used in railway construction subjected to cyclic loadings is introduced and calibrated using physical model testing. Based on this versatile model, a calculation approach to determine the track structure settlement under repeated loadings caused by the movement of the wheel axle of the train is proposed. Regression analysis on the physical model testing is adopted to determine the parameters involved in the computational approach. Comparison of model test data and computed results shows that the parameters obtained from the back-analysis are consistent throughout the various testing conditions, and the proposed calculation approach is capable of satisfactorily predicting the accumulative settlement of the railway roadbed and subgrade soil for various axle loads and loading cycles. A case study of a high-speed railway is performed to demonstrate the feasibility of the proposed approach in realistic engineering applications. The computation results from the settlement development of a roadbed and subgrade soil are presented and discussed. 展开更多
关键词 cyclic loading AGGREGATE clay accumulative settlement high-speed railway
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部