Following a small-scale wedge failure at Yukon Zinc's Wolverine Mine in Yukon, Canada, a vibration monitoring program was added to the existing rockbolt pull testing regime. The failure in the 1150 drift occurred aft...Following a small-scale wedge failure at Yukon Zinc's Wolverine Mine in Yukon, Canada, a vibration monitoring program was added to the existing rockbolt pull testing regime. The failure in the 1150 drift occurred after numerous successive blasts in an adjacent tunnel had loosened friction bolts passing through an unmapped fault. Analysis of blasting vibration revealed that support integrity is not compromised unless there is a geological structure to act as a failure plane. The peak particle velocity(PPV) rarely exceeded 250 mm/s with a frequency larger than 50 Hz. As expected, blasting more competent rock resulted in higher PPVs. In such cases, reducing the round length from 3.5 m to 2.0 m was an effective means of limiting potential rock mass and support damage.展开更多
为减少由光照强度差异引发的交通事故,以新伊高速公路工程为依托,在宋家凹—水沟河毗邻隧道连接段设置钢筋混凝土与钢结构组合形式的遮阳棚,计算限行速度下遮阳棚的长度,运用DIALux仿真软件对不同时间点下的2种工况进行研究,并采用碳排...为减少由光照强度差异引发的交通事故,以新伊高速公路工程为依托,在宋家凹—水沟河毗邻隧道连接段设置钢筋混凝土与钢结构组合形式的遮阳棚,计算限行速度下遮阳棚的长度,运用DIALux仿真软件对不同时间点下的2种工况进行研究,并采用碳排放因子法分析不同工况下的碳排放量。结果表明:该毗邻隧道连接段遮阳棚长度为100 m。设置遮阳棚后,路面照度降低率达到57.97%,照度总均匀度大于0.4,现场实测值与模拟值误差在10%范围内,均满足相关标准的要求。此外,设置遮阳棚后,每年减少碳排放量82.56 t CO_(2)e,运营2.8 a后可弥补建造时产生的碳排放,建设成本将在3.7 a后收回。在使用寿命期内,可减少碳排放量3 795.74 t CO_(2)e,节约成本577.31万元,实现了减排和节约成本的双重效果。展开更多
As part of the digital mine system, a real time emergency route generating algorithm for a large scale metal mine is studied. The tunnel is abstracted and mathematically described by the center line model. A series of...As part of the digital mine system, a real time emergency route generating algorithm for a large scale metal mine is studied. The tunnel is abstracted and mathematically described by the center line model. A series of definitions are made and the center lines are regularized. In order to improve the quality of the final routes, a center line dataset preprocessing is done according to the factors including the slope threshold and the tunnel closed state information, etc. While in preprocessing, the mineshaft and shaft with the steep slope are excluded implicitly. The interface is preserved for point-like objects (e.g. blowers), directions (e.g. wind direction of blowers) and so on. The final path finding algorithm is optimized by the filter operation that the calculation is only performed at the endpoints and hub points, which can further reduce computing data amount. In our experiment, 3 368 nodes out of 22 401 nodes are selected as key nodes, therefore, the data processing amount of the algorithm is reduced to 1/7 and the routes can be found in real time. The algorithm is implemented and integrated into the final digital mine system.展开更多
文摘Following a small-scale wedge failure at Yukon Zinc's Wolverine Mine in Yukon, Canada, a vibration monitoring program was added to the existing rockbolt pull testing regime. The failure in the 1150 drift occurred after numerous successive blasts in an adjacent tunnel had loosened friction bolts passing through an unmapped fault. Analysis of blasting vibration revealed that support integrity is not compromised unless there is a geological structure to act as a failure plane. The peak particle velocity(PPV) rarely exceeded 250 mm/s with a frequency larger than 50 Hz. As expected, blasting more competent rock resulted in higher PPVs. In such cases, reducing the round length from 3.5 m to 2.0 m was an effective means of limiting potential rock mass and support damage.
文摘为减少由光照强度差异引发的交通事故,以新伊高速公路工程为依托,在宋家凹—水沟河毗邻隧道连接段设置钢筋混凝土与钢结构组合形式的遮阳棚,计算限行速度下遮阳棚的长度,运用DIALux仿真软件对不同时间点下的2种工况进行研究,并采用碳排放因子法分析不同工况下的碳排放量。结果表明:该毗邻隧道连接段遮阳棚长度为100 m。设置遮阳棚后,路面照度降低率达到57.97%,照度总均匀度大于0.4,现场实测值与模拟值误差在10%范围内,均满足相关标准的要求。此外,设置遮阳棚后,每年减少碳排放量82.56 t CO_(2)e,运营2.8 a后可弥补建造时产生的碳排放,建设成本将在3.7 a后收回。在使用寿命期内,可减少碳排放量3 795.74 t CO_(2)e,节约成本577.31万元,实现了减排和节约成本的双重效果。
文摘以圆形截面桩为例,基于修正后的Loganathan公式,利用文克尔弹性地基梁模型、m法计算理论和荷载传递法,建立盾构隧道近接斜交侧穿既有桥梁桩基的变形计算方法.通过现场监测结果验证计算方法的工程适用性,并利用该方法分析侧穿桥梁桩基施工引起桩身水平挠曲变形的主要影响因素.结果表明:桩身水平位移和桩顶竖向位移的理论计算结果与监测结果之间的最大误差分别不超过14.6%和2.7%.与现有方法相比,所提方法的计算结果更接近实测值.入土段桩身水平挠曲程度与隧道轴心和桩基中心轴线之间的水平距离、隧道侧穿斜交角呈负相关;最大水平挠曲位移与隧道侧穿斜交角呈负相关.当水平侧穿距离为6.0 m时,最大水平挠曲变形为7.4 mm;当隧道盾构侧穿斜交角为70.0°时,入土段桩身最大水平挠曲位移为15.4 mm.
基金Project(41161071)supported by the National Natural Science Foundation of China
文摘As part of the digital mine system, a real time emergency route generating algorithm for a large scale metal mine is studied. The tunnel is abstracted and mathematically described by the center line model. A series of definitions are made and the center lines are regularized. In order to improve the quality of the final routes, a center line dataset preprocessing is done according to the factors including the slope threshold and the tunnel closed state information, etc. While in preprocessing, the mineshaft and shaft with the steep slope are excluded implicitly. The interface is preserved for point-like objects (e.g. blowers), directions (e.g. wind direction of blowers) and so on. The final path finding algorithm is optimized by the filter operation that the calculation is only performed at the endpoints and hub points, which can further reduce computing data amount. In our experiment, 3 368 nodes out of 22 401 nodes are selected as key nodes, therefore, the data processing amount of the algorithm is reduced to 1/7 and the routes can be found in real time. The algorithm is implemented and integrated into the final digital mine system.