With the rapid development of flexible interconnection technology in active distribution networks(ADNs),many power electronic devices have been employed to improve system operational performance.As a novel fully-con-t...With the rapid development of flexible interconnection technology in active distribution networks(ADNs),many power electronic devices have been employed to improve system operational performance.As a novel fully-con-trolled power electronic device,energy storage integrated soft open point(ESOP)is gradually replacing traditional switches.This can significantly enhance the controllability of ADNs.To facilitate the utilization of ESOP,device loca-tions and capacities should be configured optimally.Thus,this paper proposes a multi-stage expansion planning method of ESOP with the consideration of tie-line reconstruction.First,based on multi-terminal modular design characteristics,the ESOP planning model is established.A multi-stage planning framework of ESOP is then presented,in which the evolutionary relationship among different planning schemes is analyzed.Based on this framework,a multi-stage planning method of ESOP with consideration of tie-line reconstruction is subsequently proposed.Finally,case studies are conducted on a modified practical distribution network,and the cost-benefit analysis of device and multiple impact factors are given to prove the effectiveness of the proposed method.展开更多
基金supported by the National Natural Science Foundation of China (51977139,52061635103)Tianjin Science Foundation for Youths (21JCQNJC00430)Science and Technology Project of State Grid Tianjin Electric Power Co. (KJ21-1-36).
文摘With the rapid development of flexible interconnection technology in active distribution networks(ADNs),many power electronic devices have been employed to improve system operational performance.As a novel fully-con-trolled power electronic device,energy storage integrated soft open point(ESOP)is gradually replacing traditional switches.This can significantly enhance the controllability of ADNs.To facilitate the utilization of ESOP,device loca-tions and capacities should be configured optimally.Thus,this paper proposes a multi-stage expansion planning method of ESOP with the consideration of tie-line reconstruction.First,based on multi-terminal modular design characteristics,the ESOP planning model is established.A multi-stage planning framework of ESOP is then presented,in which the evolutionary relationship among different planning schemes is analyzed.Based on this framework,a multi-stage planning method of ESOP with consideration of tie-line reconstruction is subsequently proposed.Finally,case studies are conducted on a modified practical distribution network,and the cost-benefit analysis of device and multiple impact factors are given to prove the effectiveness of the proposed method.